US GSA - Sacramento
2800 Cottage Way, Sacramento, CA 95825Plant Summary Information
US GSA - Sacramento is ranked #665 out of 816 solar farms in California in terms of total annual net electricity generation.
US GSA - Sacramento generated 314.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | US GSA - Sacramento |
---|---|
Utility Name | Tesla Inc. |
Location | Sacramento County, CA |
Initial Operation Date | March 2018 |
Last Update | Dec 2024 |
Annual Generation | 2.0 GWh |
Annual Consumption | 7.0 k MMBtu |
Ranked #10,359 out of 12,288 Power Plants Nationwide | |
Ranked #5,148 out of 6,174 Solar Power Plants Nationwide | |
Ranked #1,383 out of 1,564 California Power Plants | |
Ranked #665 out of 816 California Solar Power Plants | |
Fuel Types | Solar |
Map of US GSA - Sacramento
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for US GSA - Sacramento.
Monthly Net Generation for US GSA - Sacramento
US GSA - Sacramento Details
Summary Information | |
---|---|
Plant Name | US GSA - Sacramento (60846) |
Plant Address | 2800 Cottage Way, Sacramento, CA 95825 |
Utility | Tesla Inc. (57313) |
Latitude, Longitude | 38.60135, -121.39793 |
Generation Dates on File | Mar 2018 to Dec 2024 |
Initial Operation Date | March 2018 |
Annual Generation | 2.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Balancing Authority of Northern California (BANC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Sacramento Municipal Util Dist (16534) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator PV1 Details Operating March 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 7 |
DC Net Capacity | 1.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.6 MW |
Virtual Net Metering Agreement | No |
US GSA - Sacramento Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5138 | RC Energy AA LLC Solar Facility | Albuquerque, NM | 2.0 GWh |
#5139 | CUA West Campus - North (CSG) | Washington, DC | 2.0 GWh |
#5140 | USS Webster Solar CSG | Webster, MN | 2.0 GWh |
#5141 | USS Kost Trail Solar CSG | North Branch, MN | 2.0 GWh |
#5142 | Honeysuckle Solar, LLC | Lester Prairie, MN | 2.0 GWh |
#5143 | South Cary WRF Solar Array | Apex, NC | 2.0 GWh |
#5144 | North Juvenile Detention Center Solar | Visalia, CA | 2.0 GWh |
#5145 | East Springfield Solar PV | Springfield, MA | 2.0 GWh |
#5146 | USS Milkweed Solar LLC CSG | Paynesville, MN | 2.0 GWh |
#5147 | Flodquist Community Solar LLC CSG | Lindstrom, MN | 2.0 GWh |
#5149 | Forrest City- Eldridge Road | Forrest City, AR | 2.0 GWh |
#5150 | Rich Mountain Electric Cooperative | Mena, AR | 2.0 GWh |
#5151 | Bibb Jones | Macon, GA | 2.0 GWh |
#5152 | USS Pheasant Solar LLC CSG | Clara City, MN | 2.0 GWh |
#5153 | USS Rockpoint Solar CSG | Stacy, MN | 2.0 GWh |
#5154 | USS Reindeer Solar LLC CSG | Sauk Rapids, MN | 2.0 GWh |
#5155 | Hayfield Solar III LLC CSG | Hayfield, MN | 2.0 GWh |
#5156 | Whitfield Cooper | Cohutta, GA | 2.0 GWh |
#5157 | Northwest Ohio Wind | Haviland, OH | 280.0 GWh |
#5158 | Midwest Energy Community Solar Array | Colby, KS | 1.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding US GSA - Sacramento.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Carson Ice-Gen Project | Sacramento, CA | 116.5 GWh | 11.3 mi |
Chambers 4 - Sacramento SMF1 | Sacramento, CA | 2.3 GWh | 11 mi |
Department of Justice | Sacramento, CA | 3.9 GWh | 4.6 mi |
Depot Park Solar System | Sacramento, CA | 3.2 GWh | 6 mi |
Dept of General Services -FTB | Sacramento, CA | 5.1 GWh | 3.9 mi |
FAA NorCal TRACON | Mather AFB, CA | 1.6 GWh | 8.1 mi |
FRV SI Transport Solar LP | Sacramento, CA | 1.4 GWh | 7.9 mi |
McClellan (CA) | Sacramento, CA | 3.4 GWh | 3.6 mi |
Nimbus | Folsom, CA | 50.6 GWh | 9.9 mi |
Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.0 GWh | 6 mi |
Sacramento (SMUD) | Sacramento, CA | 2.0 GWh | 3.4 mi |
Sacramento Fairbain Water Treatment Plan | Sacramento, CA | 961.0 MWh | 3.4 mi |
Sacramento Point West Medical Offices | Sacramento, CA | 2.1 GWh | 1.7 mi |
Sacramento Regional County Sanitation PV | Elk Grove, CA | 7.3 GWh | 11.1 mi |
SCA Cogen 2 | Sacramento, CA | 613.4 GWh | 4.9 mi |
SCDA Solar 1 | Sacramento, CA | 13.4 GWh | 11.9 mi |
Solar Star California II LLC | Sacramento, CA | 3.5 GWh | 7.2 mi |
SPA Cogen 3 | Sacramento, CA | 632.7 GWh | 7.5 mi |
Strata Roof 1 | Sacramento, CA | 1.5 GWh | 6.5 mi |
Wildflower Solar 1 | Elverta, CA | 27.9 GWh | 8.3 mi |