Whitney Point Solar
24372 South Lake Ave, Five Points, CA 93624Plant Summary Information
Whitney Point Solar is ranked #160 out of 885 solar farms in California in terms of total annual net electricity generation.
Whitney Point Solar generated 7.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Whitney Point Solar |
|---|---|
| Utility Name | Whitney Point Solar, LLC |
| Location | Fresno County, CA |
| Initial Operation Date | March 2017 |
| Last Update | Dec 2025 |
| Annual Generation | 54.2 GWh |
| Annual Consumption | 192.4 k MMBtu |
| Ranked #4,107 out of 13,081 Power Plants Nationwide | |
| Ranked #1,088 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #439 out of 1,606 California Power Plants | |
| Ranked #160 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Whitney Point Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Whitney Point Solar.
Monthly Net Generation for Whitney Point Solar
Monthly Plant Fuel Consumption for Whitney Point Solar
Whitney Point Solar Details
| Summary Information | |
|---|---|
| Plant Name | Whitney Point Solar (60975) |
| Plant Address | 24372 South Lake Ave, Five Points, CA 93624 |
| Utility | Whitney Point Solar, LLC (60619) |
| Latitude, Longitude | 36.37689, -120.13847 |
| Generation Dates on File | Mar 2017 to Dec 2025 |
| Initial Operation Date | March 2017 |
| Annual Generation | 54.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 70.00 kV |
| Energy Storage | No |
Generator WS532 Details Operating March 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2017 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 28.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Whitney Point Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1078 | Catalina Solar 2, LLC | Rosamond, CA | 55.4 GWh |
| #1079 | Apache Solar I | Cochise, AZ | 55.4 GWh |
| #1080 | Baxley | Baxley, GA | 55.2 GWh |
| #1081 | Kingbird B Solar, LLC | Rosamond, CA | 55.2 GWh |
| #1082 | Antelope DSR 3 | Lancaster, CA | 55.1 GWh |
| #1083 | Fort Benning Solar Facility | Fort Mitchell, AL | 55.0 GWh |
| #1084 | Marine Corps Logistics Base Solar | Albany, GA | 55.0 GWh |
| #1085 | Techren Solar IV LLC | Boulder, NV | 55.0 GWh |
| #1086 | Sunray 2 | Daggett, CA | 54.6 GWh |
| #1087 | Longboat Solar, LLC | Barstow, CA | 54.3 GWh |
| #1089 | English Creek Solar | Plant City, FL | 53.3 GWh |
| #1090 | Seville 1 | Ocotillo Wells, CA | 53.3 GWh |
| #1091 | EE Waianae Solar Project | Waianae, HI | 53.2 GWh |
| #1092 | Axium Modesto Solar | Modesto, CA | 53.2 GWh |
| #1093 | Techren Solar III LLC | Boulder, NV | 53.2 GWh |
| #1094 | Lone Valley Solar Park II LLC | Lucerne Valley, CA | 53.1 GWh |
| #1095 | East Nash PV2 | Spring Hope, NC | 53.0 GWh |
| #1096 | Barilla Solar | Fort Stockton, TX | 52.9 GWh |
| #1097 | Innovative Solar 31 | Bladenboro, NC | 52.9 GWh |
| #1098 | Solar Oasis LLC | Palmdale, CA | 52.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Whitney Point Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| American Kings Solar, LLC | Lemoore, CA | 287.6 GWh | 16.4 mi |
| Cantua Solar Station | TBD, CA | 23.0 GWh | 11.9 mi |
| Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 338.5 GWh | 15.6 mi |
| Five Points Solar Park | Five Points, CA | 80.7 GWh | 5.5 mi |
| Five Points Solar Station | Five Points, CA | 12.6 GWh | 2.5 mi |
| Gates Solar Station | Huron, CA | 30.5 GWh | 13.9 mi |
| Giffen | TBD, CA | 11.6 GWh | 14.5 mi |
| Giffen Solar Park | Cantua Creek, CA | 19.6 GWh | 15.2 mi |
| Harris Farms Solar Facility | Coalinga, CA | 3.2 GWh | 9.9 mi |
| Henrietta Peaker | Lemoore, CA | 3.3 GWh | 16.1 mi |
| Huron Solar Station | Huron, CA | 28.1 GWh | 14.8 mi |
| NextEra Westside PV | Five Points, CA | 25.7 GWh | 0.4 mi |
| Open Sky Dairy | Riverdale, CA | 418.8 MWh | 8.3 mi |
| Open Sky Ranch Inc | Riverdale, CA | 4.0 GWh | 8.3 mi |
| San Joaquin Solar | San Joaquin, CA | 22.4 GWh | 10.4 mi |
| Stroud Solar Station | Helm, CA | 14.9 GWh | 10.8 mi |
| Superior Almond Hulling | Cantua Creek, CA | 472.0 MWh | 14.6 mi |
| Van der Kooi Dairy Solar Array | Riverdale, CA | 3.7 GWh | 8.7 mi |
| West Gates Solar Station | Huron, CA | 14.1 GWh | 16.2 mi |
| Westside Solar Station | Five Points, CA | 12.0 GWh | 0.8 mi |