Seville 1
2085A W. Highway 78, Ocotillo Wells, CA 92004Plant Summary Information
Seville 1 is ranked #161 out of 885 solar farms in California in terms of total annual net electricity generation.
Seville 1 generated 10.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Seville 1 |
|---|---|
| Utility Name | Duke Energy Renewables Services |
| Location | Imperial County, CA |
| Initial Operation Date | December 2015 |
| Last Update | Dec 2025 |
| Annual Generation | 53.3 GWh |
| Annual Consumption | 191.3 k MMBtu |
| Ranked #4,125 out of 13,081 Power Plants Nationwide | |
| Ranked #1,090 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #442 out of 1,606 California Power Plants | |
| Ranked #161 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Seville Solar One LLC (2014 to 2021) Duke Energy Renewables Services (2022 to 2025) |
Map of Seville 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Seville 1.
Monthly Net Generation for Seville 1
Monthly Plant Fuel Consumption for Seville 1
Seville 1 Details
| Summary Information | |
|---|---|
| Plant Name | Seville 1 (59722) |
| Plant Address | 2085A W. Highway 78, Ocotillo Wells, CA 92004 |
| Utility | Duke Energy Renewables Services (65411) |
| Latitude, Longitude | 33.1125, -116.0139 |
| Generation Dates on File | Dec 2015 to Dec 2025 |
| Initial Operation Date | December 2015 |
| Annual Generation | 53.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Imperial Irrigation District (IID) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
| Grid Voltage | 92.00 kV |
| Energy Storage | No |
Generator SEV1 Details Operating December 2015
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | Imperial Valley 230 bus |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | Imperial Valley 230 bus |
| Nameplate Capacity | 20 MW |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 27 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Seville 1 Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Seville Solar One, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1080 | Baxley | Baxley, GA | 55.2 GWh |
| #1081 | Kingbird B Solar, LLC | Rosamond, CA | 55.2 GWh |
| #1082 | Antelope DSR 3 | Lancaster, CA | 55.1 GWh |
| #1083 | Fort Benning Solar Facility | Fort Mitchell, AL | 55.0 GWh |
| #1084 | Marine Corps Logistics Base Solar | Albany, GA | 55.0 GWh |
| #1085 | Techren Solar IV LLC | Boulder, NV | 55.0 GWh |
| #1086 | Sunray 2 | Daggett, CA | 54.6 GWh |
| #1087 | Longboat Solar, LLC | Barstow, CA | 54.3 GWh |
| #1088 | Whitney Point Solar | Five Points, CA | 54.2 GWh |
| #1089 | English Creek Solar | Plant City, FL | 53.3 GWh |
| #1091 | EE Waianae Solar Project | Waianae, HI | 53.2 GWh |
| #1092 | Axium Modesto Solar | Modesto, CA | 53.2 GWh |
| #1093 | Techren Solar III LLC | Boulder, NV | 53.2 GWh |
| #1094 | Lone Valley Solar Park II LLC | Lucerne Valley, CA | 53.1 GWh |
| #1095 | East Nash PV2 | Spring Hope, NC | 53.0 GWh |
| #1096 | Barilla Solar | Fort Stockton, TX | 52.9 GWh |
| #1097 | Innovative Solar 31 | Bladenboro, NC | 52.9 GWh |
| #1098 | Solar Oasis LLC | Palmdale, CA | 52.7 GWh |
| #1099 | Portal Ridge Solar B, LLC | Lancaster, CA | 52.7 GWh |
| #1100 | SEPV Mojave West | Mojave, CA | 52.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Seville 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Centinela State Prison | Sacramento, CA | 18.0 GWh | 23.9 mi |
| Del Ranch Company | Calipatria, CA | 297.8 GWh | 23.3 mi |
| Desert Green Solar Farm LLC | Boulevard, CA | 10.4 GWh | 22.2 mi |
| Elmore Company | Calipatria, CA | 368.1 GWh | 24.2 mi |
| Midway Solar Farm 1 | Calipatria, CA | 100.6 GWh | 25.9 mi |
| Ocotillo Express LLC | Ocotillo, CA | 372.2 GWh | 24.9 mi |
| Ocotillo Wells | Borrego Springs, CA | 105.9 GWh | 5.2 mi |
| Salton Sea Power Gen Co - Unit 1 | Calipatria, CA | 77.1 GWh | 21.4 mi |
| Salton Sea Power Gen Co - Unit 2 | Calipatria, CA | 74.8 GWh | 21.6 mi |
| Salton Sea Power Gen Co - Unit 3 | Calipatria, CA | 288.8 GWh | 21.9 mi |
| Salton Sea Power Gen Co - Unit 4 | Calipatria, CA | 321.2 GWh | 21.9 mi |
| Salton Sea Power LLC - Unit 5 | Calipatria, CA | 295.9 GWh | 21.9 mi |
| SEPV Imperial Dixieland West | Imperial, CA | 8.5 GWh | 25.9 mi |
| Seville 2 | Ocotillo Wells, CA | 78.3 GWh | 0.5 mi |
| Solar Borrego I | Borrego Springs, CA | 61.3 GWh | 23.4 mi |
| Titan Solar 1 (CA) | Borrego Springs, CA | 131.4 GWh | 6 mi |
| USG 1 | El Centro, CA | 3.0 GWh | 23.9 mi |
| USG 2 | El Centro, CA | 2.0 GWh | 23.9 mi |
| Valencia 1 Solar CA | Westmorland, CA | 6.3 GWh | 22.9 mi |
| Vulcan-BN Geothermal Power Company | Calipatria, CA | 232.2 GWh | 23.2 mi |