| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Foundation Superior Farms | Foundation CA Fund VI Manager LLC | Dixon, CA | California Independent System Operator (CISO) | 939.0 MWh | Nov 2012 | Mar 2026 | Wind |
| Foundation Wal-Mart Red Bluff | Foundation CA Fund VI Manager LLC | Red Bluff, CA | California Independent System Operator (CISO) | 1.5 GWh | Aug 2012 | Mar 2026 | Wind |
| Foundation Cemex BMQ | Foundation CA Fund VI Manager LLC | Apple Valley, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation Cemex River Plant | Foundation CA Fund VI Manager LLC | Victorville, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation RRM | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation Cemex Madison | Foundation CA Fund V Manager, LLC | Madison, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2012 | Dec 2024 | Wind |
| Foundation NWNA | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 18.1 GWh | Nov 2012 | Dec 2024 | Wind |
| Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.8 GWh | Jul 2018 | Dec 2024 | Wind |
| Foundation Mann Packing | Foundation CA Fund IX Manager, LLC | Gonzales, CA | California Independent System Operator (CISO) | 5.6 GWh | Mar 2019 | Dec 2024 | Wind |
| Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.4 GWh | Jul 2018 | Dec 2024 | Wind |
| Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Amazon - Stockton - Roof (SCK1) - (CA) | Forefront Power, LLC | Stockton, CA | California Independent System Operator (CISO) | 3.6 GWh | Feb 2023 | Dec 2024 | Solar |
| SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.8 GWh | Sep 2018 | Dec 2024 | Solar |
| Fresno Hoover High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2020 | Dec 2024 | Solar |
| SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2021 | Dec 2024 | Solar |
| DGS Wasco State Prison | Forefront Power, LLC | Wasco, CA | California Independent System Operator (CISO) | 4.5 GWh | Jun 2020 | Dec 2024 | Solar |
| DGS Central California Womens Facility | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2020 | Nov 2024 | Solar |
| Fresno Bullard High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.1 GWh | Feb 2020 | Dec 2024 | Solar |
| Fresno Sunnyside High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2020 | Dec 2024 | Solar |
| CA - DGS RFP - RJ Donovan State Prison | Forefront Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2023 | Dec 2024 | Solar |
| CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2023 | Dec 2024 | Solar |
| CA - Fresno County - Juvenile Hall | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 552.0 MWh | Feb 2022 | Dec 2024 | Solar |
| CA-DGS- RFP-Correctional Training Fac | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 3.4 GWh | Feb 2024 | Dec 2024 | Solar |
| CA-DGS RFP-Salinas Valley State Prison | Forefront Power, LLC | Soledad, CA | California Independent System Operator (CISO) | 6.8 GWh | Oct 2023 | Dec 2024 | Solar |
| CA - Madera USD - Madera South HS | Forefront Power, LLC | Madera, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2023 | Dec 2024 | Solar |
| CA-DGS RFP-Pleasant Valley State Prison | Forefront Power, LLC | Coalinga, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2023 | Dec 2024 | Solar |
| Grossmont College | Forefront Power, LLC | El Cajon, CA | California Independent System Operator (CISO) | 4.4 GWh | Feb 2023 | Dec 2024 | Solar |
| Cabrillo College | Forefront Power, LLC | Aptos, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2023 | Dec 2024 | Solar |
| CA - Ventura Co CCD - Moorpark College | Forefront Power, LLC | Moorpark, CA | California Independent System Operator (CISO) | 4.5 GWh | Jul 2023 | Dec 2024 | Solar |
| CA-Ventura Co CCD-Oxnard College Canopy | Forefront Power, LLC | Ventura, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2022 | Dec 2024 | Solar |
| CA-DGS-California Correctional Inst | Forefront Power, LLC | Tehachapi, CA | California Independent System Operator (CISO) | 7.3 GWh | Mar 2024 | Dec 2024 | Solar |
| Grossmont-Cuyamaca-Cuyamaca Col. Solar & | Forefront Power, LLC | El Cajon, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2024 | Dec 2024 | Solar |
| Crown Cooling Facility | Five Crowns Inc | Brawley, CA | Imperial Irrigation District (IID) | 982.0 MWh | Nov 2011 | Dec 2024 | Solar |
| FTF-PackingShed | Family Tree Farms | Reedley, CA | California Independent System Operator (CISO) | 581.0 MWh | May 2013 | Dec 2024 | Solar |
| FAA NorCal TRACON | Enfinity NorCal 1 FAA LLC | Mather AFB, CA | Balancing Authority of Northern California (BANC) | 1.6 GWh | Nov 2012 | Dec 2024 | Solar |
| Lincoln Landfill | Energy 2001 Inc | Lincoln, CA | California Independent System Operator (CISO) | 29.5 GWh | Oct 2004 | Dec 2024 | Landfill Gas |
| Encina Water Pollution Control | Encina Joint Powers Authority | Carlsbad, CA | California Independent System Operator (CISO) | 14.3 GWh | Oct 2008 | Mar 2026 | Other Biomass Gas : 93.9% Natural Gas : 6.1% |
| Ellwood | Ellwood Power, LLC | Goleta, CA | California Independent System Operator (CISO) | 2.5 GWh | Jul 1974 | Dec 2024 | Natural Gas |
| Elk Hills Power LLC | Elk Hills Power LLC | Tupman, CA | California Independent System Operator (CISO) | 2.9 TWh | Jun 2003 | Mar 2026 | Natural Gas |
| El Dorado | El Dorado Irrigation District | Pollock Pines, CA | California Independent System Operator (CISO) | 80.9 GWh | Dec 1923 | Dec 2024 | Water |
| E F Oxnard Energy Facility | EF Oxnard, LLC | Oxnard, CA | California Independent System Operator (CISO) | 5.3 GWh | May 1990 | Mar 2026 | Natural Gas |
| CA- US Foods- Livermore | EDPRNA DG CA Livermore LLC | Livermore, CA | California Independent System Operator (CISO) | 636.0 MWh | Jul 2024 | Dec 2024 | Solar |
| Scarlet II Hybrid | EDPR Scarlet II LLC | Cantua Creek, CA | California Independent System Operator (CISO) | 378.1 GWh | Nov 2024 | Mar 2026 | Solar |
| Sandrini Solar 200 | EDPR CA Solar Park LLC | Mettler, CA | California Independent System Operator (CISO) | 432.2 GWh | Nov 2024 | Mar 2026 | Solar |
| Sandrini Solar 100 | EDPR CA Solar Park II LLC | Mettler, CA | California Independent System Operator (CISO) | 232.4 GWh | Nov 2024 | Mar 2026 | Solar |
| Scarlet Solar (CA) | EDP Renewables North America LLC | Fresno, CA | California Independent System Operator (CISO) | 473.5 GWh | May 2024 | Mar 2026 | Solar |
| Windhub Solar A LLC | EDP Renewables North America LLC | Mojave, CA | California Independent System Operator (CISO) | 46.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Edom Hills Project 1 LLC | Edom Hills Project 1 LLC | Cathedral City, CA | California Independent System Operator (CISO) | 12.4 GWh | Aug 2008 | Nov 2024 | Wind |
| Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 262.2 GWh | Nov 2012 | Dec 2024 | Solar |
| EDF Renewable Windfarm V Inc | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 20.2 GWh | Dec 1989 | Dec 2024 | Wind |
| Shiloh III Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 265.2 GWh | Nov 2011 | Dec 2024 | Wind |
| Shiloh Wind Project 2 LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 393.1 GWh | Dec 2008 | Dec 2024 | Wind |
| Shiloh IV Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 278.3 GWh | Nov 2012 | Dec 2024 | Wind |
| Pacific Wind LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 311.2 GWh | Jul 2012 | Dec 2024 | Wind |
| Valentine Solar, LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 282.7 GWh | Oct 2019 | Mar 2026 | Solar |
| Munro Valley Solar | Ecos Energy LLC | Olancha, CA | California Independent System Operator (CISO) | 10.7 GWh | Sep 2016 | Dec 2024 | Solar |
| Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.2 GWh | Dec 2014 | Dec 2024 | Solar |
| Hollister Solar LLC | Ecos Energy LLC | Hollister, CA | California Independent System Operator (CISO) | 3.7 GWh | Nov 2014 | Dec 2024 | Solar |
| Mission Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2014 | Dec 2024 | Solar |
| Merced Solar LLC | Ecos Energy LLC | Merced, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2014 | Dec 2024 | Solar |
| Bear Creek Solar (CA) | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 4.0 GWh | Jan 2014 | Dec 2024 | Solar |
| Vintner Solar | Ecos Energy LLC | Templeton, CA | California Independent System Operator (CISO) | 4.2 GWh | Mar 2014 | Dec 2024 | Solar |
| Kettleman Solar Project | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 2.6 GWh | Mar 2014 | Dec 2024 | Solar |
| Kern Valley SP | Ecoplexus, Inc | Delano, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2023 | Dec 2024 | Solar |
| Folsom SP and CSP Sacramento | Ecoplexus, Inc | Represa, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Apr 2019 | Dec 2024 | Solar |
| Atascadero State Hospital | Ecoplexus, Inc | Atascadero, CA | California Independent System Operator (CISO) | 2.8 GWh | Jul 2020 | Dec 2024 | Solar |
| Calipatria State Prison | Ecoplexus, Inc | Calipatria, CA | Imperial Irrigation District (IID) | 16.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Centinela State Prison | Ecoplexus, Inc | Sacramento, CA | Imperial Irrigation District (IID) | 16.7 GWh | Nov 2019 | Dec 2024 | Solar |
| CA Institute for Women | Ecoplexus, Inc | Chino, CA | California Independent System Operator (CISO) | 2.2 GWh | Jan 2020 | Dec 2024 | Solar |
| Department of Justice | Ecoplexus, Inc | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.9 GWh | Mar 2020 | Dec 2024 | Solar |
| Camp San Luis Obispo | Ecoplexus, Inc | San Luis Obispo, CA | California Independent System Operator (CISO) | 158.0 MWh | Jul 2024 | Nov 2024 | Solar |
| CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Sep 2022 | Dec 2024 | Solar |
| Martinez Sulfuric Acid Regeneration Plt | Eco Services Corp. | Martinez, CA | California Independent System Operator (CISO) | 17.3 GWh | Dec 1977 | Dec 2024 | Waste Heat |
| Power Generation Station (PGS) 2 | East Bay Municipal Util Dist | Oakland, CA | California Independent System Operator (CISO) | 16.5 GWh | Nov 2011 | Dec 2024 | Other Biomass Gas |
| WWTP Power Generation Station | East Bay Municipal Util Dist | Oakland, CA | California Independent System Operator (CISO) | 29.7 GWh | Jul 1985 | Mar 2026 | Other Biomass Gas : 98.9% Distillate Fuel Oil : 1.1% |
| Camanche | East Bay Municipal Util Dist | Clements & Wallace, CA | California Independent System Operator (CISO) | 31.7 GWh | Jun 1983 | Dec 2024 | Water |
| Pardee | East Bay Municipal Util Dist | Valley Springs, CA | California Independent System Operator (CISO) | 117.8 GWh | Jun 1930 | Dec 2024 | Water |
| Agua Mansa Power Plant | E I Colton LLC | Colton, CA | California Independent System Operator (CISO) | 8.8 GWh | May 2003 | Dec 2024 | Natural Gas |
| Dynegy Oakland Power Plant | Dynegy Oakland, LLC | Oakland, CA | California Independent System Operator (CISO) | 1.5 GWh | Oct 1978 | Feb 2026 | Jet Fuel |
| Dynegy Moss Landing Power Plant Hybrid | Dynegy -Moss Landing LLC | Moss Landing, CA | California Independent System Operator (CISO) | 2.0 TWh | Nov 1967 | Mar 2026 | Natural Gas |
| Sunset Reservoir North Basin | Duke Energy Renewables Services | San Francisco, CA | California Independent System Operator (CISO) | 6.5 GWh | Aug 2010 | Dec 2024 | Solar |
| Pumpjack Solar I | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 46.2 GWh | Dec 2014 | Dec 2024 | Solar |
| SEPV 8 | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 32.7 GWh | May 2013 | Dec 2024 | Solar |
| Rio Bravo Solar 1 LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 52.3 GWh | Nov 2016 | Dec 2024 | Solar |
| Rio Bravo Solar II LLC | Duke Energy Renewables Services | McKittrick, CA | California Independent System Operator (CISO) | 50.8 GWh | Nov 2016 | Dec 2024 | Solar |
| Wildwood Solar II | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 38.5 GWh | Dec 2016 | Dec 2024 | Solar |
| SEPV9 Power Plant | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 24.3 GWh | May 2013 | Dec 2024 | Solar |
| Seville 2 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 77.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Seville 1 | Duke Energy Renewables Services | Ocotillo Wells, CA | Imperial Irrigation District (IID) | 54.1 GWh | Nov 2015 | Dec 2024 | Solar |
| Wildwood Solar I, LLC | Duke Energy Renewables Services | Wasco, CA | California Independent System Operator (CISO) | 41.9 GWh | Jan 2015 | Dec 2024 | Solar |
| Longboat Solar, LLC | Duke Energy Renewables Services | Barstow, CA | California Independent System Operator (CISO) | 42.0 GWh | Nov 2016 | Dec 2024 | Solar |
| Stockton Biomass | DTE Stockton LLC | Stockton, CA | California Independent System Operator (CISO) | 343.1 GWh | Nov 1987 | Dec 2024 | Wood/Wood Waste Solids : 99.5% |
| Childrens Hospital | DTE San Diego COGEN Inc. | San Diego, CA | California Independent System Operator (CISO) | 25.8 GWh | Mar 2000 | Mar 2026 | Natural Gas : 99.9% |
| Woodland Biomass Power Ltd | DTE Energy Services-Woodland | Woodland, CA | California Independent System Operator (CISO) | 170.9 GWh | Aug 1989 | Dec 2024 | Wood/Wood Waste Solids : 99.5% Natural Gas : 0.5% |
| Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 310.8 GWh | Oct 2022 | Mar 2026 | Solar |
| Donaghy-Stockton | Donaghy Sales Inc. | Stockton, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2021 | Dec 2024 | Solar |
| Midway Solar Farm II | Dominion Renewable Energy | Calipatria, CA | Imperial Irrigation District (IID) | 39.8 GWh | Apr 2017 | Mar 2026 | Solar |
| MCAGCC Cogen Plant | DOD USMC Marine Air Ground Combat | Twentynine Palms, CA | California Independent System Operator (CISO) | 69.2 GWh | Jan 2003 | Dec 2024 | Natural Gas |
| Lost Hills Oilfield | Distributed Solar Development, LLC | Lost Hills, CA | California Independent System Operator (CISO) | 4.5 GWh | Jun 2021 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on March 2026 generation numbers.| County | State Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Sierra County, CA | # 55 | 3 | 11.9 GWh |
| Mendocino County, CA | # 54 | 5 | 12.3 GWh |
| Glenn County, CA | # 53 | 2 | 18.7 GWh |
| Marin County, CA | # 52 | 3 | 19.0 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Tehama County, CA | # 50 | 7 | 59.3 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| San Francisco County, CA | # 48 | 10 | 82.1 GWh |
| Siskiyou County, CA | # 47 | 8 | 89.8 GWh |
| San Mateo County, CA | # 46 | 11 | 134.3 GWh |
| Yolo County, CA | # 45 | 15 | 210.6 GWh |
| Nevada County, CA | # 44 | 12 | 219.1 GWh |
| San Benito County, CA | # 43 | 6 | 271.3 GWh |
| Mariposa County, CA | # 42 | 2 | 299.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 316.4 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Humboldt County, CA | # 39 | 10 | 450.9 GWh |
| Trinity County, CA | # 38 | 5 | 514.3 GWh |
| Merced County, CA | # 37 | 31 | 549.1 GWh |
| Calaveras County, CA | # 36 | 6 | 555.5 GWh |
| Amador County, CA | # 35 | 8 | 621.1 GWh |
| Ventura County, CA | # 34 | 32 | 743.6 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Lake County, CA | # 32 | 10 | 908.4 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| Yuba County, CA | # 29 | 5 | 1.5 TWh |
| Tulare County, CA | # 28 | 69 | 1.6 TWh |
| County | State Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| San Joaquin County, CA | # 27 | 47 | 1.6 TWh |
| El Dorado County, CA | # 26 | 15 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Plumas County, CA | # 23 | 13 | 2.0 TWh |
| Colusa County, CA | # 22 | 3 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.4 TWh |
| Orange County, CA | # 20 | 59 | 2.6 TWh |
| Stanislaus County, CA | # 19 | 25 | 2.7 TWh |
| Alameda County, CA | # 18 | 47 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 3.0 TWh |
| Solano County, CA | # 16 | 40 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 75 | 3.5 TWh |
| Kings County, CA | # 13 | 57 | 4.2 TWh |
| San Diego County, CA | # 12 | 151 | 4.4 TWh |
| Sonoma County, CA | # 11 | 26 | 5.1 TWh |
| Sacramento County, CA | # 10 | 65 | 5.7 TWh |
| Shasta County, CA | # 9 | 46 | 7.3 TWh |
| Fresno County, CA | # 8 | 119 | 7.6 TWh |
| Imperial County, CA | # 7 | 84 | 9.5 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.0 TWh |
| Riverside County, CA | # 4 | 159 | 14.8 TWh |
| Los Angeles County, CA | # 3 | 308 | 17.0 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 19.7 TWh |
| Kern County, CA | # 1 | 313 | 35.2 TWh |