Gridley Main Two

1898 Highway 99, Gridley, CA 95948

Plant Summary Information

Gridley Main Two is ranked #529 out of 852 solar farms in California in terms of total annual net electricity generation.

Gridley Main Two generated 385.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameGridley Main Two
Utility NameAltus Power America Management, LLC
LocationButte County, CA
Initial Operation DateApril 2013
Last Update Dec 2024
Annual Generation 3.4 GWh
Annual Consumption 12.2 k MMBtu
Ranked #9,165 out of 12,613 Power Plants Nationwide
Ranked #4,108 out of 6,463 Solar Power Plants Nationwide
Ranked #1,226 out of 1,603 California Power Plants
Ranked #529 out of 852 California Solar Power Plants
Fuel Types Solar
Previous Operator Light Beam Power Co LLC (2013 to 2020)
Altus Power America Management, LLC (2021 to 2024)

Map of Gridley Main Two

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gridley Main Two.

Create Your Account Today

Monthly Net Generation for Gridley Main Two

Monthly Plant Fuel Consumption for Gridley Main Two

Gridley Main Two Details

Summary Information
Plant NameGridley Main Two (58371)
Plant Address1898 Highway 99, Gridley, CA 95948
UtilityAltus Power America Management, LLC (60281)
Latitude, Longitude39.37333, -121.68167
Generation Dates on FileJan 2014 to Dec 2024
Initial Operation DateApril 2013
Annual Generation 3.4 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator GEN1 Details Operating April 2013

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity2.5 MW
Summer Capacity2.5 MW
Winter Capacity2.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2013
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
DC Net Capacity3 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Gridley Main Two Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#4098Powhatan Solar Power Generation StationApple Valley, CA3.4 GWh
#4099Amsterdam SouthAmsterdam, NY3.4 GWh
#4100Suncaster, LLCPikeville, NC3.4 GWh
#4101Plainfield Community Solar LLCPlainfield, MA3.4 GWh
#4102Venable Solar 1Blythe, CA3.4 GWh
#4103Venable Solar 2Blythe, CA3.4 GWh
#4104Oak Leaf Solar XXXI LLC (CSG)Debeque, CO3.4 GWh
#4105Oak Leaf Solar XXIII LLC (CSG)Watkins, CO3.4 GWh
#4106Fairhaven EFairhaven, MA3.4 GWh
#4107Marlborough SolarMilton, NY3.4 GWh
#4109Lakeland Solar Energy LLCLakeland, GA3.4 GWh
#4110Cecil County CCVT HSElkton, MD3.4 GWh
#4111Dignity - San MartinLas Vegas, NV3.4 GWh
#4112Richlands Solar, LLCRichlands, NC3.4 GWh
#4113Otoe Solar Power Generation Station 1 LLApple Valley, CA3.4 GWh
#4114Whitcomb Solar FarmEssex Junction, VT3.4 GWh
#4115HCE Powhatan Solar, LLCPowhatan, VA3.4 GWh
#4116Runway Solar FarmMyrtle Beach, SC3.4 GWh
#4117Powatan Road SolarClayton, NC3.4 GWh
#4118New Beginnings SolarKingston, NY3.4 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Gridley Main Two.

Plant NamePlant LocationAnnual GenerationDistance
2127 Harris Solar ProjectLive Oak, CA1.5 GWh5.7 mi
Ameresco Butte CountyParadise, CA16.8 GWh20.9 mi
Butte College Main Campus SolarOroville, CA6.3 GWh19.1 mi
Edward C HyattOroville, CA2.0 TWh15.5 mi
Feather River Energy CenterYuba City, CA45.7 GWh18.6 mi
ForbestownForbestown, CA128.5 GWh24.7 mi
G2 Energy Ostrom Road LLCWheatland, CA29.0 GWh25.7 mi
Greenleaf 1Yuba City, CA4.1 GWh22.2 mi
Greenleaf 2 Power PlantYuba City, CA36.8 GWh16.5 mi
Gridley MainGridley, CA1.6 GWh0.1 mi
Kelly RidgeOroville, CA66.5 GWh14.9 mi
Narrows 2Browns Valley, CA156.8 GWh23.9 mi
Narrows PHGrass Valley, CA80.8 GWh23.9 mi
Oroville Cogeneration LPOroville, CA672.3 MWh10.4 mi
Sierra Nevada Brewing Co HybridChico, CA9.6 GWh25.3 mi
Sutter Energy CenterYuba City, CA1.8 TWh22.1 mi
ThermalitoOroville, CA322.3 GWh10.2 mi
Thermalito Diverson DamOroville, CA19.2 GWh12.9 mi
Yuba City Cogen PartnersYuba City, CA22.9 GWh16.5 mi
Yuba City Energy CenterYuba City, CA39.1 GWh16.3 mi