Lavio Solar
4990 D Street Extension, Petaluma, CA 94954Plant Summary Information
Lavio Solar is ranked #741 out of 917 solar farms in California in terms of total annual net electricity generation.
Lavio Solar generated 319.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Lavio Solar |
|---|---|
| Utility Name | Lavio Solar, LLC |
| Location | Sonoma County, CA |
| Initial Operation Date | April 2018 |
| Last Update | Dec 2025 |
| Annual Generation | 1.9 GWh |
| Annual Consumption | 6.9 k MMBtu |
| Ranked #11,133 out of 13,301 Power Plants Nationwide | |
| Ranked #5,974 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #1,422 out of 1,641 California Power Plants | |
| Ranked #741 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Lavio Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lavio Solar.
Monthly Net Generation for Lavio Solar
Monthly Plant Fuel Consumption for Lavio Solar
Lavio Solar Details
| Summary Information | |
|---|---|
| Plant Name | Lavio Solar (61792) |
| Plant Address | 4990 D Street Extension, Petaluma, CA 94954 |
| Utility | Lavio Solar, LLC (61417) |
| Latitude, Longitude | 38.1946, -122.66339 |
| Generation Dates on File | Apr 2018 to Dec 2025 |
| Initial Operation Date | April 2018 |
| Annual Generation | 1.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator 5002 Details Operating April 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 1 MW |
| Winter Capacity | 0.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | No |
|---|---|
| Fixed Tilt | Yes |
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 1.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Lavio Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5964 | Reed Road Solar | Lake In The Hills, IL | 1.9 GWh |
| #5965 | ACCP NJ 1 | Hopatcong, NJ | 1.9 GWh |
| #5966 | USS Dot Com Solar LLC CSG | Morgan, MN | 1.9 GWh |
| #5967 | Gilead Foster City Solar Project | Foster City, CA | 1.9 GWh |
| #5968 | SR Skylark C | Windsor, CO | 1.9 GWh |
| #5969 | Kosa | Independence, NY | 1.9 GWh |
| #5970 | FastSun 10 CSG | Zumbrota, MN | 1.9 GWh |
| #5971 | Sutter Home Winery GIR | American Canyon, CA | 1.9 GWh |
| #5972 | CO- CSU- Fort Collins | Fort Collins, CO | 1.9 GWh |
| #5973 | Barone CSG | Winstead, MN | 1.9 GWh |
| #5975 | USS Kost Trail Solar CSG | North Branch, MN | 1.9 GWh |
| #5976 | Stevens Community Solar LLC | Foley, MN | 1.9 GWh |
| #5977 | AZ State University - Tempe Campus Solar | Tempe, AZ | 1.9 GWh |
| #5978 | 100 Brook Hill Drive Solar | West Nyack, NY | 1.9 GWh |
| #5979 | Camden CSD Solar Array | Camden, NY | 1.9 GWh |
| #5980 | USS JJ Solar CSG | Sauk Rapids, MN | 1.9 GWh |
| #5981 | Grossmont HS Solar Project | El Cajon, CA | 1.9 GWh |
| #5982 | USS KVPV Solar LLC CSG | Fulton, MN | 1.9 GWh |
| #5983 | California PV Energy at ISD WWTP | Oakley, CA | 1.9 GWh |
| #5984 | SR Brownsville | Brownsville, TN | 1.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lavio Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beringer | Saint Helena, CA | 1.6 GWh | 24 mi |
| Bio-Rad | Hercules, CA | 3.2 GWh | 24.3 mi |
| Bodega Avenue Solar LLC | Petaluma, CA | 3.8 GWh | 6.1 mi |
| Cottonwood Solar, LLC Cottonwood Carport | Novato, CA | 1.1 GWh | 6.8 mi |
| Ellis Creek Solar | Petaluma, CA | 1.3 GWh | 5.2 mi |
| Kaiser Napa Valley Corporate Dr Fuel Cel | Napa, CA | 39.0 GWh | 21.6 mi |
| Keysight - Santa Rosa | Santa Rosa, CA | 34.5 GWh | 20 mi |
| Laguna Water Reclamation Facility | Santa Rosa, CA | 9.4 GWh | 13.3 mi |
| Marin Clean Energy Solar One | Richmond, CA | 21.2 GWh | 23.2 mi |
| Richmond Cogen | Richmond, CA | 965.4 GWh | 22.9 mi |
| Santa Rosa Junior College Petaluma Solar | Petaluma, CA | 1.7 GWh | 19.2 mi |
| SFDK Solar | Vallejo, CA | 10.0 GWh | 23.8 mi |
| Silveira Ranch Road Solar | Novato, CA | 5.2 GWh | 6 mi |
| Sonoma Central Landfill Phase I | Petaluma, CA | 583.0 MWh | 8.7 mi |
| Sonoma Central Landfill Phase II | Petaluma, CA | 1.8 GWh | 8.7 mi |
| Soscol Ferry Solar | Napa, CA | 4.5 GWh | 21.3 mi |
| Stage Gulch Solar | Petaluma, CA | 1.5 GWh | 6.7 mi |
| Sutter Home Winery GIR | American Canyon, CA | 1.9 GWh | 21.9 mi |
| Sutter Santa Rosa Solar | Santa Rosa, CA | 2.1 GWh | 21.3 mi |
| Waste Mangement Redwood LFGTE | Novato, CA | 21.8 GWh | 5.8 mi |