Adera Solar
Road 12 and Avenue 25 1/2, Chowchilla, CA 94105Plant Summary Information
Adera Solar is ranked #245 out of 885 solar farms in California in terms of total annual net electricity generation.
Adera Solar generated 5.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Adera Solar |
|---|---|
| Utility Name | AES Distributed Energy |
| Location | Madera County, CA |
| Initial Operation Date | December 2015 |
| Last Update | Dec 2025 |
| Annual Generation | 32.7 GWh |
| Annual Consumption | 117.7 k MMBtu |
| Ranked #4,742 out of 13,081 Power Plants Nationwide | |
| Ranked #1,339 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #581 out of 1,606 California Power Plants | |
| Ranked #245 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Sustainable Power Group, LLC (2015 to 2020) AES Distributed Energy (2021 to 2025) |
Map of Adera Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Adera Solar.
Monthly Net Generation for Adera Solar
Monthly Plant Fuel Consumption for Adera Solar
Adera Solar Details
| Summary Information | |
|---|---|
| Plant Name | Adera Solar (60027) |
| Plant Address | Road 12 and Avenue 25 1/2, Chowchilla, CA 94105 |
| Utility | AES Distributed Energy (61012) |
| Latitude, Longitude | 37.12059, -120.32488 |
| Generation Dates on File | Dec 2015 to Dec 2025 |
| Initial Operation Date | December 2015 |
| Annual Generation | 32.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF.16.147.000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator ADERA Details Operating December 2015
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ADERAG1_7_N001 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | ADERAG1_7_N001 |
| Nameplate Capacity | 20 MW |
| Summer Capacity | 19 MW |
| Winter Capacity | 19 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 26.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Adera Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1329 | Paloma Solar Hybrid | Gila Bend, AZ | 30.2 GWh |
| #1330 | Saddle Mountain Solar I | Tonopah, AZ | 33.3 GWh |
| #1331 | Whitehouse Solar Farm | Louisa, VA | 33.3 GWh |
| #1332 | Apple Data Center PV3 | Conover, NC | 33.2 GWh |
| #1333 | Hecate Energy Cherrydale LLC | Cape Charles, VA | 33.2 GWh |
| #1334 | NY8 - ELP Stillwater Solar | Mechanicville, NY | 33.2 GWh |
| #1335 | Imperial Valley Solar Company 1 LLC | Niland, CA | 33.1 GWh |
| #1336 | Wister Solar | Niland, CA | 33.0 GWh |
| #1337 | Woodland Solar Farm | Smithfield, VA | 32.9 GWh |
| #1338 | Pullman Solar, LLC | Lee Township, MI | 32.8 GWh |
| #1340 | Five Forks Solar | Macon, NC | 32.7 GWh |
| #1341 | Boykin PV1 | Wade, NC | 32.7 GWh |
| #1342 | Cotton Center Solar Hybrid | Gila Bend, AZ | 29.4 GWh |
| #1343 | Tropico Solar PV Plant | Delano, CA | 32.4 GWh |
| #1344 | Montpelier Solar Project | Montpelier, OH | 32.3 GWh |
| #1345 | CZ Solar Warren, LLC | Lebanon, OH | 32.2 GWh |
| #1346 | SEPV 8 | Twentynine Palms, CA | 32.2 GWh |
| #1347 | NY8 - Darby Solar | Schaghticoke, NY | 32.1 GWh |
| #1348 | Jade Meadow LLC | Midland, MD | 32.1 GWh |
| #1349 | Cottontail Solar 5 | Penn Township, PA | 32.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Adera Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2097 Helton Solar Project | Merced, CA | 1.6 GWh | 18.9 mi |
| Avenue 26 Solar | Chowchilla, CA | 13.3 GWh | 8.1 mi |
| Broadway 3 - UC Merced 1 | Merced, CA | 929.0 MWh | 17.8 mi |
| CA - Madera USD - Madera South HS | Madera, CA | 2.3 GWh | 19.2 mi |
| Chowchilla II | Chowchilla, CA | 16.5 GWh | 4.3 mi |
| City of Madera WWTP | Madera, CA | 1.7 GWh | 15.5 mi |
| Costa View Farms | Madera, CA | 5.1 GWh | 9.1 mi |
| DGS Valley State Prison | Chowchilla, CA | 3.9 GWh | 9.6 mi |
| Diamond H Dairy Power | Chowchilla, CA | 11.5 GWh | 7.7 mi |
| Dos Palos | Dos Palos, CA | 1.6 GWh | 19.1 mi |
| Dos Palos Clean Power | Dos Palos, CA | 5.7 GWh | 19.1 mi |
| East Cleveland Road Solar | El Nido, CA | 5.9 GWh | 7.3 mi |
| Henry Miller RD | Dos Palos, CA | 3.0 GWh | 17.7 mi |
| Madera 1 PV | Madera, CA | 3.2 GWh | 9.8 mi |
| Merced Solar LLC | Merced, CA | 3.9 GWh | 13.4 mi |
| Mission Solar LLC | Merced, CA | 3.6 GWh | 13.4 mi |
| Sealed Air Madera Solar Project | Madera, CA | 7.3 GWh | 19.1 mi |
| Sun Harvest Solar NDP1 | Dos Palos, CA | 2.8 GWh | 18.6 mi |
| UC Merced Solar Hybrid | Merced, CA | 8.0 GWh | 17.9 mi |
| Wonderful Firebaugh | Firebaugh, CA | 10.2 GWh | 19.7 mi |