Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Lancaster Solar 1 | Boralex US Operations LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2014 | Dec 2025 | Solar |
| Frontier Solar LLC | Boralex US Operations LLC | Newman, CA | California Independent System Operator (CISO) | 47.9 GWh | May 2016 | Dec 2025 | Solar |
| Five Points Solar Park | Boralex US Operations LLC | Five Points, CA | California Independent System Operator (CISO) | 80.7 GWh | Aug 2016 | Dec 2025 | Solar |
| Westlands Solar PV Farm | Boralex US Operations LLC | Huron, CA | California Independent System Operator (CISO) | 39.1 GWh | Jan 2014 | Dec 2025 | Solar |
| Bishop Ranch BR 1-X | Bollinger Canyon Road BR 1-X Solar Project 2020 | San Ramon, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2022 | Dec 2024 | Solar |
| Bodega Avenue Solar LLC | Bodega Avenue Solar LLC | Petaluma, CA | California Independent System Operator (CISO) | 3.8 GWh | Dec 2020 | Dec 2025 | Solar |
| Blythe Solar IV, LLC | Blythe Solar IV, LLC | Blythe, CA | California Independent System Operator (CISO) | 343.3 GWh | Oct 2020 | May 2026 | Solar |
| Blythe Solar III, LLC Hybrid | Blythe Solar III, LLC | Blythe, CA | California Independent System Operator (CISO) | 347.5 GWh | Apr 2020 | May 2026 | Solar |
| Blythe Solar II, LLC | Blythe Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 329.1 GWh | Jun 2016 | May 2026 | Solar |
| Blythe Solar 110, LLC | Blythe Solar 110, LLC | Blythe, CA | California Independent System Operator (CISO) | 283.6 GWh | Feb 2016 | Dec 2025 | Solar |
| CSU Sacramento I | BluePath Solar Sacramento I LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.1 GWh | Jan 2023 | Dec 2024 | Solar |
| University of San Diego | Bloom Energy 2009 PPA | San Diego, CA | California Independent System Operator (CISO) | 7.7 GWh | Nov 2016 | Dec 2025 | Natural Gas |
| CalTech - Pasadena (PPA) | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 7.0 GWh | Feb 2016 | Dec 2025 | Natural Gas |
| Caltech Central | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 7.7 GWh | Oct 2010 | Dec 2025 | Natural Gas |
| Kaiser Ontario | Bloom Energy 2009 PPA | Ontario, CA | California Independent System Operator (CISO) | 7.7 GWh | Sep 2012 | Dec 2025 | Natural Gas |
| Kaiser Downey | Bloom Energy 2009 PPA | Downey, CA | California Independent System Operator (CISO) | 8.4 GWh | May 2012 | Dec 2025 | Natural Gas |
| Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 7.4 GWh | Nov 2018 | Dec 2025 | Natural Gas |
| Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 24.8 GWh | Jun 2018 | Dec 2025 | Natural Gas |
| FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 8.4 GWh | Jan 2017 | Dec 2025 | Natural Gas |
| ATT Van Nyus | Bloom Energy | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 7.5 GWh | Jun 2017 | Dec 2025 | Natural Gas |
| ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 7.7 GWh | Mar 2017 | Dec 2025 | Natural Gas |
| ATT Ventura Blvd | Bloom Energy | Sherman Oaks, CA | Los Angeles Department of Water and Power (LDWP) | 8.3 GWh | Oct 2019 | Dec 2025 | Natural Gas |
| Disney Prospect | Bloom Energy | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 8.0 GWh | Feb 2017 | Dec 2025 | Natural Gas |
| Illumina Way SD | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 27.5 GWh | Aug 2019 | Dec 2025 | Natural Gas |
| Life Technologies Carlsbad | Bloom Energy | Carlsbad, CA | California Independent System Operator (CISO) | 8.6 GWh | Jul 2012 | Dec 2025 | Natural Gas |
| Juniper Networks Sunnyvale | Bloom Energy | Sunnyvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2012 | Dec 2024 | Natural Gas |
| Xilinx San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2012 | Dec 2025 | Natural Gas |
| AT&T Anaheim | Bloom Energy | Anaheim, CA | California Independent System Operator (CISO) | 7.5 GWh | Aug 2016 | Dec 2025 | Natural Gas |
| AT&T Holger | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 1.1 GWh | May 2016 | Dec 2025 | Natural Gas |
| Life Technologies - Pleasanton | Bloom Energy | Pleasanton, CA | California Independent System Operator (CISO) | 8.3 GWh | Feb 2013 | Dec 2025 | Natural Gas |
| ATT North Watney | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 8.4 GWh | Nov 2019 | Dec 2025 | Natural Gas |
| Intel Santa Clara | Bloom Energy | Santa Clara, CA | California Independent System Operator (CISO) | 6.9 GWh | Dec 2014 | Dec 2025 | Natural Gas |
| Equinix San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.0 GWh | Oct 2015 | Dec 2025 | Natural Gas |
| Pixar - Emeryville | Bloom Energy | Emeryville, CA | California Independent System Operator (CISO) | 7.0 GWh | Dec 2013 | Dec 2025 | Natural Gas |
| Maxim | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.9 GWh | Jul 2014 | Dec 2025 | Natural Gas |
| Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.5 GWh | Aug 2013 | Dec 2025 | Natural Gas |
| AT&T - Redwood City | Bloom Energy | Redwood City, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2013 | Dec 2025 | Natural Gas |
| AT&T - Hawthorne | Bloom Energy | Hawthorne, CA | California Independent System Operator (CISO) | 8.5 GWh | Sep 2016 | Dec 2025 | Natural Gas |
| Kaiser - Harbor City | Bloom Energy | Harbor City, CA | California Independent System Operator (CISO) | 16.6 GWh | Nov 2019 | Dec 2025 | Natural Gas |
| SCC - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.5 GWh | Feb 2014 | Dec 2025 | Natural Gas |
| Keysight - Santa Rosa | Bloom Energy | Santa Rosa, CA | California Independent System Operator (CISO) | 34.5 GWh | Aug 2018 | Dec 2025 | Natural Gas |
| CalTech - Pasadena Wilson Ave | Bloom Energy | Pasadena, CA | California Independent System Operator (CISO) | 18.7 GWh | Nov 2019 | Dec 2025 | Natural Gas |
| AT&T - San Diego Trade Street | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 3.8 GWh | Feb 2016 | Dec 2025 | Natural Gas |
| DirecTV - Los Angeles | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 7.9 GWh | Sep 2016 | Dec 2025 | Natural Gas |
| Comcast - Universal City | Bloom Energy | Universal City, CA | California Independent System Operator (CISO) | 6.9 GWh | Aug 2021 | Dec 2025 | Natural Gas |
| Enloe Medical - Chico | Bloom Energy | Chico, CA | California Independent System Operator (CISO) | 14.5 GWh | May 2021 | Dec 2025 | Natural Gas |
| AT&T - Hayward | Bloom Energy | Hayward, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2016 | Dec 2025 | Natural Gas |
| AT&T - Gardena | Bloom Energy | Gardena, CA | California Independent System Operator (CISO) | 7.8 GWh | May 2013 | Dec 2025 | Natural Gas |
| Life Technologies - Fremont | Bloom Energy | Fremont, CA | California Independent System Operator (CISO) | 10.4 GWh | Nov 2020 | Dec 2025 | Natural Gas |
| San Diego Community College | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 7.0 GWh | Feb 2020 | Dec 2025 | Natural Gas |
| Taylor Farms - Schilling Place | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 8.1 GWh | Jun 2019 | Dec 2025 | Natural Gas |
| Redlands Community Hospital | Bloom Energy | Redlands, CA | California Independent System Operator (CISO) | 8.6 GWh | May 2021 | Dec 2025 | Natural Gas |
| Anheuser Busch - Fairfield | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 20.9 GWh | Nov 2022 | Dec 2025 | Natural Gas |
| Kaiser - Woodland Hills | Bloom Energy | Woodland Hills, CA | California Independent System Operator (CISO) | 21.2 GWh | Aug 2019 | Dec 2025 | Natural Gas |
| Kaiser - LA | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 36.9 GWh | May 2020 | Dec 2025 | Natural Gas |
| Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 8.9 GWh | Oct 2011 | Dec 2025 | Natural Gas |
| Biola University Hybrid | Biola University | La Mirada, CA | California Independent System Operator (CISO) | 13.5 GWh | Mar 1990 | May 2026 | Natural Gas |
| Big Creek Water Works | Big Creek Water Works Ltd | Hyampom, CA | California Independent System Operator (CISO) | 5.5 GWh | Dec 1986 | May 2026 | Water |
| BigBeau Solar, LLC | Big Beau Solar, LLC | Rosamond, CA | California Independent System Operator (CISO) | 329.6 GWh | Jan 2022 | May 2026 | Solar |
| Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 75.7 GWh | Oct 2017 | Dec 2025 | Natural Gas |
| Berry Cogen | Berry Petroleum Co | Taft, CA | California Independent System Operator (CISO) | 9.5 GWh | Nov 1986 | May 2026 | Natural Gas |
| Berry Cogen Tanne Hills 18 | Berry Petroleum Co | Maricopa, CA | California Independent System Operator (CISO) | 138.7 GWh | Nov 1986 | May 2026 | Natural Gas |
| PE Berkeley | Berkeley Cogeneration Facility | Berkeley, CA | California Independent System Operator (CISO) | 147.4 GWh | May 1987 | May 2026 | Natural Gas |
| Bear Valley Power Plant | Bear Valley Electric Service | Big Bear Lake, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 2004 | Dec 2025 | Natural Gas |
| BCE Seal Beach | BCE Seal Beach | Seal Beach, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2025 | Apr 2026 | Solar |
| Calibrant Bakersfield LLC | Bay4 Energy Services, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2022 | Dec 2024 | Solar |
| JD Foods - JD Foods | Barrier Solar Inc | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2020 | Dec 2025 | Solar |
| Bakersfield 111 | Bakersfield 111 LLC | Bakersfield, CA | PacifiCorp West (PACW) | 1.9 GWh | Jun 2015 | Dec 2024 | Solar |
| Baker Creek Hydroelectric | Baker Station Associates, LP | Bridgeville, CA | California Independent System Operator (CISO) | 2.6 GWh | Oct 2014 | Dec 2025 | Water |
| B Braun Medical | B Braun Medical Inc | Irvine, CA | California Independent System Operator (CISO) | 28.8 GWh | Oct 1982 | Mar 2025 | Natural Gas |
| Axium Modesto Solar | Axium US Solar Holdings LLC | Modesto, CA | California Independent System Operator (CISO) | 53.2 GWh | Nov 2012 | Dec 2025 | Solar |
| Heber Solar | Axium US Solar Holdings LLC | Heber, CA | Imperial Irrigation District (IID) | 24.1 GWh | Apr 2014 | Dec 2025 | Solar |
| Avenal Park | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 10.0 GWh | Jul 2011 | Dec 2025 | Solar |
| Sun City Project LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 33.4 GWh | Jul 2011 | Dec 2025 | Solar |
| Sand Drag LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 31.9 GWh | Jul 2011 | Dec 2025 | Solar |
| Phoenix Wind Power LLC | Avangrid Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 4.7 GWh | May 1999 | Dec 2025 | Wind |
| Dillon Wind LLC | Avangrid Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 138.3 GWh | Mar 2008 | Dec 2025 | Wind |
| Manzana Wind LLC | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 519.3 GWh | Nov 2012 | Dec 2025 | Wind |
| Mountain View III | Avangrid Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 80.7 GWh | Nov 2003 | Dec 2025 | Wind |
| Tule Wind LLC | Avangrid Power LLC | Boulevard, CA | California Independent System Operator (CISO) | 338.8 GWh | Nov 2017 | May 2026 | Wind |
| Shiloh I Wind Project | Avangrid Power LLC | Rio Vista, CA | California Independent System Operator (CISO) | 400.0 GWh | Apr 2006 | Dec 2025 | Wind |
| Camino Solar Hybrid | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 133.1 GWh | Mar 2025 | May 2026 | Solar |
| AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 560.0 GWh | Jul 2014 | May 2026 | Solar |
| Arlington Energy Center III | Arlington Energy Center III | Blythe, CA | California Independent System Operator (CISO) | 334.1 GWh | Jul 2022 | May 2026 | Solar |
| Arlington Energy Center II | Arlington Energy Center II | Blythe, CA | California Independent System Operator (CISO) | 640.9 GWh | Feb 2022 | May 2026 | Solar |
| SunAnza | Arizona Electric Pwr Coop Inc | Anza, CA | California Independent System Operator (CISO) | 7.7 GWh | Aug 2017 | Dec 2025 | Solar |
| Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 740.4 GWh | Feb 2024 | May 2026 | Solar |
| Porterville 6 and 7 | Arevon Energy, Inc. | Porterville, CA | California Independent System Operator (CISO) | 4.2 GWh | Jun 2014 | Dec 2025 | Solar |
| CA Flats Solar 150, LLC | Arevon Energy, Inc. | Shandon, CA | California Independent System Operator (CISO) | 288.3 GWh | Jan 2019 | May 2026 | Solar |
| Kingbird A Solar LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 38.2 GWh | Mar 2016 | Dec 2025 | Solar |
| Kingbird B Solar, LLC | Arevon Energy, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 55.2 GWh | Mar 2016 | Dec 2025 | Solar |
| Quinto Solar PV Project | Arevon Energy, Inc. | Gustine, CA | California Independent System Operator (CISO) | 242.5 GWh | Oct 2015 | Dec 2025 | Solar |
| Tulare 1 and 2 | Arevon Energy, Inc. | Tulare, CA | California Independent System Operator (CISO) | 5.4 GWh | Dec 2013 | Dec 2025 | Solar |
| Farmersville | Arevon Energy, Inc. | Farmersville, CA | California Independent System Operator (CISO) | 5.6 GWh | Jun 2014 | Dec 2025 | Solar |
| Hanford 1 and 2 | Arevon Energy, Inc. | Hanford, CA | California Independent System Operator (CISO) | 5.2 GWh | Jul 2014 | Dec 2025 | Solar |
| Coronal Lost Hills | Arevon Energy, Inc. | Lost Hills, CA | California Independent System Operator (CISO) | 35.4 GWh | Apr 2015 | Dec 2025 | Solar |
| Nicolis Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 46.3 GWh | Aug 2016 | Dec 2025 | Solar |
| Tropico Solar PV Plant | Arevon Energy, Inc. | Delano, CA | California Independent System Operator (CISO) | 32.4 GWh | Aug 2016 | Dec 2025 | Solar |
| Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 448.6 GWh | Jun 2013 | Dec 2025 | Solar |
| Watson Cogeneration | ARCO Products Co-Watson | Carson, CA | California Independent System Operator (CISO) | 2.4 TWh | Nov 1987 | May 2026 | Natural Gas : 76.2% Other Gas : 23.1% Waste/Other Oil : 0.7% |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |