Broadway 4 - Target Shafter
3880 Zachary Ave., Shafter, CA 93263Plant Summary Information
Broadway 4 - Target Shafter is ranked #554 out of 816 solar farms in California in terms of total annual net electricity generation.
Broadway 4 - Target Shafter generated 441.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Broadway 4 - Target Shafter |
---|---|
Utility Name | MN8 Energy LLC |
Location | Kern County, CA |
Initial Operation Date | September 2018 |
Last Update | Dec 2024 |
Annual Generation | 3.0 GWh |
Annual Consumption | 10.6 k MMBtu |
Ranked #9,373 out of 12,288 Power Plants Nationwide | |
Ranked #4,297 out of 6,174 Solar Power Plants Nationwide | |
Ranked #1,257 out of 1,564 California Power Plants | |
Ranked #554 out of 816 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2024) |
Map of Broadway 4 - Target Shafter
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Broadway 4 - Target Shafter.
Monthly Net Generation for Broadway 4 - Target Shafter
Broadway 4 - Target Shafter Details
Summary Information | |
---|---|
Plant Name | Broadway 4 - Target Shafter (65188) |
Plant Address | 3880 Zachary Ave., Shafter, CA 93263 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 35.46331, -119.18912 |
Generation Dates on File | Jan 2021 to Dec 2024 |
Initial Operation Date | September 2018 |
Annual Generation | 3.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 18-1997 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator GEN1 Details Operating September 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 10 |
DC Net Capacity | 2.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Broadway 4 - Target Shafter Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4287 | Dixie Creek Dairy Solar | Hanford, CA | 3.0 GWh |
#4288 | Temple Solar Arrays | Reading, PA | 3.0 GWh |
#4289 | USG 1 | El Centro, CA | 3.0 GWh |
#4290 | Long Henry Solar | Seven Springs, NC | 3.0 GWh |
#4291 | Lichtenthal | Batavia, NY | 3.0 GWh |
#4292 | EMWD - San Jacinto RES BCT | San Jacinto, CA | 3.0 GWh |
#4293 | Yellow Mills Rd #1 Community Solar Farm | Farmington, NY | 3.0 GWh |
#4294 | Jersey Gardens Phase 2 | Elizabeth, NJ | 3.0 GWh |
#4295 | Clarendon Solar Farm | North Clarendon, VT | 3.0 GWh |
#4296 | Camp Atterbury Microgrid Hybrid | Edinburgh, IN | 2.8 GWh |
#4298 | Hobart & William Smith College Gates Rd. | Geneva, NY | 3.0 GWh |
#4299 | APG Old Bayside | Aberdeen, MD | 3.0 GWh |
#4300 | Trimbelle (Pierce Pepin) | Hager City, WI | 3.0 GWh |
#4301 | Harris Farms Solar Facility | Coalinga, CA | 3.0 GWh |
#4302 | Lisbon Street Solar | Lewiston, ME | 3.0 GWh |
#4303 | O'Shea Solar Farm | Detroit, MI | 3.0 GWh |
#4304 | First Baptist Church of Glenarden | Upper Marlboro, MD | 3.0 GWh |
#4305 | Hadley 2 Solar, LLC CSG | Hadley, MA | 3.0 GWh |
#4306 | White CSG | Baltimore, MD | 3.0 GWh |
#4307 | Mustang One | Cambridge, MD | 3.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Broadway 4 - Target Shafter.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Badger Creek Limited | Bakersfield, CA | 13.3 GWh | 9.1 mi |
Calibrant Bakersfield LLC | Bakersfield, CA | 3.9 GWh | 5.6 mi |
Double C Generation Limited Partnership | Bakersfield, CA | 14.9 GWh | 8.5 mi |
E&B Resources | Bakersfield, CA | 2.2 GWh | 8.8 mi |
Frontier HS Solar Project | Bakersfield, CA | 2.5 GWh | 3.9 mi |
High Sierra Limited | Bakersfield, CA | 14.1 GWh | 9.5 mi |
Improvement Dst No. 4 | Bakersfield, CA | 12.0 MWh | 9.4 mi |
Kern Front Limited | Bakersfield, CA | 12.2 GWh | 9.2 mi |
Kern River Cogeneration | Bakersfield, CA | 238.4 GWh | 11.5 mi |
Laredo Detention Facility - Solar 2, 3 | Bakersfield, CA | 5.1 GWh | 5.5 mi |
Liberty HS Solar Project | Bakersfield, CA | 2.5 GWh | 7.7 mi |
Live Oak Limited | Bakersfield, CA | 11.9 GWh | 9.1 mi |
Nachtigall 1836-WD | Wasco, CA | 8.0 MWh | 12.6 mi |
North Kern 1 | Shafter, CA | 3.9 GWh | 1.2 mi |
North Kern 2 | City of Shafter, CA | 2.4 GWh | 2 mi |
North Kern 3 | Bakersfield, CA | 6.0 MWh | 8.1 mi |
Shafter Solar LLC | Bakersfield, CA | 46.3 GWh | 5.9 mi |
Sycamore Cogeneration | Bakersfield, CA | 273.4 GWh | 11.5 mi |
Terry 1818-WD | Wasco, CA | 57.0 MWh | 12.7 mi |
Western Power & Steam Inc | Bakersfield, CA | 19.9 GWh | 10 mi |