JD Foods - JD Foods

2704 S Maple Ave, Fresno, CA 93725

Plant Summary Information

JD Foods - JD Foods is ranked #660 out of 885 solar farms in California in terms of total annual net electricity generation.

JD Foods - JD Foods generated 464.0 MWh during the 3-month period between September 2025 to December 2025.

Plant NameJD Foods - JD Foods
Utility NameBarrier Solar Inc
LocationFresno County, CA
Initial Operation DateOctober 2020
Last Update Dec 2025
Annual Generation 2.5 GWh
Annual Consumption 8.8 k MMBtu
Ranked #10,357 out of 13,081 Power Plants Nationwide
Ranked #5,283 out of 7,015 Solar Power Plants Nationwide
Ranked #1,331 out of 1,606 California Power Plants
Ranked #660 out of 885 California Solar Power Plants
Fuel Types Solar

Map of JD Foods - JD Foods

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for JD Foods - JD Foods.

Create Your Account Today

Monthly Net Generation for JD Foods - JD Foods

Monthly Plant Fuel Consumption for JD Foods - JD Foods

JD Foods - JD Foods Details

Summary Information
Plant NameJD Foods - JD Foods (68521)
Plant Address2704 S Maple Ave, Fresno, CA 93725
UtilityBarrier Solar Inc (66897)
Latitude, Longitude36.70185, -119.74588
Generation Dates on FileOct 2024 to Dec 2025
Initial Operation DateOctober 2020
Annual Generation 2.5 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeTruck Transportation (484)
Sector Commercial Non-CHP (4)
Water SourceNA
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 480.00 kV
Energy StorageNo

Generator JDF Details Operating October 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity1.5 MW
Nameplate Power Factor0.99
Summer Capacity1.5 MW
Winter Capacity1.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2020
Combined Heat & Power No
Sector NameCommercial Non-CHP (4)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity1.9 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.9 MW
Virtual Net Metering AgreementNo

JD Foods - JD Foods Plant Owners

Owner NameAddressOwnership
J&D Food Service2704 S Maple Ave, Fresno, CA 93725100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5273Lafayette 2 - McHenry Franks 2Huntley, IL2.5 GWh
#5274Liberty HS Solar ProjectBakersfield, CA2.5 GWh
#5275Westborough Solar LLCWestborough, MA2.5 GWh
#5276General Electric Aircraft EnginesLynn, MA2.5 GWh
#5277Axio Green LLCGreenfield Township, MA2.5 GWh
#5278Manheim New EnglandNorth Dighton, MA2.5 GWh
#5279Middlesex Vo Tech Solar 1 LLCPiscataway, NJ2.5 GWh
#5280Butler PlazaGainesville, FL2.5 GWh
#5281Dynamic Energy CT STAGMilford, CT2.5 GWh
#5282FedEx HagerstownHagerstown, MD2.5 GWh
#5284Oak Leaf - CSG Portfolio (OL 37)Watkins, CO2.5 GWh
#5285201 Sturbridge BBrimfield, MA2.5 GWh
#5286Anheuser-Busch BaldwinsvilleBaldwinsville, NY2.5 GWh
#5287SCE-Snowline-Duncan Road (South)Phelan, CA2.5 GWh
#5288WMATA - S. Ave. Carport (East) (CSG)Hillcrest Heights, MD2.5 GWh
#5289Timmerman (CSG)Balaton, MN2.5 GWh
#5290Onondaga County - Oak Orchard WWTPClay, NY2.5 GWh
#5291Gowans (CSG)Angola, NY2.4 GWh
#5292Elkton SolarElkton, MD2.4 GWh
#5293OR -Solops - SPI 18 - CorkMolalla, OR2.4 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding JD Foods - JD Foods.

Plant NamePlant LocationAnnual GenerationDistance
Algonquin Power Sanger LLCSanger, CA3.6 GWh10.8 mi
CA - Fresno County - Juvenile HallFresno, CA552.0 MWh3 mi
Clovis East High SchoolClovis, CA1.3 GWh8.9 mi
Clovis High SchoolClovis, CA1.6 GWh8.7 mi
Clovis North High SchoolFresno, CA1.5 GWh13 mi
CSU Fresno Solar ProjectFresno, CA1.3 GWh7.5 mi
Fresno Bullard High School HybridFresno, CA2.1 GWh8.8 mi
Fresno Community SolarFresno, CA16.9 GWh7.7 mi
Fresno Hoover High School HybridFresno, CA2.0 GWh8.1 mi
Fresno Sunnyside High School HybridFresno, CA2.5 GWh2.7 mi
Gap Pacific Distribution CenterFresno, CA5.4 GWh5.9 mi
La Joya Del SolFresno, CA806.0 MWh3.3 mi
Malaga Power LLCFresno, CA4.2 GWh0.9 mi
National RaisinFowler, CA4.6 GWh6.7 mi
OK Produce Fresno CarportFresno, CA3.3 GWh2.2 mi
POM Plant 1Del Rey, CA5.1 GWh9.4 mi
POM Plant 2Del Rey, CA3.4 GWh9.1 mi
Saint Agnes Medical CenterFresno, CA32.0 GWh9.3 mi
SCCCD - Clovis Community CollegeFresno, CA2.0 GWh12.7 mi
SCCCD - Fresno Community CollegeFresno, CA2.8 GWh5.3 mi