NextEra Westside PV

24090 South Lake Ave, Five Points, CA 93624

Plant Summary Information

NextEra Westside PV is ranked #259 out of 886 solar farms in California in terms of total annual net electricity generation.

NextEra Westside PV generated 4.9 GWh during the 3-month period between September 2025 to December 2025.

Plant NameNextEra Westside PV
Utility NameWestside Solar, LLC
LocationFresno County, CA
Initial Operation DateMarch 2017
Last Update Dec 2025
Annual Generation 25.7 GWh
Annual Consumption 94.3 k MMBtu
Ranked #5,079 out of 13,094 Power Plants Nationwide
Ranked #1,477 out of 7,027 Solar Power Plants Nationwide
Ranked #633 out of 1,607 California Power Plants
Ranked #259 out of 886 California Solar Power Plants
Fuel Types Solar

Map of NextEra Westside PV

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NextEra Westside PV.

Create Your Account Today

Monthly Net Generation for NextEra Westside PV

Monthly Plant Fuel Consumption for NextEra Westside PV

NextEra Westside PV Details

Summary Information
Plant NameNextEra Westside PV (60981)
Plant Address24090 South Lake Ave, Five Points, CA 93624
UtilityWestside Solar, LLC (60614)
Latitude, Longitude36.38178, -120.13449
Generation Dates on FileMar 2017 to Dec 2025
Initial Operation DateMarch 2017
Annual Generation 25.7 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 70.00 kV
Energy StorageNo

Generator WS526 Details Operating March 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity20 MW
Summer Capacity20 MW
Winter Capacity20 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
DC Net Capacity27 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

NextEra Westside PV Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#1467Heartwood SolarAllen, MI26.2 GWh
#1468SunE EPE1 LLCChaparral, NM26.2 GWh
#1469Camilla Solar PlantPelham, GA26.1 GWh
#1470Selmer Farm LLCSelmer, TN25.8 GWh
#1471Alkali Solar, LLCSilver Lake, OR25.8 GWh
#1472Mocksville SolarMocksville, NC25.8 GWh
#1473Cumblerland Land Holdings, LLCElkmont, AL25.8 GWh
#1474Coolidge Solar 1, LLCLudlow, VT25.7 GWh
#1475Latitude Solar CenterWhiteville, TN25.7 GWh
#1476Scott Solar FarmPowhatan, VA24.7 GWh
#1478Corpus RefineryCorpus Christi, TX271.3 GWh
#1479Fort Martin SolarMaidsville, WV25.4 GWh
#1480Delta Solar Power IIGrand Ledge, MI25.3 GWh
#1481Patua Acquisition Project, LLCHazen, NV103.3 GWh
#1482Mulberry Farm LLCSelmer, TN25.2 GWh
#1483Energix Hollyfield, LLCManquin, VA25.2 GWh
#1484Williamston Speight Solar, LLCWilliamston, NC25.2 GWh
#1485Pasto SolarSpencer, NY25.1 GWh
#1486Sylvan SolarPillager, MN25.1 GWh
#1487SR CamdenCamden, AR25.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding NextEra Westside PV.

Plant NamePlant LocationAnnual GenerationDistance
Cantua Solar StationTBD, CA23.0 GWh12 mi
Fifth Standard Solar PV, LLC (Hybrid)Huron, CA341.5 GWh15.9 mi
Five Points Solar ParkFive Points, CA80.7 GWh5.7 mi
Five Points Solar StationFive Points, CA12.6 GWh2.2 mi
Fresno Cogen PartnersSan Joaquin, CA840.0 MWh16.4 mi
Fresno SolarSan Joaquin, CA5.4 GWh16.3 mi
Gates Solar StationHuron, CA30.5 GWh14.2 mi
GiffenTBD, CA11.6 GWh14.4 mi
Giffen Solar ParkCantua Creek, CA19.6 GWh15.1 mi
Harris Farms Solar FacilityCoalinga, CA3.2 GWh10.3 mi
Henrietta PeakerLemoore, CA4.3 GWh16.1 mi
Huron Solar StationHuron, CA28.1 GWh15 mi
Open Sky DairyRiverdale, CA418.8 MWh7.9 mi
Open Sky Ranch IncRiverdale, CA4.0 GWh7.9 mi
San Joaquin SolarSan Joaquin, CA22.4 GWh10.1 mi
Stroud Solar StationHelm, CA14.9 GWh10.4 mi
Superior Almond HullingCantua Creek, CA472.0 MWh14.7 mi
Van der Kooi Dairy Solar ArrayRiverdale, CA3.7 GWh8.8 mi
Westside Solar StationFive Points, CA12.0 GWh0.6 mi
Whitney Point SolarFive Points, CA54.2 GWh0.4 mi