Adera Solar

Road 12 and Avenue 25 1/2, Chowchilla, CA 94105

Plant Summary Information

Adera Solar is ranked #234 out of 763 solar farms in California in terms of total annual net electricity generation.

Adera Solar generated 7.1 GWh during the 3-month period between September 2022 to December 2022.

Plant NameAdera Solar
Utility NameAES Distributed Energy
LocationMadera County, CA
Initial Operation DateDecember 2015
Last Update Dec 2022
Annual Generation 27.5 GWh
Annual Consumption 99.7 k MMBtu
Ranked #4,579 out of 11,455 Power Plants Nationwide
Ranked #926 out of 5,173 Solar Power Plants Nationwide
Ranked #631 out of 1,543 California Power Plants
Ranked #234 out of 763 California Solar Power Plants
Fuel Types Solar
Previous Operator Sustainable Power Group, LLC (2015 to 2020)
AES Distributed Energy (2021 to 2022)

Map of Adera Solar

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Adera Solar.

Create Your Account Today

Monthly Net Generation for Adera Solar

Adera Solar Details

Summary Information
Plant NameAdera Solar (60027)
Plant AddressRoad 12 and Avenue 25 1/2 Chowchilla, CA 94105
UtilityAES Distributed Energy (61012)
Latitude, Longitude37.12059, -120.32488
Generation Dates on FileDec 2015 to Dec 2022
Initial Operation DateDecember 2015
Annual Generation 27.5 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket NumberQF.16.147.000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 115.00 kV
Energy StorageNo

Generator ADERA Details Operating December 2015

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
RTO ISO LMP Node DesignationADERAG1_7_N001
RTO ISO Location Designation For Reporting Wholesale Sales DataADERAG1_7_N001
Nameplate Capacity20 MW
Summer Capacity19 MW
Winter Capacity19 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2015
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle25
DC Net Capacity26.5 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Adera Solar Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#916Electric City SolarSturgis, MI27.8 GWh
#917Pasto SolarSpencer, NY27.8 GWh
#918Solar Star California, XLIV, LLCPearblossom, CA27.7 GWh
#919WhitakersWhitakers, NC27.7 GWh
#920Tropico Solar PV PlantDelano, CA27.6 GWh
#921San Miguel I Solar Energy CenterLas Vegas, NM27.6 GWh
#922Creswell Alligood Solar, LLCCreswell, NC27.6 GWh
#923Selmer Farm LLCSelmer, TN27.6 GWh
#924OR Solar 8, LLCDairy, OR27.6 GWh
#925Dileo SolarTX27.5 GWh
#927Facebook 1 Solar Energy CenterLos Lunas, NM27.5 GWh
#928Mulberry Farm LLCSelmer, TN27.4 GWh
#929Trask East SolarBeaufort, SC27.4 GWh
#930WildberryMoscow, TN27.4 GWh
#931Ft. Churchill PVYerington, NV27.3 GWh
#932Delta Solar Power IIGrand Ledge, MI27.2 GWh
#933Longview SolarHebron, MD27.2 GWh
#934Valencia SolarTucson, AZ27.2 GWh
#935Newman SolarEl Paso, TX27.1 GWh
#936SunE EPE1 LLCChaparral, NM26.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Adera Solar.

Plant NamePlant LocationAnnual GenerationDistance
2097 Helton Solar ProjectMerced, CA3.5 GWh18.9 mi
Ampersand Chowchilla Biomass LLCChowchilla, CA58.4 GWh4.3 mi
Broadway 3 - UC Merced 1Merced, CA1.8 GWh17.8 mi
Chowchilla IIChowchilla, CA25.9 GWh4.3 mi
City of Madera WWTPMadera, CA1.8 GWh15.5 mi
DGS Central California Womens FacilityChowchilla, CA4.2 GWh9.9 mi
DGS Valley State PrisonChowchilla, CA4.3 GWh9.6 mi
Diamond H Dairy PowerChowchilla, CA11.4 GWh7.7 mi
Dos PalosDos Palos, CA1.7 GWh19.1 mi
El Nido FacilityEl Nido, CA47.8 GWh10.2 mi
Five H Farms Solar ArrayMerced, CA1.5 GWh1.8 mi
Henry Miller RDDos Palos, CA593.0 MWh17.7 mi
Madera 1 PVMadera, CA3.3 GWh9.8 mi
Madera Community HospitalMadera, CA1.9 GWh19.7 mi
Merced Solar LLCMerced, CA4.5 GWh13.4 mi
Mission Solar LLCMerced, CA4.5 GWh13.4 mi
Sealed Air Madera Solar ProjectMadera, CA2.0 MWh19.1 mi
Sun Harvest Solar NDP1Dos Palos, CA4.0 GWh18.6 mi
UC Merced Solar HybridMerced, CA8.9 GWh17.9 mi
Wonderful FirebaughFirebaugh, CA4.8 GWh19.7 mi