Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Eagle Creek | ZGlobal Inc | Taft, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Merced 1 PV | ZGlobal Inc | Los Banos, CA | California Independent System Operator (CISO) | 6.5 GWh | Mar 2018 | Dec 2024 | Solar |
| Madera 1 PV | ZGlobal Inc | Madera, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2017 | Dec 2024 | Solar |
| USG 1 | ZGlobal Inc | El Centro, CA | Imperial Irrigation District (IID) | 3.0 GWh | Mar 2014 | Dec 2024 | Solar |
| USG 2 | ZGlobal Inc | El Centro, CA | Imperial Irrigation District (IID) | 2.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Castor Solar | ZGlobal Inc | Dustin Acres, CA | California Independent System Operator (CISO) | 917.0 MWh | Mar 2016 | Dec 2023 | Solar |
| Zero Waste Energy Development Co LLC | Zero Waste Energy Development Company LLC | San Jose, CA | California Independent System Operator (CISO) | 1.8 GWh | Jan 2015 | Dec 2024 | Other Biomass Gas |
| Siphon Drop Power Plant | Yuma County Water User's Association | Winterhaven, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 11.6 GWh | Aug 1987 | Dec 2024 | Water |
| San Manuel Central Plant Cogens | Yuhaaviatam of San Manuel Nation | Highland, CA | California Independent System Operator (CISO) | 27.2 GWh | May 2021 | Dec 2024 | Natural Gas |
| Narrows 2 | Yuba County Water Agency | Browns Valley, CA | California Independent System Operator (CISO) | 156.8 GWh | Nov 1969 | Dec 2024 | Water |
| Colgate | Yuba County Water Agency | Dobbins, CA | California Independent System Operator (CISO) | 1.4 TWh | Sep 1969 | Sep 2025 | Water |
| Narrows PH | Yuba County Water Agency | Grass Valley, CA | California Independent System Operator (CISO) | 80.8 GWh | Nov 1942 | Dec 2024 | Water |
| Yolo County Solar Project | Yolo County of | Woodland, CA | California Independent System Operator (CISO) | 534.0 MWh | Nov 2010 | Dec 2023 | Solar |
| Grassland 1&2 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2013 | Jun 2024 | Solar |
| Indian Valley Dam Hydro Project | Yolo County Flood Control WCD | Clearlake Oaks, CA | California Independent System Operator (CISO) | 6.0 GWh | Sep 1983 | Aug 2024 | Water |
| MM Yolo Power | Yolo County Community Services Department | Woodland, CA | California Independent System Operator (CISO) | 16.9 GWh | Sep 1990 | Dec 2024 | Landfill Gas |
| SC 1 Data Center, Phase 2 | Xeres Ventures LLC | Santa Clara, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2011 | Sep 2025 | Distillate Fuel Oil |
| Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 411.4 GWh | Nov 2019 | Sep 2025 | Solar |
| Wonderful Orchards - Belridge | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 2020 | Dec 2024 | Solar |
| Wonderful Orchards - Westside | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 12.7 GWh | Jul 2021 | Dec 2024 | Solar |
| Wonderful Orchards - New Columbia | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 9.7 GWh | Aug 2020 | Dec 2024 | Solar |
| Wonderful Nursery | Wonderful Renewable Energy, LLC. | Wasco, CA | California Independent System Operator (CISO) | 4.6 GWh | Jun 2021 | Dec 2024 | Solar |
| POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 3.5 GWh | Nov 2021 | Dec 2024 | Solar |
| Wonderful Firebaugh | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 10.0 GWh | Jul 2022 | Dec 2024 | Solar |
| Wonderful Kings | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 7.7 GWh | Jul 2022 | Dec 2024 | Solar |
| Wonderful Orchards - West Valley | Wonderful Renewable Energy, LLC. | Blackwells Corner, CA | California Independent System Operator (CISO) | 1.4 GWh | Sep 2020 | Dec 2024 | Solar |
| POM Plant 1 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 5.2 GWh | Nov 2021 | Dec 2024 | Solar |
| POM Juice Solar | Wonderful Renewable Energy, LLC. | Fresno, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2021 | Dec 2024 | Solar |
| POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.5 GWh | Jun 2021 | Dec 2024 | Solar |
| Wonderful Lost Hills | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 48.2 GWh | Aug 2021 | Dec 2024 | Solar |
| Wonderful Huller & Shelling | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 3.5 GWh | Jul 2021 | Dec 2024 | Solar |
| Altamont Gas Recovery | WM Renewable Energy LLC | Livermore, CA | California Independent System Operator (CISO) | 38.9 GWh | Feb 1969 | Dec 2024 | Landfill Gas |
| Waste Mangement Redwood LFGTE | WM Renewable Energy LLC | Novato, CA | California Independent System Operator (CISO) | 13.1 GWh | Apr 2017 | Dec 2024 | Landfill Gas |
| Wister Solar | Wister Solar | Niland, CA | Imperial Irrigation District (IID) | 28.2 GWh | Jun 2022 | Dec 2024 | Solar |
| 85 B | Wind Wall 1 LLC | Tehachapi, CA | California Independent System Operator (CISO) | 97.6 GWh | Dec 1984 | Dec 2024 | Wind |
| 85 A | Wind Wall 1 LLC | Tehachapi, CA | California Independent System Operator (CISO) | 71.2 GWh | Dec 1984 | Dec 2024 | Wind |
| Victory Garden (Tehachapi) | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 33.0 GWh | Nov 1981 | Dec 2024 | Wind |
| Helzel & Schwarzhoff 86 | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 1986 | Dec 2024 | Wind |
| ZCO | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 1985 | Dec 2024 | Wind |
| Willow Spring Solar, LLC | Willow Spring Solar LLC | Rosamond, CA | California Independent System Operator (CISO) | 255.9 GWh | Dec 2018 | Sep 2025 | Solar |
| Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 44.4 GWh | Feb 2017 | Dec 2024 | Solar |
| Whitethorn Solar LLC | Whitethorn Solar LLC | Livermore, CA | California Independent System Operator (CISO) | 4.2 GWh | Jan 2016 | Dec 2024 | Solar |
| NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 40.6 GWh | Feb 2017 | Dec 2024 | Solar |
| Westside Solar Power PV1 | Westside Assets LLC | Lemoore, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 2016 | Dec 2024 | Solar |
| Solar Blue | Westlands Solar Blue (OZ) Owner, LLC | Lemoore, CA | California Independent System Operator (CISO) | 658.1 GWh | Nov 2023 | Sep 2025 | Solar |
| Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 39.2 GWh | Aug 2023 | Dec 2024 | Solar |
| Western Power & Steam Inc | Western Power and Steam II LLC | Bakersfield, CA | California Independent System Operator (CISO) | 25.2 GWh | Feb 1990 | Sep 2025 | Natural Gas |
| Sutter Home Winery GIR | Westbound Solar 3, LLC | American Canyon, CA | California Independent System Operator (CISO) | 1.8 GWh | Jul 2023 | Dec 2024 | Solar |
| West Tambo Clean Power II | West Tambo Clean Power II | Livingston, CA | California Independent System Operator (CISO) | 877.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Yuba City Cogen Partners | Wellhead Services, Inc | Yuba City, CA | California Independent System Operator (CISO) | 22.9 GWh | Nov 1990 | Dec 2024 | Natural Gas |
| Fresno Cogen Partners | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 1989 | Dec 2024 | Natural Gas |
| Wellhead Power Panoche | Wellhead Services, Inc | Firebaugh, CA | California Independent System Operator (CISO) | 3.3 GWh | Jul 1973 | Dec 2024 | Natural Gas |
| Chula Vista Energy Center | Wellhead Services, Inc | Chula Vista, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2001 | Nov 2024 | Natural Gas |
| Escondido Energy Center | Wellhead Services, Inc | Escondido, CA | California Independent System Operator (CISO) | 9.4 GWh | Dec 2013 | Dec 2024 | Natural Gas |
| El Cajon Energy Center | Wellhead Services, Inc | El Cajon, CA | California Independent System Operator (CISO) | 9.0 GWh | May 2010 | Dec 2024 | Natural Gas |
| Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 1.7 GWh | Jun 2020 | Sep 2025 | Natural Gas |
| Delano Energy Center | Wellhead Services, Inc | Delano, CA | California Independent System Operator (CISO) | 7.3 GWh | Dec 2012 | Dec 2024 | Natural Gas |
| Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 4.7 GWh | Sep 2015 | Dec 2024 | Solar |
| Double C Generation Limited Partnership | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 14.9 GWh | Feb 1989 | Dec 2024 | Natural Gas |
| McKittrick Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 6.1 GWh | Sep 1991 | Sep 2025 | Natural Gas |
| Live Oak Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 21.1 GWh | Feb 1992 | Sep 2025 | Natural Gas |
| Bear Mountain Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 32.6 GWh | Mar 1995 | Sep 2025 | Natural Gas |
| Badger Creek Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 6.2 GWh | Mar 1991 | Sep 2025 | Natural Gas |
| Chalk Cliff Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 3.8 GWh | Feb 1990 | Sep 2025 | Natural Gas |
| High Sierra Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 14.1 GWh | Feb 1989 | Dec 2024 | Natural Gas |
| Kern Front Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 12.2 GWh | Jan 1989 | Dec 2024 | Natural Gas |
| Watkins Manufacturing Co. | Watkins Manufacturing Corporation | San Diego, CA | California Independent System Operator (CISO) | 7.4 GWh | Oct 2001 | Sep 2025 | Natural Gas |
| Walnut Creek Energy Park | Walnut Creek LLC | Industry, CA | California Independent System Operator (CISO) | 63.2 GWh | Mar 2013 | Sep 2025 | Natural Gas |
| Wadham Energy LP | Wadham Energy Ltd Partners | Williams, CA | California Independent System Operator (CISO) | 132.0 GWh | Feb 1989 | Dec 2024 | Agricultural By-Products : 99.7% |
| Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2021 | Dec 2024 | Solar |
| Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2024 | Solar |
| Vikings Energy Farm | Vikings Energy Farm, LLC | Holtville, CA | Imperial Irrigation District (IID) | 310.4 GWh | Apr 2024 | Sep 2025 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 609.7 GWh | Feb 2024 | Sep 2025 | Solar |
| Ventura Solar | Ventura Solar LLC | Fillmore, CA | California Independent System Operator (CISO) | 6.2 GWh | Aug 2021 | Dec 2024 | Solar |
| Venable Solar 2 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Dec 2024 | Solar |
| Venable Solar 1 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Dec 2024 | Solar |
| Vega Solar | Vega Solar, LLC | Los Banos, CA | California Independent System Operator (CISO) | 51.1 GWh | Feb 2015 | Dec 2024 | Solar |
| Vasco Winds | Vasco Winds, LLC | Livermore, CA | California Independent System Operator (CISO) | 223.0 GWh | Nov 2011 | Dec 2024 | Wind |
| 9150 Hermosa Solar GM | Valta Energy | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 2.8 GWh | Nov 2022 | Dec 2024 | Solar |
| 20701 Plummer PV, LLC | Valta Energy | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 3.1 GWh | Jun 2022 | Dec 2024 | Solar |
| CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 642.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Valero Wilmington Cogeneration Plant | Valero Wilmington | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 228.2 GWh | Oct 2017 | Dec 2024 | Natural Gas |
| Valero Refinery Cogeneration Unit 1 | Valero Refining Co California | Benicia, CA | California Independent System Operator (CISO) | 275.4 GWh | Sep 2002 | Sep 2025 | Natural Gas : 87.7% Other Gas : 12.3% |
| VA Sepulveda Ambulatory Care Center | VA Sepulveda Ambulatory Care Center | North Hills, CA | Los Angeles Department of Water and Power (LDWP) | 3.9 GWh | Sep 2014 | Dec 2024 | Solar |
| Angels | Utica Water & Power Authority | Angels Camp, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 1939 | Dec 2024 | Water |
| Murphys | Utica Water & Power Authority | Murphys, CA | California Independent System Operator (CISO) | 15.5 GWh | Feb 1954 | Dec 2024 | Water |
| Univ of San Francisco Cogen | University of San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 5.2 GWh | Aug 1987 | Dec 2024 | Natural Gas |
| Energy Center | University of Redlands | Redlands, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2007 | Dec 2024 | Natural Gas |
| Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 67.6 GWh | Dec 1995 | Sep 2025 | Natural Gas |
| UCLA So Campus Cogen Project | University of California-LA | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 179.0 GWh | Sep 1993 | Sep 2025 | Natural Gas |
| University of California Santa Cruz | University of California Santa Cruz | Santa Cruz, CA | California Independent System Operator (CISO) | 35.2 GWh | Aug 2013 | Dec 2024 | Natural Gas : 91.7% Solar : 8.3% |
| Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2008 | Dec 2024 | Solar |
| University of California San Diego Hybri | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 205.4 GWh | Jun 2001 | Sep 2025 | Natural Gas |
| UCI Facilities Management Central Plant | University of California Irvine | Irvine, CA | California Independent System Operator (CISO) | 112.6 GWh | Jun 2007 | Sep 2025 | Natural Gas |
| Stampede | U S Bureau of Reclamation | Truckee, CA | Nevada Power Company (NEVP) | 15.6 GWh | Dec 1987 | Sep 2025 | Water |
| Judge F Carr | U S Bureau of Reclamation | French Gulch, CA | Balancing Authority of Northern California (BANC) | 319.4 GWh | Apr 1963 | Sep 2025 | Water |
| Trinity | U S Bureau of Reclamation | Weaverville, CA | Balancing Authority of Northern California (BANC) | 549.3 GWh | Jan 1964 | Sep 2025 | Water |
| Spring Creek | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 375.4 GWh | Dec 1963 | Sep 2025 | Water |
| Parker Dam | U S Bureau of Reclamation | Parker, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 390.7 GWh | Nov 1942 | Sep 2025 | Water |
| Shasta | U S Bureau of Reclamation | Redding, CA | Balancing Authority of Northern California (BANC) | 2.4 TWh | May 1944 | Sep 2025 | Water |
Browse Power Plants By California Counties
Figures are based on September 2025 generation numbers.| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.2 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| San Mateo County, CA | # 47 | 11 | 133.1 GWh |
| Yolo County, CA | # 46 | 15 | 216.2 GWh |
| Nevada County, CA | # 45 | 12 | 219.1 GWh |
| Siskiyou County, CA | # 44 | 8 | 236.7 GWh |
| Mariposa County, CA | # 43 | 2 | 299.7 GWh |
| San Benito County, CA | # 42 | 6 | 302.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 331.1 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Humboldt County, CA | # 39 | 10 | 467.8 GWh |
| Calaveras County, CA | # 38 | 6 | 513.9 GWh |
| Merced County, CA | # 37 | 31 | 522.8 GWh |
| Trinity County, CA | # 36 | 5 | 569.3 GWh |
| Amador County, CA | # 35 | 8 | 649.7 GWh |
| Ventura County, CA | # 34 | 32 | 756.5 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Lake County, CA | # 32 | 10 | 905.4 GWh |
| Madera County, CA | # 31 | 28 | 950.7 GWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Yuba County, CA | # 27 | 5 | 1.6 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Placer County, CA | # 24 | 24 | 2.0 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.2 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 3.2 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Butte County, CA | # 15 | 25 | 3.4 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.1 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| San Diego County, CA | # 12 | 151 | 5.1 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| Sacramento County, CA | # 10 | 65 | 6.4 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.8 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| Riverside County, CA | # 4 | 159 | 14.7 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.9 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.7 TWh |
| Kern County, CA | # 1 | 313 | 34.9 TWh |