SCE-Snowline-White Road (South)
8928 White Road, Unit C, Phelan, CA 92371Plant Summary Information
SCE-Snowline-White Road (South) is ranked #553 out of 885 solar farms in California in terms of total annual net electricity generation.
SCE-Snowline-White Road (South) generated 517.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | SCE-Snowline-White Road (South) |
|---|---|
| Utility Name | SunEdison LLC |
| Location | San Bernardino County, CA |
| Initial Operation Date | November 2014 |
| Last Update | Dec 2025 |
| Annual Generation | 3.5 GWh |
| Annual Consumption | 11.9 k MMBtu |
| Ranked #9,386 out of 13,081 Power Plants Nationwide | |
| Ranked #4,458 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,200 out of 1,606 California Power Plants | |
| Ranked #553 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of SCE-Snowline-White Road (South)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SCE-Snowline-White Road (South).
Monthly Net Generation for SCE-Snowline-White Road (South)
Monthly Plant Fuel Consumption for SCE-Snowline-White Road (South)
SCE-Snowline-White Road (South) Details
| Summary Information | |
|---|---|
| Plant Name | SCE-Snowline-White Road (South) (59421) |
| Plant Address | 8928 White Road, Unit C, Phelan, CA 92371 |
| Utility | SunEdison LLC (59139) |
| Latitude, Longitude | 34.41306, -117.47083 |
| Generation Dates on File | Nov 2014 to Dec 2025 |
| Initial Operation Date | November 2014 |
| Annual Generation | 3.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator 11111 Details Operating November 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2014 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 1.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
SCE-Snowline-White Road (South) Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| SunE CREST 7, LLC | 600 Clipper Drive, Belmont, CA 94002 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4448 | Oaks Landfill - ANEM | Gaithersburg, MD | 3.5 GWh |
| #4449 | Onyx - Pembroke Landfill Solar | Pembroke, MA | 3.5 GWh |
| #4450 | Dover CSG | Dover Plains, NY | 3.5 GWh |
| #4451 | Amazon MDW7 Solar Project | Monee, IL | 3.5 GWh |
| #4452 | Pivot Solar 8 LLC (CSG) | Platteville, CO | 3.5 GWh |
| #4453 | Freehold(CSG) | Freehold, NY | 3.5 GWh |
| #4454 | Crittenden Solar Facility | Dry Ridge, KY | 3.5 GWh |
| #4455 | Altamont (NY) (CSG) | Guilderland, NY | 3.5 GWh |
| #4456 | IMPA Tipton 2 Solar Park | Tipton, IN | 3.5 GWh |
| #4457 | River Terminal Development Solar | Kearny, NJ | 3.5 GWh |
| #4459 | Princeton Solar Project | Princeton, NJ | 3.5 GWh |
| #4460 | Mount Dora Solar Farm W | Mount Dora, FL | 3.5 GWh |
| #4461 | Machesney Park | Machesney Park, IL | 3.5 GWh |
| #4462 | Cranberry Highway Solar LLC | Wareham, MA | 3.4 GWh |
| #4463 | Platt Hill | Winchester, CT | 3.5 GWh |
| #4464 | Carver CSG | Carver, MA | 3.5 GWh |
| #4465 | Hampton MN GRE | Hampton Township, MN | 3.5 GWh |
| #4466 | MHG Wallingford | Wallingford, VT | 3.5 GWh |
| #4467 | Venture 3 - 1C | Aurora, CO | 3.5 GWh |
| #4468 | Innovative Solar 23 | Kings Mountain, NC | 3.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SCE-Snowline-White Road (South).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adelanto Solar II, LLC | Adelanto, CA | 18.0 GWh | 11.3 mi |
| Adelanto Solar Project | Adelanto, CA | 4.1 GWh | 9.7 mi |
| Adelanto Solar, LLC | Adelanto, CA | 59.3 GWh | 11.3 mi |
| Coronus Adelanto West 1 | Adelanto, CA | 3.4 GWh | 9.3 mi |
| Coronus Adelanto West 2 | Adelanto, CA | 3.4 GWh | 9.3 mi |
| Hesperia | Hesperia, CA | 3.0 GWh | 5.5 mi |
| Industry Solar Power Generation Station | Adelanto, CA | 4.3 GWh | 9.7 mi |
| Mojave Siphon | Hesperia, CA | 46.1 GWh | 11.1 mi |
| RE Victor Phelan Solar One LLC | Adelanto, CA | 45.1 GWh | 6.9 mi |
| SCE-Snowline-Duncan Road (North) | Phelan, CA | 3.0 GWh | 6.7 mi |
| SCE-Snowline-Duncan Road (South) | Phelan, CA | 2.5 GWh | 6.6 mi |
| SCE-Snowline-White Rd (Central) | Phelan, CA | 2.8 GWh | 0.2 mi |
| SCE-Snowline-White Road (North) | Phelan, CA | 2.7 GWh | 0.3 mi |
| Sheep Creek Community Solar Farm | El Mirage, CA | 6.3 GWh | 12.5 mi |
| Victor Dry Farm Ranch A | Victorville, CA | 9.7 GWh | 6.1 mi |
| Victor Dry Farm Ranch B | Victorville, CA | 9.9 GWh | 5.9 mi |
| Victor Mesa Linda B2 | Victorville, CA | 3.7 GWh | 8.4 mi |
| Victor Mesa Linda C2 | Victorville, CA | 3.7 GWh | 8.3 mi |
| Victor Mesa Linda D2 | Victorville, CA | 3.7 GWh | 8.2 mi |
| Victor Mesa Linda E2 | Victorville, CA | 3.7 GWh | 8.1 mi |