Amazon - Stockton - Roof (SCK1) - (CA)
4532 Newcastle Road, Stockton, CA 95215Plant Summary Information
Amazon - Stockton - Roof (SCK1) - (CA) is ranked #541 out of 885 solar farms in California in terms of total annual net electricity generation.
Amazon - Stockton - Roof (SCK1) - (CA) generated 555.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Amazon - Stockton - Roof (SCK1) - (CA) |
|---|---|
| Utility Name | Forefront Power, LLC |
| Location | San Joaquin County, CA |
| Initial Operation Date | March 2023 |
| Last Update | Dec 2024 |
| Annual Generation | 3.6 GWh |
| Annual Consumption | 13.0 k MMBtu |
| Ranked #9,223 out of 13,081 Power Plants Nationwide | |
| Ranked #4,315 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,183 out of 1,606 California Power Plants | |
| Ranked #541 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Amazon - Stockton - Roof (SCK1) - (CA)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Amazon - Stockton - Roof (SCK1) - (CA).
Monthly Net Generation for Amazon - Stockton - Roof (SCK1) - (CA)
Monthly Plant Fuel Consumption for Amazon - Stockton - Roof (SCK1) - (CA)
Amazon - Stockton - Roof (SCK1) - (CA) Details
| Summary Information | |
|---|---|
| Plant Name | Amazon - Stockton - Roof (SCK1) - (CA) (64429) |
| Plant Address | 4532 Newcastle Road, Stockton, CA 95215 |
| Utility | Forefront Power, LLC (62856) |
| Latitude, Longitude | 37.91172, -121.19865 |
| Generation Dates on File | Jan 2023 to Dec 2024 |
| Initial Operation Date | March 2023 |
| Annual Generation | 3.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 22-658-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 21.00 kV |
| Energy Storage | No |
Generator 19001 Details Operating March 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2.6 MW |
| Summer Capacity | 2.6 MW |
| Winter Capacity | 2.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 12 |
| DC Net Capacity | 3.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 3.4 MW |
| Virtual Net Metering Agreement | No |
Amazon - Stockton - Roof (SCK1) - (CA) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4305 | Venture 1 - 1A CSG | Aurora, CO | 3.6 GWh |
| #4306 | Norman Solar | Norman, OK | 3.6 GWh |
| #4307 | Pivot Solar 4 LLC (CSG) | Platteville, CO | 3.6 GWh |
| #4308 | Ramp Solar, LLC | Goldsboro, NC | 3.6 GWh |
| #4309 | Keeversville Solar CSG | Braidwood, IL | 3.6 GWh |
| #4310 | Ameresco Danville Solar, LLC | Tilton, IL | 3.6 GWh |
| #4311 | Genentech-Oceanside Hybrid | Oceanside, CA | 3.6 GWh |
| #4312 | Venture 4 - 1D | Aurora, CO | 3.6 GWh |
| #4313 | Soboba Community Solar Project | San Jacinto, CA | 3.6 GWh |
| #4314 | Mooseheart School Solar | Mooseheart, IL | 3.6 GWh |
| #4316 | CMEEC - Norwich Stott St Solar Hybrid | Norwich, CT | 3.6 GWh |
| #4317 | Matrix Stults Road Solar Facility | South Brunswick, NJ | 3.6 GWh |
| #4318 | NSE Camber Solar PS5 LLC (CSG) | Platteville, CO | 3.6 GWh |
| #4319 | Old Bridge Global Landfill CSG | Old Bridge, NJ | 3.6 GWh |
| #4320 | NSE Camber Solar PS13 LLC (CSG) | Sterling, CO | 3.6 GWh |
| #4321 | 231 Dixon 74 Solar I, LLC | Kings Mountain, NC | 3.6 GWh |
| #4322 | Natick Mall | Natick, MA | 3.6 GWh |
| #4323 | Tissington Solar | Vernon Township, NJ | 3.6 GWh |
| #4324 | Blacktip Solar | Scranton, SC | 3.6 GWh |
| #4325 | Cambridge Solar | Cambridge, NY | 3.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Amazon - Stockton - Roof (SCK1) - (CA).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AltaGas Ripon Energy Inc. | Ripon, CA | 1.1 GWh | 13.2 mi |
| Ameresco Forward | Manteca, CA | 31.6 GWh | 2.1 mi |
| Ameresco San Joaquin | Linden, CA | 24.8 GWh | 16.8 mi |
| Axium Modesto Solar | Modesto, CA | 53.2 GWh | 16.5 mi |
| Bear Creek Solar (Lodi) | Lodi, CA | 3.9 GWh | 15.8 mi |
| CA Manteca 730 Spreckels Ave | Manteca, CA | 100.0 MWh | 8.5 mi |
| Donaghy-Stockton | Stockton, CA | 2.1 GWh | 0.3 mi |
| Enchanted Rock Lodi | Lodi, CA | 5.1 GWh | 17.2 mi |
| ERock MID Claribel Generation Station | Modesto, CA | 3.4 GWh | 18.7 mi |
| Kettleman Solar Project | Lodi, CA | 2.5 GWh | 14.8 mi |
| Lodi | Lodi, CA | 1.9 GWh | 17.1 mi |
| Lodi Energy Center | Lodi, CA | 403.0 GWh | 15.9 mi |
| Manteca Land PV | Manteca, CA | 1.5 GWh | 5 mi |
| Niagara Bottling Stockton | Stockton, CA | 1.7 GWh | 3 mi |
| Regional Wastewater Control Facility | Stockton, CA | 4.0 GWh | 7.3 mi |
| Ripon Generation Station | Ripon, CA | 2.8 GWh | 13.2 mi |
| Robert O Schulz Solar Farm | Oakdale, CA | 3.9 GWh | 17.1 mi |
| Stockton Biomass | Stockton, CA | 355.5 GWh | 7.5 mi |
| Tracy 18 - SLCVA418 | Tracy, CA | 182.0 MWh | 15.1 mi |
| University of the Pacific | Stockton, CA | 6.5 GWh | 7.8 mi |