Medline Ind. Phase 2 Tracy
5701 Promontory Parkway, Tracy, CA 95377Plant Summary Information
Medline Ind. Phase 2 Tracy is ranked #687 out of 849 solar farms in California in terms of total annual net electricity generation.
Medline Ind. Phase 2 Tracy generated 305.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Medline Ind. Phase 2 Tracy |
|---|---|
| Utility Name | Powerflex |
| Location | San Joaquin County, CA |
| Initial Operation Date | April 2018 |
| Last Update | Dec 2024 |
| Annual Generation | 2.0 GWh |
| Annual Consumption | 7.0 k MMBtu |
| Ranked #10,521 out of 12,539 Power Plants Nationwide | |
| Ranked #5,294 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,406 out of 1,600 California Power Plants | |
| Ranked #687 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
EnterSolar (2019 to 2023) Powerflex (2024 to 2024) |
Map of Medline Ind. Phase 2 Tracy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Medline Ind. Phase 2 Tracy.
Monthly Net Generation for Medline Ind. Phase 2 Tracy
Medline Ind. Phase 2 Tracy Details
| Summary Information | |
|---|---|
| Plant Name | Medline Ind. Phase 2 Tracy (63361) |
| Plant Address | 5701 Promontory Parkway, Tracy, CA 95377 |
| Utility | Powerflex (62067) |
| Latitude, Longitude | 37.73476, -121.50895 |
| Generation Dates on File | Jan 2019 to Dec 2024 |
| Initial Operation Date | April 2018 |
| Annual Generation | 2.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | No |
Generator MIP2T Details Operating April 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 1.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.4 MW |
| Virtual Net Metering Agreement | No |
Medline Ind. Phase 2 Tracy Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Medline Industries Inc. | 3 Three Lakes Drive, Northfield, IL 60093 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5284 | Andresen Solar | Clara City, MN | 2.0 GWh |
| #5285 | Broadway 2 - Tucson Phase II | Tucson, AZ | 2.0 GWh |
| #5286 | Reed Road Solar | Lake In The Hills, IL | 2.0 GWh |
| #5287 | Homer Street East | Olean, NY | 2.0 GWh |
| #5288 | Pivot Solar 15 LLC (CSG) | Brush, CO | 2.0 GWh |
| #5289 | Gilead Foster City Solar Project | Foster City, CA | 1.9 GWh |
| #5290 | Denison Solar Array | Granville, OH | 2.0 GWh |
| #5291 | 4 Applegate Solar LLC | Robbinsville, NJ | 2.0 GWh |
| #5292 | Camden CSD Solar Array | Camden, NY | 2.0 GWh |
| #5293 | Ace Solar | Piedmont, SC | 2.0 GWh |
| #5295 | Bizer Creek | Getzville, NY | 2.0 GWh |
| #5296 | USS Wells Creek Solar LLC | Goodhue, MN | 2.0 GWh |
| #5297 | Silver City WWTP PV Project | Silver City, NM | 2.0 GWh |
| #5298 | Montgomery County Correctional Facility | Boyds, MD | 2.0 GWh |
| #5299 | USG 2 | El Centro, CA | 2.0 GWh |
| #5300 | USS KVPV Solar LLC CSG | Fulton, MN | 2.0 GWh |
| #5301 | Slayton Solar | Slayton, MN | 2.0 GWh |
| #5302 | Cenergy - Kiger | Embden, ME | 2.0 GWh |
| #5303 | Stearns Solar I | Albany, MN | 2.0 GWh |
| #5304 | California PV Energy at ISD WWTP | Oakley, CA | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Medline Ind. Phase 2 Tracy.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Altamont Gas Recovery | Livermore, CA | 38.9 GWh | 7.8 mi |
| Ameresco Vasco Road | Livermore, CA | 32.3 GWh | 12.1 mi |
| Buena Vista Energy LLC | Byron, CA | 89.6 GWh | 9.9 mi |
| Byron Highway Solar | Byron, CA | 13.5 GWh | 9.8 mi |
| CA- US Foods- Livermore | Livermore, CA | 636.0 MWh | 11 mi |
| Diablo Winds LLC | Livermore, CA | 20.5 GWh | 6.1 mi |
| Foundation ST | Tracy, CA | 2.2 GWh | 1.6 mi |
| Golden Hills North Wind Energy Center | Livermore, CA | 149.2 GWh | 7 mi |
| Golden Hills Wind | Livermore, CA | 247.4 GWh | 7.3 mi |
| IPC 25 Solar | Tracy, CA | 2.8 GWh | 1.6 mi |
| J.R. Simplot Company | Lathrop, CA | 8.9 GWh | 13.6 mi |
| Mariposa Energy Project | Byron, CA | 45.4 GWh | 6.3 mi |
| Prologis L.P | Tracy, CA | 5.8 GWh | 1.3 mi |
| Regional Wastewater Control Facility | Stockton, CA | 3.1 GWh | 17.1 mi |
| Summit Winds | Livermore, CA | 199.5 GWh | 10.1 mi |
| Teichert Materials-Teichert Vernalis | San Joaquin, CA | 1.9 GWh | 11.7 mi |
| Tracy 210 | Tracy, CA | 21.2 GWh | 1.5 mi |
| Tracy Combined Cycle Power Plant | Tracy, CA | 1.0 TWh | 1.9 mi |
| Vasco Winds | Livermore, CA | 223.0 GWh | 12.1 mi |
| Whitethorn Solar LLC | Livermore, CA | 4.2 GWh | 11.8 mi |