Gridley Main Two

1898 Highway 99, Gridley, CA 95948

Plant Summary Information

Gridley Main Two is ranked #447 out of 761 solar farms in California in terms of total annual net electricity generation.

Gridley Main Two generated 669.0 MWh during the 3-month period between September 2023 to December 2023.

Plant NameGridley Main Two
Utility NameAltus Power America Management, LLC
LocationButte County, CA
Initial Operation DateApril 2013
Last Update Dec 2023
Annual Generation 4.0 GWh
Annual Consumption 14.3 k MMBtu
Ranked #8,124 out of 11,623 Power Plants Nationwide
Ranked #3,249 out of 5,666 Solar Power Plants Nationwide
Ranked #1,109 out of 1,487 California Power Plants
Ranked #447 out of 761 California Solar Power Plants
Fuel Types Solar
Previous Operator Light Beam Power Co LLC (2013 to 2020)
Altus Power America Management, LLC (2021 to 2023)

Map of Gridley Main Two

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gridley Main Two.

Create Your Account Today

Monthly Net Generation for Gridley Main Two

Gridley Main Two Details

Summary Information
Plant NameGridley Main Two (58371)
Plant Address1898 Highway 99, Gridley, CA 95948
UtilityAltus Power America Management, LLC (60281)
Latitude, Longitude39.37333, -121.68167
Generation Dates on FileJan 2014 to Dec 2023
Initial Operation DateApril 2013
Annual Generation 4.0 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator GEN1 Details Operating April 2013

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity2.5 MW
Summer Capacity2.5 MW
Winter Capacity2.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2013
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
DC Net Capacity3 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Gridley Main Two Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3239Lenape IIIndianapolis, IN4.0 GWh
#3240WED Kingstown Solar I - East ArrayWashington, RI4.0 GWh
#3241Syncarpha QuestaCerro, NM4.0 GWh
#3242Thomas Creek SolarMolalla, OR4.0 GWh
#3243Viper SolarRockfish, NC4.0 GWh
#3244McLean HomesteadLaurinburg, NC4.0 GWh
#3245Town of Needham VNEM CSGNeedham, MA4.0 GWh
#3246Kent School Road Solar 1Kent, IL4.0 GWh
#3247SSD Marion 5, LLCWoodburn, OR4.0 GWh
#3248Clay FCLouisville, IL4.0 GWh
#3250Dynamic Corinth (CSG)Corinth, ME4.0 GWh
#3251Rockford CS 1Rockford, IL4.0 GWh
#3252Rockford SolarRockford, IL4.0 GWh
#3253Red Prairie SolarSheridan, OR4.0 GWh
#3254Rockford CSGRockford, IL4.0 GWh
#3255Cosper Creek Solar (CSG)Willamina, OR4.0 GWh
#3256Albuquerque Solar Energy CenterAlbuquerque, NM4.0 GWh
#3257Long Henry SolarSeven Springs, NC4.0 GWh
#3258Tyngsborough SolarTyngsborough, MA4.0 GWh
#3259Fennimore SolarFennimore, WI4.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Gridley Main Two.

Plant NamePlant LocationAnnual GenerationDistance
2127 Harris Solar ProjectLive Oak, CA1.5 GWh5.7 mi
Ameresco Butte CountyParadise, CA16.0 GWh20.9 mi
Butte College Main Campus SolarOroville, CA6.7 GWh19.1 mi
Edward C HyattOroville, CA2.3 TWh15.5 mi
Feather River Energy CenterYuba City, CA45.2 GWh18.6 mi
ForbestownForbestown, CA155.0 GWh24.7 mi
G2 Energy Ostrom Road LLCWheatland, CA25.2 GWh25.7 mi
Greenleaf 1Yuba City, CA2.6 GWh22.2 mi
Greenleaf 2 Power PlantYuba City, CA33.1 GWh16.5 mi
Gridley MainGridley, CA1.6 GWh0.1 mi
Kelly RidgeOroville, CA65.0 GWh14.9 mi
Narrows 2Browns Valley, CA276.7 GWh23.9 mi
Narrows PHGrass Valley, CA73.5 GWh23.9 mi
Oroville Cogeneration LPOroville, CA235.0 MWh10.4 mi
Sierra Nevada Brewing Co HybridChico, CA9.3 GWh25.3 mi
Sutter Energy CenterYuba City, CA1.7 TWh22.1 mi
ThermalitoOroville, CA340.4 GWh10.2 mi
Thermalito Diverson DamOroville, CA16.5 GWh12.9 mi
Yuba City Cogen PartnersYuba City, CA19.0 GWh16.5 mi
Yuba City Energy CenterYuba City, CA49.3 GWh16.3 mi