Grossmont College
8800 Grossmont College Drive, El Cajon, CA 92020Plant Summary Information
Grossmont College is ranked #482 out of 885 solar farms in California in terms of total annual net electricity generation.
Grossmont College generated 905.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Grossmont College |
|---|---|
| Utility Name | Forefront Power, LLC |
| Location | San Diego County, CA |
| Initial Operation Date | March 2023 |
| Last Update | Dec 2024 |
| Annual Generation | 4.4 GWh |
| Annual Consumption | 14.9 k MMBtu |
| Ranked #8,586 out of 13,081 Power Plants Nationwide | |
| Ranked #3,783 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,107 out of 1,606 California Power Plants | |
| Ranked #482 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Grossmont College
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grossmont College.
Monthly Net Generation for Grossmont College
Monthly Plant Fuel Consumption for Grossmont College
Grossmont College Details
| Summary Information | |
|---|---|
| Plant Name | Grossmont College (67509) |
| Plant Address | 8800 Grossmont College Drive, El Cajon, CA 92020 |
| Utility | Forefront Power, LLC (62856) |
| Latitude, Longitude | 32.81658, -117.0063 |
| Generation Dates on File | Jan 2024 to Dec 2024 |
| Initial Operation Date | March 2023 |
| Annual Generation | 4.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 21.00 kV |
| Energy Storage | No |
Generator 19064 Details Operating March 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2.6 MW |
| Summer Capacity | 2.6 MW |
| Winter Capacity | 2.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 270 |
| Tilt Angle | 7 |
| DC Net Capacity | 3.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 3.3 MW |
| Virtual Net Metering Agreement | No |
Grossmont College Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3773 | Franklin 1 | Wrentham, MA | 4.4 GWh |
| #3774 | CED Hilltop Solar | Rockford, IL | 4.4 GWh |
| #3775 | Mitchell Solar, LLC | Silver Lake, CA | 4.4 GWh |
| #3776 | Sharon Station | Upper Freehold Townsh, NJ | 4.4 GWh |
| #3777 | Steel Sun | Lackawanna, NY | 4.4 GWh |
| #3778 | ASA Gouverneur NY Solar II LLC | Gouverneur, NY | 4.4 GWh |
| #3779 | Minnie Solar | Graham, NC | 4.4 GWh |
| #3780 | Kimberly-Clark Solar | LaGrange, GA | 4.4 GWh |
| #3781 | IMPA Crawfordsville Solar Park | Crawfordsville, IN | 4.4 GWh |
| #3782 | Round Grove 1 | Lyndon, IL | 4.4 GWh |
| #3784 | SV CSG Baileyville 2 LLC | Baileyville, IL | 4.4 GWh |
| #3785 | Polk Cedartown | Cedartown, GA | 4.3 GWh |
| #3786 | Livermore Falls CSG | Livermore Falls, ME | 4.3 GWh |
| #3787 | Cortland | Cortland, IL | 4.3 GWh |
| #3788 | SEPV 18 | Palmdale, CA | 4.3 GWh |
| #3789 | Industry Solar Power Generation Station | Adelanto, CA | 4.3 GWh |
| #3790 | Cottonwood Solar, LLC | Garysburg, NC | 4.3 GWh |
| #3791 | Kalaeloa Renewable Energy Park | Ewa Beach, HI | 4.3 GWh |
| #3792 | Gaines Solar | Bishopville, SC | 4.3 GWh |
| #3793 | ISM Solar Cranston CSG | Cranston, RI | 4.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Grossmont College.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AT&T - San Diego Trade Street | San Diego, CA | 3.8 GWh | 10.5 mi |
| Childrens Hospital | San Diego, CA | 25.8 GWh | 8.5 mi |
| County of San Diego COC Hybrid | San Diego, CA | 3.1 GWh | 7.3 mi |
| CP Kelco San Diego Plant | San Diego, CA | 71.2 GWh | 11.6 mi |
| Cuyamaca Peak Energy Plant | El Cajon, CA | 9.7 GWh | 2.4 mi |
| El Cajon Energy Center | El Cajon, CA | 19.8 GWh | 2.4 mi |
| Grossmont Hospital | La Mesa, CA | 29.2 GWh | 2.5 mi |
| Grossmont HS Solar Project | El Cajon, CA | 1.9 GWh | 0.4 mi |
| Grossmont-Cuyamaca-Cuyamaca Col. Solar & | El Cajon, CA | 2.8 GWh | 6.2 mi |
| ISH Solar Hospital SDMC | San Diego, CA | 1.4 GWh | 5.4 mi |
| Kyocera International Inc.(San Diego) | San Diego, CA | 13.7 GWh | 7.8 mi |
| Miramar Energy Facility | San Diego, CA | 11.3 GWh | 10.2 mi |
| MM San Diego-Miramar | San Diego, CA | 39.6 GWh | 9.3 mi |
| Naval Hospital Medical Center | San Diego, CA | 17.2 GWh | 10.3 mi |
| PFMG Solar Grossmont Helix LLC | La Mesa, CA | 2.1 GWh | 4.7 mi |
| San Diego Community College | San Diego, CA | 7.0 GWh | 9.4 mi |
| San Diego State University | San Diego, CA | 56.5 GWh | 4.6 mi |
| SDCCD - Miramar | San Diego, CA | 1.3 GWh | 9.1 mi |
| Sycamore Energy LLC | Santee, CA | 23.3 GWh | 3.1 mi |
| University of San Diego | San Diego, CA | 7.7 GWh | 11.2 mi |