Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Westmont 400B | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.6 GWh | Jun 2017 | Dec 2024 | Solar |
| Amazon - Patterson PV | AES Distributed Energy | Patterson, CA | Balancing Authority of Northern California (BANC) | 4.8 GWh | Apr 2017 | Dec 2024 | Solar |
| Valencia 1 Solar CA | Altus Power America Management, LLC | Westmorland, CA | Imperial Irrigation District (IID) | 6.7 GWh | Aug 2017 | Dec 2024 | Solar |
| One Ten Partners PV | One Ten Partners, LLC | Palmdale, CA | California Independent System Operator (CISO) | 6.1 GWh | Aug 2017 | Dec 2024 | Solar |
| Merced 1 PV | ZGlobal Inc | Los Banos, CA | California Independent System Operator (CISO) | 6.5 GWh | Mar 2018 | Dec 2024 | Solar |
| Madera 1 PV | ZGlobal Inc | Madera, CA | California Independent System Operator (CISO) | 3.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Foundation California Training Facility | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 5.4 GWh | Jul 2018 | Dec 2024 | Wind |
| Foundation Mann Packing | Foundation CA Fund IX Manager, LLC | Gonzales, CA | California Independent System Operator (CISO) | 5.6 GWh | Mar 2019 | Dec 2024 | Wind |
| Foundation SaIinas Valley State Prison | Foundation CA Fund IX Manager, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.8 GWh | Jul 2018 | Dec 2024 | Wind |
| Gaskell West 1 Solar Facility | Southern Power Co | Lancaster, CA | California Independent System Operator (CISO) | 52.6 GWh | Feb 2018 | Dec 2024 | Solar |
| RE Gaskell West 3 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2023 | Dec 2024 | Solar |
| RE Gaskell West 4 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 50.0 GWh | Apr 2023 | Dec 2024 | Solar |
| RE Gaskell West 5 LLC | RE Gaskell West LLC | Rosamond, CA | California Independent System Operator (CISO) | 49.3 GWh | Apr 2023 | Dec 2024 | Solar |
| Vandenberg Solar Project | MN8 Energy LLC | Vandenberg Airforce B, CA | California Independent System Operator (CISO) | 39.7 GWh | Nov 2017 | Dec 2024 | Solar |
| ABEC #2 dba West-Star Dairy | ABEC #2 LLC | Buttonwillow, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| ABEC #3 dba Lakeview Dairy | ABEC #3 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 6.0 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| ABEC #4 dba CE&S Dairy | ABEC #4 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 7.9 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| Voyager Wind IV | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 80.9 GWh | Nov 2018 | Dec 2024 | Wind |
| Westmont 301 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 2.9 GWh | Oct 2017 | Dec 2024 | Solar |
| Westmont 401 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 4.3 GWh | Oct 2017 | Dec 2024 | Solar |
| Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 9.5 GWh | Apr 2018 | Dec 2024 | Solar |
| CDCR (CA) - Solano State Prison | SunE Solano SP Owner, LLC | Vacaville, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2013 | Dec 2024 | Solar |
| CDCR (CA) - Corcoran State Prison | SunE Corcoran SP Owner, LLC | Corcoran, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2013 | Dec 2024 | Solar |
| CDCR (CA) - Wasco State Prison | SunE Wasco SP Owner, LLC | Wasco, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2013 | Dec 2024 | Solar |
| Kilroy Solar | Nautilus Solar Solutions | San Diego, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2017 | Dec 2024 | Solar |
| USG 1 | ZGlobal Inc | El Centro, CA | Imperial Irrigation District (IID) | 3.0 GWh | Mar 2014 | Dec 2024 | Solar |
| USG 2 | ZGlobal Inc | El Centro, CA | Imperial Irrigation District (IID) | 2.0 GWh | Nov 2015 | Dec 2024 | Solar |
| IVC Solar | Imperial Irrigation District | Imperial, CA | Imperial Irrigation District (IID) | 4.2 GWh | Nov 2016 | Dec 2024 | Solar |
| Folsom SP and CSP Sacramento | Ecoplexus, Inc | Represa, CA | Balancing Authority of Northern California (BANC) | 2.3 GWh | Apr 2019 | Dec 2024 | Solar |
| Stage Gulch Solar | Stage Gulch Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2024 | Solar |
| Lavio Solar | Lavio Solar, LLC | Petaluma, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2018 | Dec 2024 | Solar |
| Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2016 | Dec 2024 | Solar |
| SeaWorld Aquatica | Onyx Asset Services Group | Chula Vista, CA | California Independent System Operator (CISO) | 1.9 GWh | Apr 2018 | Dec 2024 | Solar |
| National Raisin | National Raisin | Fowler, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2015 | Dec 2024 | Solar |
| Pacific Ethanol Madera Solar Array | Seaboard Energy California, LLC | Madera, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2018 | Dec 2024 | Solar |
| UC Merced Solar Hybrid | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2018 | Dec 2024 | Solar |
| UC Riverside Lots 30 & 32 | MN8 Energy LLC | Riverside, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 2017 | Dec 2024 | Solar |
| Stanford Campus Solar | MN8 Energy LLC | Stanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Feb 2017 | Dec 2024 | Solar |
| CSU Long Beach Lots 7 & 14 | MN8 Energy LLC | Long Beach, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 8.1 GWh | Oct 2018 | Dec 2024 | Solar |
| Blue Shld Of Cal- El Dorado Hlls Mtr B | Tesla Inc. | El Dorado Hills, CA | Balancing Authority of Northern California (BANC) | 2.8 GWh | Jun 2019 | Dec 2024 | Solar |
| Chaffey College Rancho Cucamonga Campus | Chaffey Community College District | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 6.6 GWh | Jan 2017 | Dec 2024 | Solar |
| Berry NMW Cogens | Berry Petroleum Co | Bakersfield, CA | California Independent System Operator (CISO) | 75.4 GWh | Oct 2017 | Dec 2024 | Natural Gas |
| County of San Diego SBRC | MN8 Energy LLC | Chula Vista, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2018 | Dec 2024 | Solar |
| Target Woodland Solar Project | MN8 Energy LLC | Woodland, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2018 | Dec 2024 | Solar |
| Liberty HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Frontier HS Solar Project | MN8 Energy LLC | Bakersfield, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Xebec 1 | AES Distributed Energy | Sun Valley, CA | Los Angeles Department of Water and Power (LDWP) | 2.3 GWh | Nov 2018 | Dec 2024 | Solar |
| Francisco St. Solar | AES Distributed Energy | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Nov 2018 | Dec 2024 | Solar |
| Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Oct 2022 | Dec 2024 | Solar |
| CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 642.0 MWh | Nov 2018 | Dec 2024 | Solar |
| Verwey-Hanford Dairy Digester #2 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.9 GWh | Jun 2019 | Dec 2024 | Other Biomass Gas |
| Verwey-Hanford Dairy Digester #3 | Hanford Renewable Energy LLC | Hanford, CA | California Independent System Operator (CISO) | 5.4 GWh | Jun 2019 | Dec 2024 | Other Biomass Gas |
| Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 8.0 GWh | Nov 2018 | Dec 2024 | Natural Gas |
| Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.6 GWh | Jun 2018 | Dec 2024 | Natural Gas |
| Little Bear 3 | Little Bear Solar 3, LLC (Longroad) | Mendota, CA | California Independent System Operator (CISO) | 26.2 GWh | Nov 2020 | Dec 2024 | Solar |
| Renew Solar ABC Sacramento LLC | Greenbacker Renewable Energy Corporation | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.7 GWh | Oct 2020 | Dec 2024 | Solar |
| Almond | Westlands Almond LLC | Lemoore, CA | California Independent System Operator (CISO) | 39.2 GWh | Aug 2023 | Dec 2024 | Solar |
| Disney Prospect | Bloom Energy | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 8.5 GWh | Feb 2017 | Dec 2024 | Natural Gas |
| ATT Kelvin | Bloom Energy | Irvine, CA | California Independent System Operator (CISO) | 8.0 GWh | Mar 2017 | Dec 2024 | Natural Gas |
| ATT Van Nyus | Bloom Energy | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 7.6 GWh | Jun 2017 | Dec 2024 | Natural Gas |
| FLEX Gibraltar | Bloom Energy | Milpitas, CA | California Independent System Operator (CISO) | 8.7 GWh | Jan 2017 | Dec 2024 | Natural Gas |
| PFMG Solar Grossmont Helix LLC | Altus Power America Management, LLC | La Mesa, CA | California Independent System Operator (CISO) | 2.0 GWh | Apr 2018 | Dec 2024 | Solar |
| SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.2 GWh | Nov 2019 | Dec 2024 | Solar |
| Foundation Dole Fresh Vegetables | Foundation CA Fund X Manager LLC | Soledad, CA | California Independent System Operator (CISO) | 17.1 GWh | Jul 2022 | Dec 2024 | Wind |
| HL Solar | HL Solar LLC | Wendel, CA | California Independent System Operator (CISO) | 11.5 GWh | May 2019 | Dec 2024 | Solar |
| Equinix Caspian Dr. Fuel Cell | 2016 ESA Project Company, LLC | Sunnyvale, CA | California Independent System Operator (CISO) | 38.3 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 31.7 GWh | May 2021 | Dec 2024 | Solar |
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.0 GWh | May 2021 | Dec 2024 | Solar |
| American Canyon Solar | RP Napa Solar 1, LLC | American Canyon, CA | California Independent System Operator (CISO) | 6.9 GWh | Aug 2019 | Dec 2024 | Solar |
| Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.8 GWh | Sep 2017 | Dec 2024 | Solar |
| Guadalupe Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2018 | Dec 2024 | Solar |
| Mission College Blvd. Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 39.9 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Kaiser East La Palma Ave. Fuel Cell | 2016 ESA Project Company, LLC | Anaheim, CA | California Independent System Operator (CISO) | 18.1 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Kaiser Deer Valley Rd. Fuel Cell | 2016 ESA Project Company, LLC | Antioch, CA | California Independent System Operator (CISO) | 11.2 GWh | Mar 2017 | Dec 2024 | Natural Gas |
| Kaiser Owens Dr. Fuel Cell | 2016 ESA Project Company, LLC | Pleasanton, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Kaiser Napa Valley Corporate Dr Fuel Cel | 2016 ESA Project Company, LLC | Napa, CA | California Independent System Operator (CISO) | 37.6 GWh | May 2017 | Dec 2024 | Natural Gas |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.9 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.3 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Equinix Douglas St. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 8.0 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Equinix Maple Ave. Fuel Cell | 2016 ESA Project Company, LLC | El Segundo, CA | California Independent System Operator (CISO) | 7.7 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Solar Star Palo Alto I, LLC | DG 1 Acquisition Co., LLC | Palo Alto, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2019 | Dec 2024 | Solar |
| Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2024 | Solar |
| Windsor Floating Solar | CA ODEVI LLC | Windsor, CA | California Independent System Operator (CISO) | 2.5 GWh | Oct 2020 | Dec 2024 | Solar |
| Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Wildflower Solar 1 | Lightsource Renewable Energy Asset Management, LLC | Elverta, CA | Balancing Authority of Northern California (BANC) | 27.9 GWh | Nov 2020 | Dec 2024 | Solar |
| SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| CalCity Solar 1 | CalCity Solar 1, LLC | California City, CA | California Independent System Operator (CISO) | 7.9 GWh | Oct 2019 | Dec 2024 | Solar |
| SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.8 GWh | Sep 2018 | Dec 2024 | Solar |
| Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Eagle Creek | ZGlobal Inc | Taft, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Santa Barbara ReSource Center | County of Santa Barbara | Goleta, CA | California Independent System Operator (CISO) | 5.4 GWh | May 2022 | Dec 2024 | Other Biomass Gas |
| Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2021 | Dec 2024 | Solar |
| CID Solar (CA) | DG California Solar LLC | Corcoran, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2019 | Dec 2024 | Solar |
| Valero Wilmington Cogeneration Plant | Valero Wilmington | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 228.2 GWh | Oct 2017 | Dec 2024 | Natural Gas |
| Alticor Inc - Solar Project | MN8 Energy LLC | Buena Park, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2024 | Solar |
| Medline Ind. Phase 2 Tracy | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 2.0 GWh | Mar 2018 | Dec 2024 | Solar |
| Niagara Bottling Stockton | ClearGen LLC | Stockton, CA | California Independent System Operator (CISO) | 870.0 MWh | Dec 2017 | Dec 2024 | Solar |
| SCV Water - Gladbach Water Treatment Plant Phases I and II | SCV Water | Santa Clara, CA | California Independent System Operator (CISO) | 5.0 GWh | Nov 2014 | Dec 2024 | Solar |
| IOS II-LAX9 | Madison Energy Holdings LLC | Fontana, CA | California Independent System Operator (CISO) | 7.2 GWh | Jan 2020 | Dec 2024 | Solar |
Browse Power Plants By California Counties
Figures are based on October 2025 generation numbers.| County | State Rank | Active Plants | Oct 2025 Generation |
|---|---|---|---|
| Mendocino County, CA | # 55 | 5 | 12.3 GWh |
| Glenn County, CA | # 54 | 2 | 18.7 GWh |
| Marin County, CA | # 53 | 3 | 19.0 GWh |
| Sierra County, CA | # 52 | 3 | 33.0 GWh |
| Napa County, CA | # 51 | 9 | 51.0 GWh |
| Tehama County, CA | # 50 | 7 | 59.7 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.5 GWh |
| San Francisco County, CA | # 48 | 10 | 84.0 GWh |
| Siskiyou County, CA | # 47 | 8 | 89.8 GWh |
| San Mateo County, CA | # 46 | 11 | 133.9 GWh |
| Yolo County, CA | # 45 | 15 | 212.2 GWh |
| Nevada County, CA | # 44 | 12 | 219.1 GWh |
| San Benito County, CA | # 43 | 6 | 293.7 GWh |
| Mariposa County, CA | # 42 | 2 | 299.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 337.8 GWh |
| Lassen County, CA | # 40 | 9 | 341.0 GWh |
| Humboldt County, CA | # 39 | 10 | 472.3 GWh |
| Calaveras County, CA | # 38 | 6 | 501.4 GWh |
| Merced County, CA | # 37 | 31 | 543.8 GWh |
| Trinity County, CA | # 36 | 5 | 570.3 GWh |
| Amador County, CA | # 35 | 8 | 664.9 GWh |
| Ventura County, CA | # 34 | 32 | 752.7 GWh |
| Mono County, CA | # 33 | 9 | 785.9 GWh |
| Lake County, CA | # 32 | 10 | 904.9 GWh |
| Madera County, CA | # 31 | 28 | 970.8 GWh |
| Inyo County, CA | # 30 | 23 | 1.1 TWh |
| El Dorado County, CA | # 29 | 15 | 1.4 TWh |
| Tulare County, CA | # 28 | 69 | 1.5 TWh |
| County | State Rank | Active Plants | Oct 2025 Generation |
|---|---|---|---|
| Yuba County, CA | # 27 | 5 | 1.5 TWh |
| Sutter County, CA | # 26 | 8 | 1.8 TWh |
| Plumas County, CA | # 25 | 13 | 1.9 TWh |
| Placer County, CA | # 24 | 24 | 1.9 TWh |
| San Joaquin County, CA | # 23 | 47 | 2.1 TWh |
| Alameda County, CA | # 22 | 47 | 2.5 TWh |
| Tuolumne County, CA | # 21 | 23 | 2.7 TWh |
| Stanislaus County, CA | # 20 | 25 | 2.8 TWh |
| Orange County, CA | # 19 | 59 | 2.9 TWh |
| Colusa County, CA | # 18 | 3 | 2.9 TWh |
| Monterey County, CA | # 17 | 29 | 2.9 TWh |
| Solano County, CA | # 16 | 40 | 3.2 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 75 | 4.0 TWh |
| Kings County, CA | # 13 | 57 | 4.3 TWh |
| San Diego County, CA | # 12 | 151 | 4.9 TWh |
| Sonoma County, CA | # 11 | 26 | 5.2 TWh |
| Sacramento County, CA | # 10 | 65 | 6.5 TWh |
| Fresno County, CA | # 9 | 119 | 7.6 TWh |
| Shasta County, CA | # 8 | 46 | 7.7 TWh |
| Imperial County, CA | # 7 | 84 | 9.7 TWh |
| San Bernardino County, CA | # 6 | 204 | 12.6 TWh |
| Contra Costa County, CA | # 5 | 56 | 13.2 TWh |
| Riverside County, CA | # 4 | 159 | 14.8 TWh |
| Los Angeles County, CA | # 3 | 308 | 18.1 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.0 TWh |
| Kern County, CA | # 1 | 313 | 34.9 TWh |