AT&T Holger
400 Holger Way, San Jose, CA 95134Plant Summary Information
AT&T Holger is ranked #297 out of 317 natural gas power plants in California in terms of total annual net electricity generation.
AT&T Holger is comprised of 1 generator and generated 223.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | AT&T Holger |
|---|---|
| Utility Name | Bloom Energy |
| Location | Santa Clara County, CA |
| Initial Operation Date | June 2016 |
| Last Update | Dec 2025 |
| Annual Generation | 1.1 GWh |
| Annual Consumption | 8.4 k MMBtu |
| Ranked #12,111 out of 13,301 Power Plants Nationwide | |
| Ranked #1,859 out of 2,218 Natural Gas Power Plants Nationwide | |
| Ranked #1,554 out of 1,641 California Power Plants | |
| Ranked #297 out of 317 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of AT&T Holger
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for AT&T Holger.
Monthly Net Generation for AT&T Holger
Monthly Plant Fuel Consumption for AT&T Holger
AT&T Holger Details
| Summary Information | |
|---|---|
| Plant Name | AT&T Holger (61153) |
| Plant Address | 400 Holger Way, San Jose, CA 95134 |
| Utility | Bloom Energy (57128) |
| Latitude, Longitude | 37.41764, -121.94453 |
| Generation Dates on File | Jun 2016 to Dec 2025 |
| Initial Operation Date | June 2016 |
| Annual Generation | 1.1 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 21.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | PACIFIC GAS |
| Natural Gas Storage | No |
Generator AT057 Details Operating June 2016
| Technology | Other Natural Gas |
|---|---|
| Prime Mover | Fuel Cell |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1.3 MW |
| Summer Capacity | 1.3 MW |
| Winter Capacity | 1.3 MW |
| Minimum Load | 1.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | OVER |
AT&T Holger Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| KeyBank | 127 Public Square, Cleveland, OH 44114 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1849 | Marshall (MO) | Marshall, MO | 1.3 GWh |
| #1850 | Hamilton (OH) | Hamilton, OH | 1.2 GWh |
| #1851 | Seadrift Coke LP | Port Lavaca, TX | 35.5 GWh |
| #1852 | One Market Plaza | San Francisco, CA | 1.2 GWh |
| #1853 | Bay Front | Ashland, WI | 176.9 GWh |
| #1854 | Sturgis City Diesel Plant | Sturgis, MI | 1.3 GWh |
| #1855 | Bridgewater Complex Co-Generation Plant | Bridgewater, MA | 1.2 GWh |
| #1856 | Sheldon | Hallam, NE | 763.0 GWh |
| #1857 | McClure | Modesto, CA | 1.6 GWh |
| #1858 | Pinellas County Resource Recovery | St. Petersburg, FL | 154.3 GWh |
| #1860 | NE Renewable Fitchburg, LLC | Westminster, MA | 78.7 GWh |
| #1861 | Gas Turbine (IA) | Cedar Falls, IA | 1.1 GWh |
| #1862 | Mira Loma Peaker | Ontario, CA | 1.1 GWh |
| #1863 | Palm Beach Renewable Energy Facility 1 | West Palm Beach, FL | 345.6 GWh |
| #1864 | New Prague | New Prague, MN | 1.3 GWh |
| #1865 | Bryan (TX) | Bryan, TX | 1.0 GWh |
| #1866 | North Loop | Tucson, AZ | 1.0 GWh |
| #1867 | Temple SEGF | Philadelphia, PA | 981.0 MWh |
| #1868 | North Ninth Street | Rochelle, IL | 1.3 GWh |
| #1869 | Kingman Municipal Power and Light Plant | Kingman, KS | 1.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding AT&T Holger.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agnews Power Plant | San Jose, CA | 8.6 GWh | 1.3 mi |
| CST001 McCarthy Fuel Cell | Milpitas, CA | 9.0 GWh | 1.7 mi |
| Donald Von Raesfeld Power Plant | Santa Clara, CA | 929.6 GWh | 2.8 mi |
| Equinix Lundy Ave. Fuel Cell | San Jose, CA | 30.7 GWh | 3.7 mi |
| EQX011 Duane Fuel Cell | Santa Clara, CA | 31.2 GWh | 2.8 mi |
| FLEX Gibraltar | Milpitas, CA | 8.4 GWh | 2.8 mi |
| Fremont - Kato Rd | Fremont, CA | 2.3 GWh | 4.3 mi |
| Gianera | Santa Clara, CA | 15.1 GWh | 1.8 mi |
| Google Moffett Park Solar Project | Sunnyvale, CA | 2.5 GWh | 4.1 mi |
| Intel Santa Clara | Santa Clara, CA | 6.9 GWh | 2.5 mi |
| JSR000 N Mathilda Fuel Cell | Sunnyvale, CA | 8.8 GWh | 4.4 mi |
| Los Esteros Critical Energy Center | San Jose, CA | 161.2 GWh | 0.9 mi |
| Maxim | San Jose, CA | 6.9 GWh | 0.9 mi |
| Micro Santa Clara | San Jose, CA | 24.8 GWh | 3.7 mi |
| Mission College Blvd. Fuel Cell | Santa Clara, CA | 36.3 GWh | 2.4 mi |
| SC 1 Data Center, Phase 2 | Santa Clara, CA | 129.0 MWh | 3.9 mi |
| SJ/SC WPCP | San Jose, CA | 75.0 GWh | 1.2 mi |
| Sunnyvale City of WPCP | Sunnyvale, CA | 7.5 GWh | 3.9 mi |
| Verizon Comms Garage Top Solar Project | San Jose, CA | 348.0 MWh | 4.4 mi |
| Zero Waste Energy Development Co LLC | San Jose, CA | 224.0 MWh | 1.1 mi |