Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Santa Fe Springs Rooftop Solar BLDG H | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2015 | Dec 2024 | Solar |
| Building F | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2016 | Dec 2024 | Solar |
| Golden Hills Wind | Golden Hills Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 247.4 GWh | Nov 2015 | Dec 2024 | Wind |
| Golden Hills North Wind Energy Center | Golden Hills Interconnection Wind, LLC | Livermore, CA | California Independent System Operator (CISO) | 149.2 GWh | Oct 2017 | Sep 2025 | Wind |
| Rosamond South 1 | Golden Fields Solar IV, LLC | Rosamond, CA | California Independent System Operator (CISO) | 35.9 GWh | - | Aug 2025 | Solar |
| Golden Field Solar III, LLC | Golden Fields Solar III, LLC | Rosamond, CA | California Independent System Operator (CISO) | 529.7 GWh | Nov 2020 | Sep 2025 | Solar |
| Goal Line LP | Goal Line LP | Escondido, CA | California Independent System Operator (CISO) | 8.3 GWh | Jul 1994 | Sep 2025 | Natural Gas |
| Glass House Camarillo Cultivation | Glass House Camarillo Cultivation | Camarillo, CA | California Independent System Operator (CISO) | 77.9 GWh | Jul 2012 | Dec 2024 | Natural Gas |
| Wolfskill Energy Center | Gilroy Energy Center LLC | Fairfield, CA | California Independent System Operator (CISO) | 7.4 GWh | Dec 2002 | Dec 2024 | Natural Gas |
| Lambie Energy Center | Gilroy Energy Center LLC | Suisun, CA | California Independent System Operator (CISO) | 9.7 GWh | Dec 2002 | Dec 2024 | Natural Gas |
| Riverview Energy Center | Gilroy Energy Center for Riverview | Antioch, CA | California Independent System Operator (CISO) | 21.9 GWh | Apr 2003 | Dec 2024 | Natural Gas |
| Gilead Sciences La Verne Rooftop Solar | Gilead Sciences, Inc. - La Verne | La Verne, CA | California Independent System Operator (CISO) | 2.5 GWh | Jun 2021 | Dec 2024 | Solar |
| Gilead Foster City Solar Project | Gilead Sciences Inc. Foster City | Foster City, CA | California Independent System Operator (CISO) | 1.9 GWh | Mar 2021 | Dec 2024 | Solar |
| Gilead Oceanside Solar Project | Gilead Sciences Inc. | Oceanside, CA | California Independent System Operator (CISO) | 2.4 GWh | Nov 2021 | Dec 2024 | Solar |
| Giffen Solar Park | Giffen Solar Park, LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 19.3 GWh | May 2017 | Dec 2024 | Solar |
| Geysers Unit 5-20 | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 4.4 TWh | Mar 1971 | Sep 2025 | Geothermal |
| Aidlin Geothermal Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 81.3 GWh | Apr 1989 | Dec 2024 | Geothermal |
| Calistoga Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 456.5 GWh | Feb 1984 | Sep 2025 | Geothermal |
| Sonoma California Geothermal | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 447.6 GWh | Nov 1983 | Dec 2024 | Geothermal |
| Genesis Solar Energy Project | Genesis Solar LLC | Blythe, CA | California Independent System Operator (CISO) | 623.0 GWh | Oct 2013 | Sep 2025 | Solar |
| San Joaquin Solar | GASNA 6P, LLC | Helm, CA | California Independent System Operator (CISO) | 24.5 GWh | Sep 2018 | Dec 2024 | Solar |
| Garnet Solar Generation Station I LLC | Garnet Solar Generation Station I LLC | Palm Springs, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 2014 | Dec 2024 | Solar |
| G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 12.2 GWh | May 2013 | Dec 2024 | Landfill Gas |
| G2 Energy Ostrom Road LLC | G2 Energy LLC | Wheatland, CA | California Independent System Operator (CISO) | 29.0 GWh | Jan 2009 | Dec 2024 | Landfill Gas |
| FRV SI Transport Solar LP | FRV SI Transport Solar, L.P. (Sacremento) | Sacramento, CA | California Independent System Operator (CISO) | 1.4 GWh | Jul 2010 | Dec 2024 | Solar |
| Friant Hydro Facility | Friant Power Authority | Friant, CA | California Independent System Operator (CISO) | 59.8 GWh | Mar 1985 | Dec 2024 | Water |
| Fresno Community Solar | Fresno Community Solar Developers, LLC | Fresno, CA | California Independent System Operator (CISO) | 15.4 GWh | May 2024 | Dec 2024 | Solar |
| High Winds LLC | FPLE High Winds, LLC | Birds Landing, CA | California Independent System Operator (CISO) | 233.3 GWh | Jun 2003 | Dec 2024 | Wind |
| San Gorgonio Windplant WPP1993 | FPL Energy Operating Services, Inc. | North Palm Springs, CA | California Independent System Operator (CISO) | 202.0 GWh | Nov 2011 | Dec 2024 | Wind |
| FPL Energy Montezuma Winds LLC | FPL Energy Montezuma Wind | Birds Landing, CA | California Independent System Operator (CISO) | 85.4 GWh | Oct 2010 | Dec 2024 | Wind |
| Foundation ST | Foundation HA Energy Generation, LLC | Tracy, CA | California Independent System Operator (CISO) | 2.2 GWh | May 2011 | Dec 2024 | Wind |
| Teichert Materials-Teichert Vernalis | Foundation HA Energy Generation, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 1.9 GWh | Sep 2010 | Dec 2024 | Wind |
| Foundation AB | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2011 | Dec 2024 | Wind |
| Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 373.0 MWh | Nov 2011 | Dec 2024 | Wind |
| Anheuser-Busch #2 | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 4.3 GWh | Oct 2014 | Sep 2025 | Wind |
| Golden Acorn Casino | Foundation HA Energy Generation, LLC | Campo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2014 | Sep 2025 | Wind |
| City of Soledad Water Reclamation | Foundation HA Energy Generation, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.0 GWh | Oct 2014 | Dec 2024 | Wind |
| Taylor Farms | Foundation HA Energy Generation, LLC | Gonzales, CA | California Independent System Operator (CISO) | 3.9 GWh | Oct 2014 | Dec 2024 | Wind |
| Foundation Dole Fresh Vegetables | Foundation CA Fund X Manager LLC | Soledad, CA | California Independent System Operator (CISO) | 17.1 GWh | Jul 2022 | Dec 2024 | Wind |
| Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2017 | Dec 2024 | Wind |
| Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.7 GWh | Nov 2017 | Dec 2024 | Wind |
| Foundation Wal-Mart Red Bluff | Foundation CA Fund VI Manager LLC | Red Bluff, CA | California Independent System Operator (CISO) | 1.8 GWh | Aug 2012 | Sep 2025 | Wind |
| Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2012 | Sep 2025 | Wind |
| Foundation Cemex BMQ | Foundation CA Fund VI Manager LLC | Apple Valley, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation Cemex River Plant | Foundation CA Fund VI Manager LLC | Victorville, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation Cemex Madison | Foundation CA Fund V Manager, LLC | Madison, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2012 | Dec 2024 | Wind |
| Foundation RRM | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation NWNA | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 18.1 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.4 GWh | Jul 2018 | Dec 2024 | Wind |
| Foundation Mann Packing | Foundation CA Fund IX Manager, LLC | Gonzales, CA | California Independent System Operator (CISO) | 5.6 GWh | Mar 2019 | Dec 2024 | Wind |
| Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.8 GWh | Jul 2018 | Dec 2024 | Wind |
| DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2021 | Dec 2024 | Solar |
| Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Amazon - Stockton - Roof (SCK1) - (CA) | Forefront Power, LLC | Stockton, CA | California Independent System Operator (CISO) | 3.6 GWh | Feb 2023 | Dec 2024 | Solar |
| SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.8 GWh | Sep 2018 | Dec 2024 | Solar |
| SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| DGS Wasco State Prison | Forefront Power, LLC | Wasco, CA | California Independent System Operator (CISO) | 4.5 GWh | Jun 2020 | Dec 2024 | Solar |
| DGS Central California Womens Facility | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2020 | Nov 2024 | Solar |
| Fresno Bullard High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2020 | Dec 2024 | Solar |
| Fresno Hoover High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2020 | Dec 2024 | Solar |
| Fresno Sunnyside High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2020 | Dec 2024 | Solar |
| CA - Madera USD - Madera South HS | Forefront Power, LLC | Madera, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2023 | Dec 2024 | Solar |
| Grossmont College | Forefront Power, LLC | El Cajon, CA | California Independent System Operator (CISO) | 4.4 GWh | Feb 2023 | Dec 2024 | Solar |
| CA-Ventura Co CCD-Oxnard College Canopy | Forefront Power, LLC | Ventura, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2022 | Dec 2024 | Solar |
| CA - Ventura Co CCD - Moorpark College | Forefront Power, LLC | Moorpark, CA | California Independent System Operator (CISO) | 4.5 GWh | Jul 2023 | Dec 2024 | Solar |
| Cabrillo College | Forefront Power, LLC | Aptos, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2023 | Dec 2024 | Solar |
| CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2023 | Dec 2024 | Solar |
| CA-DGS- RFP-Correctional Training Fac | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 3.4 GWh | Feb 2024 | Dec 2024 | Solar |
| CA-DGS RFP-Salinas Valley State Prison | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 6.8 GWh | Oct 2023 | Dec 2024 | Solar |
| CA-DGS-California Correctional Inst | Forefront Power, LLC | Tehachapi, CA | California Independent System Operator (CISO) | 7.3 GWh | Mar 2024 | Dec 2024 | Solar |
| CA - DGS RFP - RJ Donovan State Prison | Forefront Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2023 | Dec 2024 | Solar |
| CA-DGS RFP-Pleasant Valley State Prison | Forefront Power, LLC | Coalinga, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2023 | Dec 2024 | Solar |
| CA - Fresno County - Juvenile Hall | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 552.0 MWh | Feb 2022 | Dec 2024 | Solar |
| Grossmont-Cuyamaca-Cuyamaca Col. Solar & | Forefront Power, LLC | El Cajon, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2024 | Dec 2024 | Solar |
| Crown Cooling Facility | Five Crowns Inc | Brawley, CA | Imperial Irrigation District (IID) | 982.0 MWh | Nov 2011 | Dec 2024 | Solar |
| FTF-PackingShed | Family Tree Farms | Reedley, CA | California Independent System Operator (CISO) | 581.0 MWh | May 2013 | Dec 2024 | Solar |
| FAA NorCal TRACON | Enfinity NorCal 1 FAA LLC | Mather AFB, CA | Balancing Authority of Northern California (BANC) | 1.6 GWh | Nov 2012 | Dec 2024 | Solar |
| Enerparc CA1 LLC | Enerparc CA 1, LLC | Hollister, CA | California Independent System Operator (CISO) | 2.5 GWh | May 2014 | Dec 2023 | Solar |
| Lincoln Landfill | Energy 2001 Inc | Lincoln, CA | California Independent System Operator (CISO) | 29.5 GWh | Oct 2004 | Dec 2024 | Landfill Gas |
| Encina Water Pollution Control | Encina Joint Powers Authority | Carlsbad, CA | California Independent System Operator (CISO) | 14.2 GWh | Oct 2008 | Sep 2025 | Other Biomass Gas : 94.8% Natural Gas : 5.2% |
| Ellwood | Ellwood Power, LLC | Goleta, CA | California Independent System Operator (CISO) | 2.5 GWh | Jul 1974 | Dec 2024 | Natural Gas |
| Elk Hills Power LLC | Elk Hills Power LLC | Tupman, CA | California Independent System Operator (CISO) | 3.0 TWh | Jun 2003 | Sep 2025 | Natural Gas |
| El Dorado | El Dorado Irrigation District | Pollock Pines, CA | California Independent System Operator (CISO) | 80.9 GWh | Dec 1923 | Dec 2024 | Water |
| Haypress | EIF Haypress LLC | Sierra City, CA | California Independent System Operator (CISO) | 17.6 GWh | Nov 1988 | Jun 2024 | Water |
| E F Oxnard Energy Facility | EF Oxnard, LLC | Oxnard, CA | California Independent System Operator (CISO) | 4.3 GWh | May 1990 | Sep 2025 | Natural Gas |
| CA- US Foods- Livermore | EDPRNA DG CA Livermore LLC | Livermore, CA | California Independent System Operator (CISO) | 636.0 MWh | Jul 2024 | Dec 2024 | Solar |
| Scarlet II Hybrid | EDPR Scarlet II LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 342.2 GWh | Nov 2024 | Sep 2025 | Solar |
| Sandrini Solar 200 | EDPR CA Solar Park LLC | Mettler, CA | California Independent System Operator (CISO) | 383.0 GWh | Nov 2024 | Sep 2025 | Solar |
| Sandrini Solar 100 | EDPR CA Solar Park II LLC | Mettler, CA | California Independent System Operator (CISO) | 217.7 GWh | Nov 2024 | Sep 2025 | Solar |
| Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 499.1 GWh | May 2024 | Sep 2025 | Solar |
| Windhub Solar A LLC | EDP Renewables North America LLC | Mojave, CA | California Independent System Operator (CISO) | 46.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Edom Hills Project 1 LLC | Edom Hills Project 1 LLC | Cathedral City, CA | California Independent System Operator (CISO) | 12.4 GWh | Aug 2008 | Nov 2024 | Wind |
| Shiloh III Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 265.2 GWh | Nov 2011 | Dec 2024 | Wind |
| Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 262.2 GWh | Nov 2012 | Dec 2024 | Solar |
| Shiloh IV Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 278.3 GWh | Nov 2012 | Dec 2024 | Wind |
| EDF Renewable Windfarm V Inc | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 20.2 GWh | Dec 1989 | Dec 2024 | Wind |
| Pacific Wind LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 311.2 GWh | Jul 2012 | Dec 2024 | Wind |
| Shiloh Wind Project 2 LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 393.1 GWh | Dec 2008 | Dec 2024 | Wind |
| Valentine Solar, LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 289.9 GWh | Oct 2019 | Sep 2025 | Solar |
| Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.2 GWh | Dec 2014 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Kern County, CA | # 1 | 313 | 34.9 TWh |