Directory of Power Plants in California
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Moonlight Packing - Phase 2 | CalCom Energy | Reedley, CA | California Independent System Operator (CISO) | 2.6 GWh | May 2019 | Dec 2024 | Solar |
California City | MN8 Energy LLC | California City, CA | California Independent System Operator (CISO) | 4.6 GWh | Jun 2018 | Dec 2024 | Solar |
Lafayette 2 - Internal Services Dept | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.6 GWh | Jul 2020 | Dec 2024 | Solar |
Illumina Way SD | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 29.4 GWh | Aug 2019 | Dec 2024 | Natural Gas |
ATT North Watney | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 8.2 GWh | Nov 2019 | Dec 2024 | Natural Gas |
ATT Ventura Blvd | Bloom Energy | Sherman Oaks, CA | Los Angeles Department of Water and Power (LDWP) | 8.3 GWh | Oct 2019 | Dec 2024 | Natural Gas |
OES Biogas Power | Organic Energy Solutions, Inc. | San Bernardino, CA | California Independent System Operator (CISO) | 4.9 GWh | - | Dec 2024 | Other Biomass Gas |
Lafayette 2 - MLK Jr. Hospital (MLK) | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2020 | Dec 2024 | Solar |
Tracy 210 | Costco Wholesale | Tracy, CA | California Independent System Operator (CISO) | 21.2 GWh | Feb 2019 | Dec 2024 | Natural Gas |
North Kern State Prison Phase II | SunE P11L Holdings, LLC | Delano, CA | California Independent System Operator (CISO) | 6.5 GWh | Aug 2012 | Dec 2024 | Solar |
AGT000 Stevens Creek Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 7.6 GWh | Aug 2018 | Dec 2024 | Natural Gas |
CST001 McCarthy Fuel Cell | 2016 ESA Project Company, LLC | Milpitas, CA | California Independent System Operator (CISO) | 8.7 GWh | Dec 2018 | Dec 2024 | Natural Gas |
EQX010 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 19.6 GWh | Aug 2019 | Dec 2024 | Natural Gas |
EQX011 Duane Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 22.5 GWh | Aug 2018 | Dec 2024 | Natural Gas |
EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.6 GWh | Dec 2017 | Dec 2024 | Natural Gas |
JSR000 N Mathilda Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 9.2 GWh | May 2019 | Dec 2024 | Natural Gas |
KSR028 Merced Fuel Cell | 2016 ESA Project Company, LLC | San Leandro, CA | California Independent System Operator (CISO) | 15.7 GWh | Mar 2018 | Dec 2024 | Natural Gas |
GEN005 Antibody Fuel Cell | 2016 ESA Project Company, LLC | Oceanside, CA | California Independent System Operator (CISO) | 20.6 GWh | Mar 2019 | Dec 2024 | Natural Gas |
SCU000 El Camino Real Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 2018 | Dec 2024 | Natural Gas |
KSR053 Cantara Fuel Cell | 2016 ESA Project Company, LLC | Panorama City, CA | California Independent System Operator (CISO) | 12.1 GWh | Apr 2018 | Dec 2024 | Natural Gas |
TLR000 Hansen Fuel Cell | 2016 ESA Project Company, LLC | Salinas, CA | California Independent System Operator (CISO) | 8.2 GWh | Aug 2018 | Dec 2024 | Natural Gas |
Kroger La Habra | Ralph's Grocery Company | La Habra, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2020 | Dec 2024 | Solar |
Soscol Ferry Solar | Soscol Ferry Solar | Napa, CA | California Independent System Operator (CISO) | 4.8 GWh | Nov 2020 | Dec 2024 | Solar |
Silveira Ranch Road Solar | Silveira Ranch Road Solar | Novato, CA | California Independent System Operator (CISO) | 4.1 GWh | Feb 2021 | Dec 2024 | Solar |
Kern Valley SP | Ecoplexus, Inc | Delano, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2023 | Dec 2024 | Solar |
Vacaville Hospital | KP Vacaville Solar, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2019 | Dec 2024 | Solar |
Oasis Alta | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 57.0 GWh | Mar 2021 | Dec 2024 | Wind |
DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2021 | Dec 2024 | Solar |
FTF-PackingShed | Family Tree Farms | Reedley, CA | California Independent System Operator (CISO) | 581.0 MWh | May 2013 | Dec 2024 | Solar |
Firebaugh-CCS-PV-1 | Mike Woolf Farming | Firebaugh, CA | California Independent System Operator (CISO) | 1.9 GWh | Feb 2015 | Dec 2024 | Solar |
Toyota Long Beach Trigen | Long Beach Trigen, LLC | Long Beach, CA | California Independent System Operator (CISO) | 16.8 GWh | Oct 2023 | Dec 2024 | Other Biomass Gas |
San Diego - EMDF at San Diego | California PV Energy 3, LLC | San Diego, CA | California Independent System Operator (CISO) | 4.7 GWh | Mar 2021 | Dec 2024 | Solar |
San Diego - NCRC at Vista | California PV Energy 3, LLC | Vista, CA | California Independent System Operator (CISO) | 2.9 GWh | Feb 2021 | Dec 2024 | Solar |
Wonderful Orchards - New Columbia | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 9.7 GWh | Aug 2020 | Dec 2024 | Solar |
Still Water Power | Still Water Power LLC | Hanford, CA | California Independent System Operator (CISO) | 674.0 MWh | Apr 2020 | Dec 2024 | Other Biomass Gas |
Wonderful Orchards - Westside | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 12.7 GWh | Jul 2021 | Dec 2024 | Solar |
Wonderful Orchards - Belridge | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 11.9 GWh | Nov 2020 | Dec 2024 | Solar |
Las Virgenes | Greenbacker Renewable Energy Corporation | Calabasas, CA | Los Angeles Department of Water and Power (LDWP) | 7.1 GWh | Nov 2020 | Dec 2024 | Solar |
Valencia 2 | Greenbacker Renewable Energy Corporation | Imperial, CA | Imperial Irrigation District (IID) | 3.9 GWh | Nov 2020 | Dec 2024 | Solar |
ESCA-LL-COLTON, LLC | Madison Energy Holdings LLC | Colton, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2021 | Dec 2024 | Solar |
Tranquillity ID | Tranquillity Solar 1, LLC | Tranquillity, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2018 | Dec 2024 | Solar |
Firestone Walker Brewery - Phase 1 | SkyHigh 2 Solar | Paso Robles, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2020 | Dec 2024 | Solar |
EMWD - Perris Valley RWRF | SkyHigh 2 Solar | Perris, CA | California Independent System Operator (CISO) | 6.4 GWh | Jun 2021 | Dec 2024 | Solar |
EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 10.2 GWh | Jun 2021 | Dec 2024 | Solar |
EMWD - Sun City RWRF | SkyHigh 2 Solar | Menifee, CA | California Independent System Operator (CISO) | 3.7 GWh | Jun 2021 | Dec 2024 | Solar |
EMWD - San Jacinto RES BCT | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 3.0 GWh | Apr 2022 | Dec 2024 | Solar |
CSU San Jose State University | SkyHigh 2 Solar | San Jose, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2021 | Dec 2024 | Solar |
El Dorado County | SkyHigh 2 Solar | Placerville, CA | California Independent System Operator (CISO) | 2.9 GWh | Feb 2021 | Dec 2024 | Solar |
California State Univ at Channel Islands | SkyHigh 2 Solar | Camarillo, CA | California Independent System Operator (CISO) | 7.8 GWh | Nov 2021 | Dec 2024 | Solar |
EMWD - Moreno Valley RWRF | SkyHigh 2 Solar | Moreno Valley, CA | California Independent System Operator (CISO) | 5.5 GWh | Jun 2021 | Dec 2024 | Solar |
Vallecitos Water District | SSA Solar of CA 5, LLC | San Marcos, CA | California Independent System Operator (CISO) | 3.2 GWh | Aug 2021 | Dec 2024 | Solar |
Valencia 3 | Greenbacker Renewable Energy Corporation | Imperial, CA | Imperial Irrigation District (IID) | 6.6 GWh | Mar 2021 | Dec 2024 | Solar |
Byron Highway Solar | RPCA Solar 3, LLC | Byron, CA | California Independent System Operator (CISO) | 13.5 GWh | Oct 2022 | Dec 2024 | Solar |
Department of Justice | Ecoplexus, Inc | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.9 GWh | Mar 2020 | Dec 2024 | Solar |
CA Institute for Women | Ecoplexus, Inc | Chino, CA | California Independent System Operator (CISO) | 2.2 GWh | Jan 2020 | Dec 2024 | Solar |
Centinela State Prison | Ecoplexus, Inc | Sacramento, CA | Imperial Irrigation District (IID) | 16.7 GWh | Nov 2019 | Dec 2024 | Solar |
Calipatria State Prison | Ecoplexus, Inc | Calipatria, CA | Imperial Irrigation District (IID) | 16.5 GWh | Nov 2019 | Dec 2024 | Solar |
Atascadero State Hospital | Ecoplexus, Inc | Atascadero, CA | California Independent System Operator (CISO) | 2.8 GWh | Jul 2020 | Dec 2024 | Solar |
Broadway 2 - UC Riverside | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2014 | Dec 2024 | Solar |
Prologis L.P | EnterSolar | Tracy, CA | California Independent System Operator (CISO) | 5.8 GWh | Jul 2018 | Dec 2024 | Solar |
SEPV Sierra | SEPV Sierra, LLC | Lancaster, CA | California Independent System Operator (CISO) | 5.0 GWh | Mar 2020 | Dec 2024 | Solar |
Diamond H Dairy Power | Madera DP 2, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 11.9 GWh | Sep 2021 | Dec 2024 | Other Biomass Gas |
Lake Herman | Greenbacker Renewable Energy Corporation | Benicia, CA | California Independent System Operator (CISO) | 13.0 GWh | Oct 2021 | Dec 2024 | Solar |
Dos Palos | Greenbacker Renewable Energy Corporation | Dos Palos, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2021 | Dec 2024 | Solar |
El Dorado Solar, LLC | Greenbacker Renewable Energy Corporation | El Dorado Hills, CA | California Independent System Operator (CISO) | 2.9 GWh | Mar 2021 | Dec 2024 | Solar |
Amazon PSP1 | Greenbacker Renewable Energy Corporation | Beaumont, CA | California Independent System Operator (CISO) | 7.5 GWh | Sep 2021 | Dec 2024 | Solar |
Catalina Express | Altus Power America Management, LLC | San Pedro, CA | California Independent System Operator (CISO) | 1.7 GWh | Nov 2020 | Dec 2024 | Solar |
Marina South | Altus Power America Management, LLC | San Pedro, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2020 | Dec 2024 | Solar |
Prairie | Altus Power America Management, LLC | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 2.7 GWh | Mar 2021 | Dec 2024 | Solar |
Deer Creek 2 | Greenbacker Renewable Energy Corporation | Shingle Springs, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2021 | Dec 2024 | Solar |
Trona Solar III | Trona Solar III LLC | Trona, CA | California Independent System Operator (CISO) | 4.5 GWh | Mar 2023 | Dec 2024 | Solar |
Sacramento Point West Medical Offices | KP Sacramento Point West Medical Offices Solar, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.1 GWh | Oct 2020 | Dec 2024 | Solar |
SSI West Riverside Landfill LLC | Standard Solar | Riverside, CA | Los Angeles Department of Water and Power (LDWP) | 4.3 GWh | Oct 2020 | Dec 2024 | Solar |
Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 480.0 MWh | Feb 2022 | Dec 2024 | Solar |
IGS KSBD | Greenbacker Renewable Energy Corporation | Highland, CA | California Independent System Operator (CISO) | 9.0 GWh | Feb 2022 | Dec 2024 | Solar |
University of the Pacific | The Greater Light USA LLC | Stockton, CA | California Independent System Operator (CISO) | 6.5 GWh | Apr 2022 | Dec 2024 | Solar |
Van der Kooi Dairy Solar Array | Maas Energy Works | Riverdale, CA | California Independent System Operator (CISO) | 3.7 GWh | Mar 2021 | Dec 2024 | Solar |
Donaghy-Stockton | Donaghy Sales Inc. | Stockton, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2021 | Dec 2024 | Solar |
CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Sep 2022 | Dec 2024 | Solar |
Broadway 3 - UC Merced 1 | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 901.0 MWh | Sep 2009 | Dec 2024 | Solar |
Broadway 3 - UCSB Lot 38 | MN8 Energy LLC | Santa Barbara, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2016 | Dec 2024 | Solar |
Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2018 | Dec 2024 | Solar |
University of San Diego | Bloom Energy 2009 PPA | San Diego, CA | California Independent System Operator (CISO) | 8.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
CalTech - Pasadena (PPA) | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 8.7 GWh | Feb 2016 | Dec 2024 | Natural Gas |
SCC - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.5 GWh | Feb 2014 | Dec 2024 | Natural Gas |
Keysight - Santa Rosa | Bloom Energy | Santa Rosa, CA | California Independent System Operator (CISO) | 12.8 GWh | Aug 2018 | Dec 2024 | Natural Gas |
DirecTV - Los Angeles | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 8.3 GWh | Sep 2016 | Dec 2024 | Natural Gas |
AT&T - Redwood City | Bloom Energy | Redwood City, CA | California Independent System Operator (CISO) | 5.6 GWh | Feb 2013 | Dec 2024 | Natural Gas |
AT&T - Gardena | Bloom Energy | Gardena, CA | California Independent System Operator (CISO) | 7.8 GWh | May 2013 | Dec 2024 | Natural Gas |
AT&T - Hawthorne | Bloom Energy | Hawthorne, CA | California Independent System Operator (CISO) | 6.5 GWh | Sep 2016 | Dec 2024 | Natural Gas |
AT&T - Hayward | Bloom Energy | Hayward, CA | California Independent System Operator (CISO) | 8.2 GWh | Oct 2016 | Dec 2024 | Natural Gas |
Enloe Medical - Chico | Bloom Energy | Chico, CA | California Independent System Operator (CISO) | 13.3 GWh | May 2021 | Dec 2024 | Natural Gas |
Comcast - Universal City | Bloom Energy | Universal City, CA | California Independent System Operator (CISO) | 7.8 GWh | Aug 2021 | Dec 2024 | Natural Gas |
OK Produce Fresno Carport | OK Produce | Fresno, CA | California Independent System Operator (CISO) | 3.6 GWh | Dec 2018 | Dec 2024 | Solar |
Chambers 4 - Eastvale LGB3 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2019 | Dec 2024 | Solar |
Chambers 4 - Redland LGB4 | MN8 Energy LLC | Redlands, CA | California Independent System Operator (CISO) | 1.4 GWh | Feb 2019 | Dec 2024 | Solar |
Chambers 4 - Rialto LGB8 | MN8 Energy LLC | Rialto, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2018 | Dec 2024 | Solar |
Chambers 4 - Sacramento SMF1 | MN8 Energy LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Aug 2018 | Dec 2024 | Solar |
Chambers 4 - Eastvale DCA2 | MN8 Energy LLC | Eastvale, CA | California Independent System Operator (CISO) | 424.0 MWh | Nov 2018 | Dec 2024 | Solar |
Chambers 4 - San Bernardino SNA7 | MN8 Energy LLC | San Bernardino, CA | California Independent System Operator (CISO) | 595.0 MWh | Nov 2018 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2024 generation numbers.County | State Rank | Active Plants | Dec 2024 Generation |
---|---|---|---|
Mendocino County, CA | # 55 | 5 | 12.3 GWh |
Glenn County, CA | # 54 | 2 | 18.7 GWh |
Marin County, CA | # 53 | 3 | 19.0 GWh |
Sierra County, CA | # 52 | 3 | 31.1 GWh |
Napa County, CA | # 51 | 9 | 49.2 GWh |
Santa Cruz County, CA | # 50 | 6 | 56.2 GWh |
Tehama County, CA | # 49 | 7 | 59.7 GWh |
San Francisco County, CA | # 48 | 10 | 85.0 GWh |
San Mateo County, CA | # 47 | 10 | 133.4 GWh |
Nevada County, CA | # 46 | 12 | 207.0 GWh |
Yolo County, CA | # 45 | 15 | 222.2 GWh |
Siskiyou County, CA | # 44 | 8 | 242.5 GWh |
Mariposa County, CA | # 43 | 2 | 299.7 GWh |
Santa Barbara County, CA | # 42 | 18 | 327.1 GWh |
San Benito County, CA | # 41 | 6 | 332.7 GWh |
Lassen County, CA | # 40 | 9 | 341.0 GWh |
Merced County, CA | # 39 | 30 | 418.2 GWh |
Humboldt County, CA | # 38 | 10 | 480.9 GWh |
Trinity County, CA | # 37 | 5 | 573.8 GWh |
Calaveras County, CA | # 36 | 6 | 613.6 GWh |
Amador County, CA | # 35 | 8 | 666.5 GWh |
Mono County, CA | # 34 | 9 | 785.9 GWh |
Ventura County, CA | # 33 | 32 | 828.4 GWh |
Lake County, CA | # 32 | 10 | 921.2 GWh |
Madera County, CA | # 31 | 28 | 994.0 GWh |
Tulare County, CA | # 30 | 68 | 1.0 TWh |
Inyo County, CA | # 29 | 23 | 1.2 TWh |
El Dorado County, CA | # 28 | 15 | 1.5 TWh |
County | State Rank | Active Plants | Dec 2024 Generation |
---|---|---|---|
Yuba County, CA | # 27 | 5 | 1.7 TWh |
Sutter County, CA | # 26 | 8 | 1.8 TWh |
Plumas County, CA | # 25 | 13 | 2.0 TWh |
Placer County, CA | # 24 | 23 | 2.1 TWh |
San Joaquin County, CA | # 23 | 45 | 2.3 TWh |
Alameda County, CA | # 22 | 46 | 2.4 TWh |
Stanislaus County, CA | # 21 | 25 | 2.6 TWh |
Colusa County, CA | # 20 | 3 | 2.9 TWh |
Tuolumne County, CA | # 19 | 23 | 3.0 TWh |
Solano County, CA | # 18 | 40 | 3.0 TWh |
Orange County, CA | # 17 | 59 | 3.2 TWh |
Monterey County, CA | # 16 | 29 | 3.7 TWh |
Butte County, CA | # 15 | 25 | 3.8 TWh |
Kings County, CA | # 14 | 57 | 4.1 TWh |
Santa Clara County, CA | # 13 | 74 | 4.4 TWh |
San Diego County, CA | # 12 | 150 | 5.0 TWh |
Sonoma County, CA | # 11 | 26 | 5.2 TWh |
Sacramento County, CA | # 10 | 64 | 6.4 TWh |
Shasta County, CA | # 9 | 46 | 7.2 TWh |
Fresno County, CA | # 8 | 109 | 8.1 TWh |
Imperial County, CA | # 7 | 84 | 9.7 TWh |
Contra Costa County, CA | # 6 | 56 | 13.4 TWh |
San Bernardino County, CA | # 5 | 203 | 13.4 TWh |
Riverside County, CA | # 4 | 159 | 14.3 TWh |
San Luis Obispo County, CA | # 3 | 22 | 20.6 TWh |
Los Angeles County, CA | # 2 | 307 | 20.7 TWh |
Kern County, CA | # 1 | 311 | 34.0 TWh |