Stenner Creek Solar
Highway 1, San Luis Obispo, CA 93407Plant Summary Information
Stenner Creek Solar is ranked #323 out of 816 solar farms in California in terms of total annual net electricity generation.
Stenner Creek Solar generated 1.7 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Stenner Creek Solar |
---|---|
Utility Name | Stenner Creek Solar LLC |
Location | San Luis Obispo County, CA |
Initial Operation Date | May 2018 |
Last Update | Dec 2024 |
Annual Generation | 9.5 GWh |
Annual Consumption | 32.5 k MMBtu |
Ranked #6,180 out of 12,288 Power Plants Nationwide | |
Ranked #1,809 out of 6,174 Solar Power Plants Nationwide | |
Ranked #868 out of 1,564 California Power Plants | |
Ranked #323 out of 816 California Solar Power Plants | |
Fuel Types | Solar |
Map of Stenner Creek Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Stenner Creek Solar.
Monthly Net Generation for Stenner Creek Solar
Stenner Creek Solar Details
Summary Information | |
---|---|
Plant Name | Stenner Creek Solar (61607) |
Plant Address | Highway 1, San Luis Obispo, CA 93407 |
Utility | Stenner Creek Solar LLC (61210) |
Latitude, Longitude | 35.32, -120.691 |
Generation Dates on File | May 2018 to Dec 2024 |
Initial Operation Date | May 2018 |
Annual Generation | 9.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 18-367-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator CPOLY Details Operating May 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.5 MW |
Summer Capacity | 4.5 MW |
Winter Capacity | 4.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Cofire Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 5.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Stenner Creek Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1799 | Wakefield Solar | Nebulon, NC | 9.5 GWh |
#1800 | Spencer Farm, LLC | Salisbury, NC | 9.5 GWh |
#1801 | ESA Boston Solar, LLC | Roxboro, NC | 9.5 GWh |
#1802 | Atkinson Farm Solar | Beulaville, NC | 9.5 GWh |
#1803 | Auburn Renewables LLC | Garrett, IN | 9.5 GWh |
#1804 | Southerland Farm Solar | Henderson, NC | 9.5 GWh |
#1805 | OYA Wayside Drive | Watertown, NY | 9.5 GWh |
#1806 | BESSP1, LLC. | Shallowater, TX | 9.5 GWh |
#1807 | Crockett Farm | Kinston, NC | 9.5 GWh |
#1808 | Cortez Solar 2, LLC | Cortez, CO | 9.5 GWh |
#1810 | McIntosh Solar | Rincon, GA | 9.5 GWh |
#1811 | Avenal Park | Avenal, CA | 9.5 GWh |
#1812 | DodgeSun CSG | Kasson, MN | 9.5 GWh |
#1813 | Coats Solar Farm, LLC | Coats, NC | 9.5 GWh |
#1814 | North Nash Farm, LLC | Castalia, NC | 9.5 GWh |
#1815 | Pikeville Farm | Pikeville, NC | 9.5 GWh |
#1816 | Quarter Horse Solar | Hampstead, NC | 9.5 GWh |
#1817 | Laurinburg Farm | Laurinburg, NC | 9.5 GWh |
#1818 | Soluga Farms 1 | Newton Grove, NC | 9.5 GWh |
#1819 | Arborgate Solar | Pittsboro, NC | 9.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Stenner Creek Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aera San Ardo Cogen Facility | San Ardo, CA | 17.2 GWh | 44.8 mi |
Atascadero State Hospital | Atascadero, CA | 2.8 GWh | 10.4 mi |
CA Flats Solar 130, LLC | Shandon, CA | 233.3 GWh | 26 mi |
CA Flats Solar 150, LLC | Shandon, CA | 315.0 GWh | 26 mi |
CA-DGS-California Men's Colony | San Luis Obispo, CA | 4.6 GWh | 0.4 mi |
California Valley Solar Ranch | California Valley, CA | 597.7 GWh | 43.7 mi |
Camp San Luis Obispo | San Luis Obispo, CA | 158.0 MWh | 2.3 mi |
Cold Canyon 1 | San Luis Obispo, CA | 10.0 GWh | 10.6 mi |
Diablo Canyon | Avila Beach, CA | 18.2 TWh | 11.9 mi |
Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.3 GWh | 19.1 mi |
Lost Hills/Blackwell | Lost Hills, CA | 80.6 GWh | 51.7 mi |
Meridian Vineyards | Paso Robles, CA | 1.4 GWh | 25.2 mi |
Nacimiento Hydro Project | Bradley, CA | 18.2 GWh | 34.8 mi |
Roll Lost Hills | Lost Hills, CA | 5.5 GWh | 50.6 mi |
Salinas River Cogeneration | San Ardo, CA | 256.4 GWh | 44.7 mi |
Strauss Wind Farm | Lompoc, CA | 232.7 GWh | 51.6 mi |
Sutter Home Winery TCC | Paso Robles, CA | 1.1 GWh | 28.7 mi |
Topaz Solar Farm | Santa Margarita, CA | 1.0 TWh | 35.6 mi |
Vandenberg Solar Project | Vandenberg Airforce B, CA | 39.7 GWh | 40.7 mi |
Vintner Solar | Templeton, CA | 4.2 GWh | 16.4 mi |