RE Gaskell West 3 LLC
23555 Gaskell Road, Rosamond, CA 93560Plant Summary Information
RE Gaskell West 3 LLC is ranked #176 out of 885 solar farms in California in terms of total annual net electricity generation.
RE Gaskell West 3 LLC generated 10.6 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | RE Gaskell West 3 LLC |
|---|---|
| Utility Name | RE Gaskell West LLC |
| Location | Kern County, CA |
| Initial Operation Date | May 2023 |
| Last Update | Dec 2025 |
| Annual Generation | 50.8 GWh |
| Annual Consumption | 182.5 k MMBtu |
| Ranked #4,188 out of 13,081 Power Plants Nationwide | |
| Ranked #1,113 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #460 out of 1,606 California Power Plants | |
| Ranked #176 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of RE Gaskell West 3 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Gaskell West 3 LLC.
Monthly Net Generation for RE Gaskell West 3 LLC
Monthly Plant Fuel Consumption for RE Gaskell West 3 LLC
RE Gaskell West 3 LLC Details
| Summary Information | |
|---|---|
| Plant Name | RE Gaskell West 3 LLC (61447) |
| Plant Address | 23555 Gaskell Road, Rosamond, CA 93560 |
| Utility | RE Gaskell West LLC (61069) |
| Latitude, Longitude | 34.83494, -118.55118 |
| Generation Dates on File | Mar 2023 to Dec 2025 |
| Initial Operation Date | May 2023 |
| Annual Generation | 50.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator PV3 Details Operating May 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 27 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
RE Gaskell West 3 LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1103 | Innovative Solar 47 | Maxton, NC | 52.2 GWh |
| #1104 | Rio Bravo Solar 1 LLC | McKittrick, CA | 52.1 GWh |
| #1105 | Mountain View Solar | North Las Vegas, NV | 52.1 GWh |
| #1106 | Atwell Island West Solar | Alpaugh, CA | 51.9 GWh |
| #1107 | CED Ducor 4 | Ducor, CA | 51.8 GWh |
| #1108 | Rio Bravo Solar II LLC | McKittrick, CA | 51.7 GWh |
| #1109 | CED Ducor 2 | Ducor, CA | 51.6 GWh |
| #1110 | Fort Gordon Solar Facility | Fort Gordon, GA | 51.4 GWh |
| #1111 | Cascade Solar | Joshua Tree, CA | 51.4 GWh |
| #1112 | RE Rosamond One LLC | Rosamond, CA | 51.2 GWh |
| #1114 | Pumpjack Solar I | McKittrick, CA | 50.6 GWh |
| #1115 | RE Kansas South LLC | Lemoore, CA | 50.5 GWh |
| #1116 | Maricopa West Solar PV, LLC | Taft, CA | 50.3 GWh |
| #1117 | Simon Solar Farm LLC | Social Circle, GA | 50.2 GWh |
| #1118 | Marion County Solar Project | Marion, OH | 50.2 GWh |
| #1119 | Dover Solar and Battery Storage | Dover, FL | 49.2 GWh |
| #1120 | Paulsell | Crows Landing, CA | 47.5 GWh |
| #1121 | Antelope Big Sky Ranch | Lancaster, CA | 49.9 GWh |
| #1122 | Midpoint Solar, LLC | Blum, TX | 49.6 GWh |
| #1123 | St. James Solar (LA) | Vacherie, LA | 49.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Gaskell West 3 LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alamo | Pearblossom, CA | 65.7 GWh | 7.8 mi |
| Alpine Solar | Lancaster, CA | 114.1 GWh | 4.1 mi |
| AV Solar Ranch One | Lancaster, CA | 560.0 GWh | 8.1 mi |
| Camino Solar Hybrid | Rosamond, CA | 133.1 GWh | 9 mi |
| Gaskell West 1 Solar Facility | Lancaster, CA | 55.6 GWh | 0.7 mi |
| Golden Field Solar III, LLC | Rosamond, CA | 537.5 GWh | 8.9 mi |
| Golden Fields Solar I, LLC | Rosamond, CA | 140.1 GWh | 9.3 mi |
| Kingbird A Solar LLC | Rosamond, CA | 38.2 GWh | 6.8 mi |
| Kingbird B Solar, LLC | Rosamond, CA | 55.2 GWh | 6.4 mi |
| Manzana Wind LLC | Rosamond, CA | 519.3 GWh | 8.6 mi |
| Pacific Wind LLC | Rosamond, CA | 294.7 GWh | 7.8 mi |
| RE Astoria | Rosamond, CA | 187.0 GWh | 5.3 mi |
| RE Astoria 2 | Rosamond, CA | 177.2 GWh | 4 mi |
| RE Garland | Rosamond, CA | 509.7 GWh | 1.6 mi |
| RE Garland A | Rosamond, CA | 56.7 GWh | 3.2 mi |
| RE Gaskell West 2 LLC | Rosamond, CA | 123.9 GWh | 0 mi |
| RE Gaskell West 4 LLC | Rosamond, CA | 47.5 GWh | 1.1 mi |
| RE Gaskell West 5 LLC | Rosamond, CA | 48.0 GWh | 0 mi |
| Solar Star 1 | Rosamond, CA | 886.6 GWh | 8.5 mi |
| Solar Star California, XLI, LLC | Rosamond, CA | 139.1 GWh | 9.3 mi |