Atascadero State Hospital
10333 El Camino Real, Atascadero, CA 93422Plant Summary Information
Atascadero State Hospital is ranked #521 out of 763 solar farms in California in terms of total annual net electricity generation.
Atascadero State Hospital generated 817.9 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Atascadero State Hospital |
---|---|
Utility Name | Ecoplexus, Inc |
Location | San Luis Obispo County, CA |
Initial Operation Date | August 2020 |
Last Update | Dec 2022 |
Annual Generation | 3.1 GWh |
Annual Consumption | 11.1 k MMBtu |
Ranked #8,793 out of 11,455 Power Plants Nationwide | |
Ranked #3,620 out of 5,173 Solar Power Plants Nationwide | |
Ranked #1,228 out of 1,543 California Power Plants | |
Ranked #521 out of 763 California Solar Power Plants | |
Fuel Types | Solar |
Map of Atascadero State Hospital
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Atascadero State Hospital.
Monthly Net Generation for Atascadero State Hospital
Atascadero State Hospital Details
Summary Information | |
---|---|
Plant Name | Atascadero State Hospital (64523) |
Plant Address | 10333 El Camino Real Atascadero, CA 93422 |
Utility | Ecoplexus, Inc (58970) |
Latitude, Longitude | 35.46333, -120.63401 |
Generation Dates on File | Jan 2021 to Dec 2022 |
Initial Operation Date | August 2020 |
Annual Generation | 3.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF20-139-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator ATASC Details Operating August 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
East West Fixed Tilt | Yes |
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 1.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Atascadero State Hospital Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#3610 | Brass Mill Center | Waterbury, CT | 3.2 GWh |
#3611 | Solar Star Urbana Landfill East | Urbana, IL | 3.2 GWh |
#3612 | Cascades | Piscataway Township, NJ | 3.2 GWh |
#3613 | Manheim New Jersey | Bordentown, NJ | 3.2 GWh |
#3614 | Denver Intl Airport IV Solar | Denver, CO | 3.2 GWh |
#3615 | Faison Solar | Faison, NC | 3.1 GWh |
#3616 | Pittsgrove Solar | Elmer, NJ | 3.1 GWh |
#3617 | Camp Atterbury Microgrid Hybrid | Edinburgh, IN | 2.8 GWh |
#3618 | Warren County Solar | Belvidere, NJ | 3.1 GWh |
#3619 | Arrache 4013 | Palmdale, CA | 3.1 GWh |
#3621 | Carver MA 1 Community Solar | Carver, MA | 3.1 GWh |
#3622 | SCE-Snowline-White Road (North) | Phelan, CA | 3.1 GWh |
#3623 | Call Farms 3 | Batavia, NY | 3.1 GWh |
#3624 | Dynamic - Walpole | Walpole, MA | 3.1 GWh |
#3625 | Lockheed Martin Solar System | Oldsmar, FL | 3.1 GWh |
#3626 | Lincoln Financial Field | Philadelphia, PA | 3.1 GWh |
#3627 | Carson Solar I | Colorado Springs, CO | 3.1 GWh |
#3628 | Greenville CSG | Port Jervis, NY | 3.1 GWh |
#3629 | Musgrave West Solar Farm | Aurora, NY | 3.1 GWh |
#3630 | Truck Stop | West Stockridge, MA | 3.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Atascadero State Hospital.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aera San Ardo Cogen Facility | San Ardo, CA | 22.9 GWh | 36.1 mi |
Blackwell Solar Park | Lost Hills, CA | 47.0 GWh | 45.5 mi |
CA Flats Solar 130, LLC | Shandon, CA | 270.8 GWh | 16.7 mi |
CA Flats Solar 150, LLC | Shandon, CA | 324.5 GWh | 16.7 mi |
California Valley Solar Ranch | California Valley, CA | 504.4 GWh | 41.5 mi |
CED Avenal | Avenal, CA | 24.2 GWh | 45.7 mi |
Cold Canyon 1 | San Luis Obispo, CA | 11.7 GWh | 19.2 mi |
Coronal Lost Hills | Lost Hills, CA | 49.5 GWh | 44.8 mi |
Diablo Canyon | Avila Beach, CA | 19.4 TWh | 21.4 mi |
Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.8 GWh | 9.8 mi |
Lost Hills/Blackwell | Lost Hills, CA | 91.1 GWh | 45.4 mi |
Meridian Vineyards | Paso Robles, CA | 1.6 GWh | 14.8 mi |
Nacimiento Hydro Project | Bradley, CA | 855.1 MWh | 27.1 mi |
Roll Lost Hills | Lost Hills, CA | 6.9 GWh | 43.8 mi |
Salinas River Cogeneration | San Ardo, CA | 246.0 GWh | 36.2 mi |
Santa Maria EPG | Arroyo Grande, CA | 1.5 GWh | 29.2 mi |
Stenner Creek Solar | San Luis Obispo, CA | 11.0 GWh | 10.4 mi |
Topaz Solar Farm | Santa Margarita, CA | 1.1 TWh | 32.1 mi |
Vintner Solar | Templeton, CA | 4.6 GWh | 7.1 mi |
Wonderful Lost Hills | Lost Hills, CA | 50.4 GWh | 44.9 mi |