Beacon Solar Plant Site 2
29956 Highway 14, Cantil, CA 93519Plant Summary Information
Beacon Solar Plant Site 2 is ranked #118 out of 849 solar farms in California in terms of total annual net electricity generation.
Beacon Solar Plant Site 2 generated 37.5 GWh during the 3-month period between May 2025 to August 2025.
| Plant Name | Beacon Solar Plant Site 2 |
|---|---|
| Utility Name | Arevon Asset Management |
| Location | Kern County, CA |
| Initial Operation Date | December 2017 |
| Last Update | Aug 2025 |
| Annual Generation | 115.2 GWh |
| Annual Consumption | 434.5 k MMBtu |
| Ranked #3,222 out of 12,529 Power Plants Nationwide | |
| Ranked #734 out of 6,390 Solar Power Plants Nationwide | |
| Ranked #341 out of 1,600 California Power Plants | |
| Ranked #118 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
SUNE BEACON SITE 2, LLC (2013 to 2015) CD Global Solar Holdings, LLC (2016 to 2022) Arevon Asset Management (2023 to 2024) |
Map of Beacon Solar Plant Site 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Beacon Solar Plant Site 2.
Monthly Net Generation for Beacon Solar Plant Site 2
Beacon Solar Plant Site 2 Details
| Summary Information | |
|---|---|
| Plant Name | Beacon Solar Plant Site 2 (59309) |
| Plant Address | 29956 Highway 14, Cantil, CA 93519 |
| Utility | Arevon Asset Management (64172) |
| Latitude, Longitude | 35.26583, -117.99917 |
| Generation Dates on File | Dec 2017 to Aug 2025 |
| Initial Operation Date | December 2017 |
| Annual Generation | 115.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator BEAC2 Details Operating December 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 47.3 MW |
| Summer Capacity | 47.3 MW |
| Winter Capacity | 47.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 59.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Beacon Solar Plant Site 2 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #724 | Meherrin Solar | Skippers, VA | 118.7 GWh |
| #725 | Hooper Solar | Mosca, CO | 118.3 GWh |
| #726 | Meridian III | Meridian, MS | 118.1 GWh |
| #727 | Bullfrog Creek Solar | Wimauma, FL | 118.1 GWh |
| #728 | Hecate Energy Beacon Solar 4 | Cantil, CA | 117.8 GWh |
| #729 | Aspen Road Solar | Spring Run, PA | 117.7 GWh |
| #730 | Pioneer Trail Solar Energy Center | New Smyrna Beach, FL | 117.3 GWh |
| #731 | Sandstone Solar | Florence, AZ | 117.2 GWh |
| #732 | Magnolia Springs Solar Center | Green Cove Springs, FL | 116.8 GWh |
| #733 | Twin Lakes | Interlachen, FL | 115.3 GWh |
| #735 | Kayenta Solar Project | Kayenta, AZ | 115.0 GWh |
| #736 | Iris Solar LLC | Franklinton, LA | 114.6 GWh |
| #737 | Swallowtail | Defuniak Springs, FL | 114.6 GWh |
| #738 | Silver State Solar Power North | Primm, NV | 114.6 GWh |
| #739 | Glover Creek Solar, LLC | Summer Shade, KY | 114.5 GWh |
| #740 | Maiden Creek Solar Power Plant | Maiden, NC | 114.5 GWh |
| #741 | Pavant Solar, LLC | Fillmore, UT | 114.2 GWh |
| #742 | Yuma Solar + Storage | Fortuna Foothills, AZ | 110.4 GWh |
| #743 | Redlands | TBD, FL | 114.1 GWh |
| #744 | Northern Preserve Solar | Glen St. Mary, FL | 114.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Beacon Solar Plant Site 2.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beacon Solar Plant Site 5 | Cantil, CA | 92.3 GWh | 2.3 mi |
| CalCity Solar 1 | California City, CA | 7.9 GWh | 8.8 mi |
| California City | California City, CA | 4.6 GWh | 7.6 mi |
| Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 17.8 mi |
| Edwards Sanborn S1 | Mojave, CA | 99.0 GWh | 18.1 mi |
| Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 541.3 GWh | 3.2 mi |
| Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 76.3 GWh | 3.6 mi |
| Hecate Energy Beacon Solar 1 | Cantil, CA | 131.6 GWh | 0.9 mi |
| Hecate Energy Beacon Solar 3 | Cantil, CA | 126.1 GWh | 1.2 mi |
| Hecate Energy Beacon Solar 4 | Cantil, CA | 117.8 GWh | 1.8 mi |
| North Sky River Energy LLC | Weldon, CA | 435.0 GWh | 12 mi |
| Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 11.4 mi |
| Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 10 mi |
| RE Barren Ridge 1 | Mojave, CA | 175.0 GWh | 5.8 mi |
| Rising Tree Wind Farm | Mojave, CA | 249.0 GWh | 18 mi |
| Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 16.9 mi |
| Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh | 14 mi |
| Springbok 3 Solar Farm Hybrid | Cantil, CA | 253.2 GWh | 6.5 mi |
| Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh | 2.7 mi |
| Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh | 1.7 mi |