Seville 1
2085A W. Highway 78, Ocotillo Wells, CA 92004Plant Summary Information
Seville 1 is ranked #142 out of 816 solar farms in California in terms of total annual net electricity generation.
Seville 1 generated 10.4 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Seville 1 |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Imperial County, CA |
Initial Operation Date | December 2015 |
Last Update | Dec 2024 |
Annual Generation | 54.1 GWh |
Annual Consumption | 184.7 k MMBtu |
Ranked #3,872 out of 12,288 Power Plants Nationwide | |
Ranked #843 out of 6,174 Solar Power Plants Nationwide | |
Ranked #446 out of 1,564 California Power Plants | |
Ranked #142 out of 816 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Seville Solar One LLC (2014 to 2021) Duke Energy Renewables Services (2022 to 2024) |
Map of Seville 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Seville 1.
Monthly Net Generation for Seville 1
Seville 1 Details
Summary Information | |
---|---|
Plant Name | Seville 1 (59722) |
Plant Address | 2085A W. Highway 78, Ocotillo Wells, CA 92004 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 33.1125, -116.0139 |
Generation Dates on File | Dec 2015 to Dec 2024 |
Initial Operation Date | December 2015 |
Annual Generation | 54.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Imperial Irrigation District (IID) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
Grid Voltage | 92.00 kV |
Energy Storage | No |
Generator SEV1 Details Operating December 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
RTO ISO LMP Node Designation | Imperial Valley 230 bus |
RTO ISO Location Designation For Reporting Wholesale Sales Data | Imperial Valley 230 bus |
Nameplate Capacity | 20 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 27 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Seville 1 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Seville Solar One, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#833 | TA-High Desert LLC | Lancaster, CA | 56.8 GWh |
#834 | Peregrine Solar | Gollad, TX | 56.6 GWh |
#835 | Webberville Solar Project | Manor, TX | 56.3 GWh |
#836 | Pinal Central Energy Center Hybrid | Casa Grande, AZ | 53.4 GWh |
#837 | Kingbird B Solar, LLC | Rosamond, CA | 55.8 GWh |
#838 | Georges Lake | TBD, FL | 55.8 GWh |
#839 | Cedar Trail | Glen St Mary, FL | 55.8 GWh |
#840 | Apache Solar I | Cochise, AZ | 55.5 GWh |
#841 | Oberon IB | Odessa, TX | 55.4 GWh |
#842 | Mountain View Solar | North Las Vegas, NV | 55.2 GWh |
#844 | Antelope Big Sky Ranch | Lancaster, CA | 54.0 GWh |
#845 | Barilla Solar | Fort Stockton, TX | 53.7 GWh |
#846 | SEPV Mojave West | Mojave, CA | 53.5 GWh |
#847 | Eldorado Solar I | Eldorado, IL | 53.4 GWh |
#848 | Caden Energix Endless Caverns, LLC | New Market, VA | 53.3 GWh |
#849 | Edwards Sanborn E3 | Mojave, CA | 51.7 GWh |
#850 | Adelanto Solar, LLC | Adelanto, CA | 53.2 GWh |
#851 | Marine Corps Logistics Base Solar | Albany, GA | 53.2 GWh |
#852 | Mechanicsville Solar | Mechanicsville, VA | 52.9 GWh |
#853 | Fort Benning Solar Facility | Fort Mitchell, AL | 52.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Seville 1.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Centinela State Prison | Sacramento, CA | 16.7 GWh | 23.9 mi |
Del Ranch Company | Calipatria, CA | 326.3 GWh | 23.3 mi |
Desert Green Solar Farm LLC | Boulevard, CA | 10.4 GWh | 22.2 mi |
Elmore Company | Calipatria, CA | 104.3 GWh | 24.2 mi |
Midway Solar Farm 1 | Calipatria, CA | 111.2 GWh | 25.9 mi |
Ocotillo Express LLC | Ocotillo, CA | 523.7 GWh | 24.9 mi |
Ocotillo Wells | Borrego Springs, CA | 112.8 GWh | 5.2 mi |
Salton Sea Power Gen Co - Unit 1 | Calipatria, CA | 78.4 GWh | 21.4 mi |
Salton Sea Power Gen Co - Unit 2 | Calipatria, CA | 107.0 GWh | 21.6 mi |
Salton Sea Power Gen Co - Unit 3 | Calipatria, CA | 314.9 GWh | 21.9 mi |
Salton Sea Power Gen Co - Unit 4 | Calipatria, CA | 179.8 GWh | 21.9 mi |
Salton Sea Power LLC - Unit 5 | Calipatria, CA | 290.3 GWh | 21.9 mi |
SEPV Imperial Dixieland West | Imperial, CA | 7.8 GWh | 25.9 mi |
Seville 2 | Ocotillo Wells, CA | 77.5 GWh | 0.5 mi |
Solar Borrego I | Borrego Springs, CA | 62.2 GWh | 23.4 mi |
Titan Solar 1 (CA) | Borrego Springs, CA | 151.9 GWh | 6 mi |
USG 1 | El Centro, CA | 3.0 GWh | 23.9 mi |
USG 2 | El Centro, CA | 1.6 GWh | 23.9 mi |
Valencia 1 Solar CA | Westmorland, CA | 6.6 GWh | 22.9 mi |
Vulcan-BN Geothermal Power Company | Calipatria, CA | 227.2 GWh | 23.2 mi |