Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Ellwood | Ellwood Power, LLC | Goleta, CA | California Independent System Operator (CISO) | 305.0 MWh | Jul 1974 | Dec 2025 | Natural Gas |
| Elk Hills Power LLC | Elk Hills Power LLC | Tupman, CA | California Independent System Operator (CISO) | 2.8 TWh | Jun 2003 | May 2026 | Natural Gas |
| El Dorado | El Dorado Irrigation District | Pollock Pines, CA | California Independent System Operator (CISO) | 80.5 GWh | Dec 1923 | Dec 2025 | Water |
| Haypress | EIF Haypress LLC | Sierra City, CA | California Independent System Operator (CISO) | 17.1 GWh | Nov 1988 | Jun 2025 | Water |
| E F Oxnard Energy Facility | EF Oxnard, LLC | Oxnard, CA | California Independent System Operator (CISO) | 7.8 GWh | May 1990 | May 2026 | Natural Gas |
| CA- US Foods- Livermore | EDPRNA DG CA Livermore LLC | Livermore, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2024 | Dec 2025 | Solar |
| Scarlet II Hybrid | EDPR Scarlet II LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 387.0 GWh | Nov 2024 | May 2026 | Solar |
| Sandrini Solar 200 | EDPR CA Solar Park LLC | Mettler, CA | California Independent System Operator (CISO) | 445.3 GWh | Nov 2024 | May 2026 | Solar |
| Sandrini Solar 100 | EDPR CA Solar Park II LLC | Mettler, CA | California Independent System Operator (CISO) | 254.0 GWh | Nov 2024 | May 2026 | Solar |
| Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 482.6 GWh | May 2024 | May 2026 | Solar |
| Windhub Solar A LLC | EDP Renewables North America LLC | Mojave, CA | California Independent System Operator (CISO) | 48.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Edom Hills Project 1 LLC | Edom Hills Project 1 LLC | Cathedral City, CA | California Independent System Operator (CISO) | 4.8 GWh | Aug 2008 | Jun 2025 | Wind |
| EDF Renewable Windfarm V Inc | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 22.9 GWh | Dec 1989 | Dec 2025 | Wind |
| Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 264.9 GWh | Nov 2012 | Nov 2025 | Solar |
| Shiloh Wind Project 2 LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 369.0 GWh | Dec 2008 | Dec 2025 | Wind |
| Shiloh III Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 282.0 GWh | Nov 2011 | Dec 2025 | Wind |
| Shiloh IV Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 292.8 GWh | Nov 2012 | Dec 2025 | Wind |
| Pacific Wind LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 294.7 GWh | Jul 2012 | Dec 2025 | Wind |
| Valentine Solar, LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 270.2 GWh | Oct 2019 | May 2026 | Solar |
| Munro Valley Solar | Ecos Energy LLC | Olancha, CA | California Independent System Operator (CISO) | 8.7 GWh | Sep 2016 | Dec 2025 | Solar |
| Mission Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2014 | Dec 2025 | Solar |
| Hollister Solar LLC | Ecos Energy LLC | Hollister, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Merced Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Vintner Solar | Ecos Energy LLC | Templeton, CA | California Independent System Operator (CISO) | 4.0 GWh | Mar 2014 | Dec 2025 | Solar |
| Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 2014 | Dec 2025 | Solar |
| Bear Creek Solar (Lodi) | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2014 | Nov 2025 | Solar |
| Kettleman Solar Project | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 2.5 GWh | Mar 2014 | Dec 2025 | Solar |
| Calipatria State Prison | Ecoplexus, Inc | Calipatria, CA | Imperial Irrigation District (IID) | 16.9 GWh | Nov 2019 | Dec 2025 | Solar |
| Centinela State Prison | Ecoplexus, Inc | Sacramento, CA | Imperial Irrigation District (IID) | 18.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Folsom SP and CSP Sacramento | Ecoplexus, Inc | Represa, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Apr 2019 | Dec 2025 | Solar |
| Kern Valley SP | Ecoplexus, Inc | Delano, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2023 | Dec 2025 | Solar |
| Camp San Luis Obispo | Ecoplexus, Inc | San Luis Obispo, CA | California Independent System Operator (CISO) | 2.4 GWh | Jul 2024 | Dec 2025 | Solar |
| CA Institute for Women | Ecoplexus, Inc | Chino, CA | California Independent System Operator (CISO) | 2.1 GWh | Jan 2020 | Dec 2025 | Solar |
| Department of Justice | Ecoplexus, Inc | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.5 GWh | Mar 2020 | Dec 2025 | Solar |
| Atascadero State Hospital | Ecoplexus, Inc | Atascadero, CA | California Independent System Operator (CISO) | 2.8 GWh | Jul 2020 | Dec 2025 | Solar |
| CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.7 GWh | Sep 2022 | Dec 2025 | Solar |
| Martinez Sulfuric Acid Regeneration Plt | Eco Services Corp. | Martinez, CA | California Independent System Operator (CISO) | 13.4 GWh | Dec 1977 | Dec 2025 | Waste Heat |
| Dominguez Plant | Eco Services Corp. | Long Beach, CA | California Independent System Operator (CISO) | 33.7 GWh | Jul 1976 | Dec 2025 | Waste Heat |
| Pardee | East Bay Municipal Util Dist - (CA) | Valley Springs, CA | California Independent System Operator (CISO) | 79.6 GWh | Jun 1930 | Dec 2025 | Water |
| WWTP Power Generation Station | East Bay Municipal Util Dist - (CA) | Oakland, CA | California Independent System Operator (CISO) | 31.2 GWh | Jul 1985 | May 2026 | Other Biomass Gas : 98.9% Distillate Fuel Oil : 1.1% |
| Camanche | East Bay Municipal Util Dist - (CA) | Clements & Wallace, CA | California Independent System Operator (CISO) | 17.1 GWh | Jun 1983 | Dec 2025 | Water |
| Power Generation Station (PGS) 2 | East Bay Municipal Util Dist - (CA) | Oakland, CA | California Independent System Operator (CISO) | 20.3 GWh | Nov 2011 | Dec 2025 | Other Biomass Gas |
| Terminus Hydroelectric Project | Eagle Creek Renewable Energy, LLC | Lemon Cove, CA | California Independent System Operator (CISO) | 33.1 GWh | Feb 1990 | Dec 2025 | Water |
| Agua Mansa Power Plant | E I Colton LLC | Colton, CA | California Independent System Operator (CISO) | 3.8 GWh | May 2003 | Dec 2025 | Natural Gas |
| Dynegy Oakland Power Plant | Dynegy Oakland, LLC | Oakland, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 1978 | May 2026 | Jet Fuel |
| Dynegy Moss Landing Power Plant Hybrid | Dynegy -Moss Landing LLC | Moss Landing, CA | California Independent System Operator (CISO) | 1.9 TWh | Nov 1967 | May 2026 | Natural Gas |
| Sunset Reservoir North Basin | Duke Energy Renewables Services | San Francisco, CA | California Independent System Operator (CISO) | 6.4 GWh | Aug 2010 | Dec 2025 | Solar |
| Longboat Solar, LLC | Duke Energy Renewables Services | Barstow, CA | California Independent System Operator (CISO) | 54.3 GWh | Nov 2016 | Dec 2025 | Solar |
| Seville 2 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 78.3 GWh | Nov 2015 | Dec 2025 | Solar |
| Seville 1 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 53.3 GWh | Nov 2015 | Dec 2025 | Solar |
| SEPV 8 | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 32.2 GWh | May 2013 | Dec 2025 | Solar |
| Wildwood Solar I, LLC | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 48.3 GWh | Jan 2015 | Dec 2025 | Solar |
| SEPV9 Power Plant | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 23.1 GWh | May 2013 | Dec 2025 | Solar |
| Rio Bravo Solar 1 LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 52.1 GWh | Nov 2016 | Dec 2025 | Solar |
| Wildwood Solar II | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 38.7 GWh | Dec 2016 | Dec 2025 | Solar |
| Pumpjack Solar I | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 50.6 GWh | Dec 2014 | Dec 2025 | Solar |
| Rio Bravo Solar II LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 51.7 GWh | Nov 2016 | Dec 2025 | Solar |
| Stockton Biomass | DTE Stockton LLC | Stockton, CA | California Independent System Operator (CISO) | 355.5 GWh | Nov 1987 | Dec 2025 | Wood/Wood Waste Solids : 99.6% |
| Childrens Hospital | DTE San Diego COGEN Inc. | San Diego, CA | California Independent System Operator (CISO) | 25.8 GWh | Mar 2000 | May 2026 | Natural Gas : 99.9% |
| Woodland Biomass Power Ltd | DTE Energy Services-Woodland | Woodland, CA | California Independent System Operator (CISO) | 161.9 GWh | Aug 1989 | Dec 2025 | Wood/Wood Waste Solids : 99.5% |
| Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 308.6 GWh | Oct 2022 | May 2026 | Solar |
| Dos Palos Clean Power | Dos Palos Clean Power LLC | Dos Palos, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2025 | Dec 2025 | Solar |
| Donaghy-Stockton | Donaghy Sales Inc. | Stockton, CA | California Independent System Operator (CISO) | 2.1 GWh | Sep 2021 | Dec 2025 | Solar |
| Midway Solar Farm II | Dominion Renewable Energy | Calipatria, CA | Imperial Irrigation District (IID) | 44.4 GWh | Apr 2017 | May 2026 | Solar |
| MCAGCC Cogen Plant | DOD USMC Marine Air Ground Combat | Twentynine Palms, CA | California Independent System Operator (CISO) | 69.2 GWh | Jan 2003 | Dec 2024 | Natural Gas |
| Agriculture Capital - Legacy Packing | Distributed Solar Development, LLC | Dinuba, CA | California Independent System Operator (CISO) | 4.0 GWh | Nov 2022 | Dec 2025 | Solar |
| Lost Hills Oilfield | Distributed Solar Development, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 4.3 GWh | Jun 2021 | Dec 2025 | Solar |
| Bishop Ranch - BR 1-Y | Distributed Solar Development, LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.7 GWh | Feb 2022 | Dec 2025 | Solar |
| Bishop Ranch - BR 8-P | Distributed Solar Development, LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.3 GWh | Oct 2024 | Dec 2025 | Solar |
| BBARWA | Distributed Solar Development, LLC | Big Bear, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2021 | Dec 2025 | Solar |
| Kings CSG 3 LLC Community Solar | Dimension Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 6.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Visalia CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 7.7 GWh | Feb 2024 | Dec 2025 | Solar |
| RB Inyokern Solar WDAT 1203 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 58.3 GWh | Nov 2024 | Dec 2025 | Solar |
| RB Inyokern Solar WDAT 1281 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 34.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Tulare CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 6.4 GWh | Sep 2024 | Dec 2025 | Solar |
| Mariposa Energy Project | Diamond Generating Corporation | Byron, CA | California Independent System Operator (CISO) | 24.3 GWh | Sep 2012 | May 2026 | Natural Gas |
| Indigo Energy Facility | Diamond Generating Corporation | North Palm Springs, CA | California Independent System Operator (CISO) | 6.2 GWh | Jun 2001 | Dec 2025 | Natural Gas |
| Larkspur Energy Facility | Diamond Generating Corporation | San Diego, CA | California Independent System Operator (CISO) | 23.0 GWh | Jun 2001 | Dec 2025 | Natural Gas |
| Solar Star Palo Alto I, LLC | DG 1 Acquisition Co., LLC | Palo Alto, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2019 | Dec 2025 | Solar |
| Whitewater Hydro Plant | Desert Water Agency | California, CA | California Independent System Operator (CISO) | 4.9 GWh | Mar 1986 | Dec 2025 | Water |
| Desert Quartzite | Desert Quartzite LLC | Blythe, CA | California Independent System Operator (CISO) | 855.4 GWh | Nov 2024 | May 2026 | Solar |
| Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 234.9 GWh | Nov 2020 | May 2026 | Solar |
| Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 193.6 GWh | Nov 2020 | May 2026 | Solar |
| Depot Park Solar System | Depot Park Solar Farm | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.7 GWh | Nov 2010 | Dec 2025 | Solar |
| Naval Hospital Medical Center | Department of the Navy | San Diego, CA | California Independent System Operator (CISO) | 17.2 GWh | Nov 2003 | May 2026 | Natural Gas |
| Delta Energy Center | Delta Energy Center LLC | Pittsburg, CA | California Independent System Operator (CISO) | 3.5 TWh | Apr 2002 | May 2026 | Natural Gas |
| Delta Electronics Fremont | Delta Electronics (Americas) Ltd | Fremont, CA | California Independent System Operator (CISO) | 701.0 MWh | Mar 2016 | Dec 2025 | Solar |
| Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 844.0 GWh | Jun 2023 | May 2026 | Solar |
| Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 504.1 GWh | Nov 2023 | May 2026 | Solar |
| La Paloma Generating Plant | CXA La Paloma LLC | McKittrick, CA | California Independent System Operator (CISO) | 1.2 TWh | Dec 2002 | May 2026 | Natural Gas |
| Meridian Vineyards | CVI CleanCapital Solar 1 LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 2010 | Dec 2024 | Solar |
| SEPV 2 | CVI CleanCapital Solar 1 LLC | Twentynine Palms, CA | California Independent System Operator (CISO) | 3.1 GWh | May 2012 | Dec 2025 | Solar |
| SEPV 1 | CVI CleanCapital Solar 1 LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.5 GWh | Apr 2012 | Dec 2025 | Solar |
| La Joya Del Sol | CVI CleanCapital Solar 1 LLC | Fresno, CA | California Independent System Operator (CISO) | 806.0 MWh | Nov 2012 | Dec 2025 | Solar |
| Cuyama Solar, LLC | Cuyama Solar, LLC | Cuyama, CA | California Independent System Operator (CISO) | 59.3 GWh | Oct 2017 | May 2026 | Solar |
| Tejon Castac Water District Solar | CTMW Solar, LLC | Arvin, CA | California Independent System Operator (CISO) | 2.5 GWh | Apr 2024 | Dec 2024 | Solar |
| Imperial Solar Energy Center West | CSOLAR IV West LLC | Seeley, CA | California Independent System Operator (CISO) | 357.0 GWh | Mar 2016 | Dec 2025 | Solar |
| Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 251.1 GWh | Oct 2013 | Dec 2025 | Solar |
| Paulsell | Crow Creek Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 47.5 GWh | May 2024 | May 2026 | Solar |
| Crockett Cogen Project | Crockett Cogeneration | Crockett, CA | California Independent System Operator (CISO) | 1.3 TWh | Nov 1995 | Feb 2026 | Natural Gas |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |