Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Kiefer Landfill Generating Phase II | NextEra Renewable Fuels, LLC | Sloughhouse, CA | Balancing Authority of Northern California (BANC) | 30.2 GWh | Mar 2012 | Dec 2025 | Landfill Gas |
| Lakeside Pipeline | Maas Energy Works | Hanford, CA | California Independent System Operator (CISO) | 8.3 GWh | Jun 2023 | Dec 2025 | Solar |
| Pacific Aviation | Onyx Asset Services Group | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 2.9 GWh | Mar 2025 | Dec 2025 | Solar |
| Legoland CA Phase I | Onyx Asset Services Group | Carlsbad, CA | California Independent System Operator (CISO) | 1.4 GWh | May 2025 | Dec 2025 | Solar |
| Amazon - SAN5 | Onyx Asset Services Group | San Diego, CA | California Independent System Operator (CISO) | 530.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Las Positas College | Chabot Las Positas Community College District | Livermore, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2018 | Dec 2025 | Solar |
| Palm Springs DAC PV | Palm Springs USD | Palm Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2021 | Dec 2025 | Solar |
| CFF Rice Mill Solar Plant | California Family Foods | Arbuckle, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 145.0 MWh | Nov 2025 | Dec 2025 | Solar |
| CA- US Foods- Sacramento (McClellan) | USF McClellan, LLC | McClellan, CA | Balancing Authority of Northern California (BANC) | 1.4 GWh | Mar 2025 | Dec 2025 | Solar |
| PAC Aviation Solar | PAC Aviation | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Nov 2024 | Dec 2025 | Solar |
| KP Ontario Vineyard Solar | KP Ontario Vineyard O.P. Surgicenter B Solar LLC | Ontario, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Amazon Visalia (FAT2) | Madison Energy Investments LLC | Visalia, CA | California Independent System Operator (CISO) | 3.7 GWh | Feb 2023 | Dec 2025 | Solar |
| Sutter Home Winery Westside | REC SHW, LLC | Lodi, CA | California Independent System Operator (CISO) | 295.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Thermo Fisher Pleasanton | TotalEnergies Renewables USA LLC | Pleasanton, CA | California Independent System Operator (CISO) | 1.5 GWh | Jun 2025 | Dec 2025 | Solar |
| KP South Sacramento Hospital Solar | KP South Sacramento Hospital Solar, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 2.6 GWh | Jul 2023 | Dec 2025 | Solar |
| Sun Pacific - Lerdo | JKB Energy | Shafter, CA | California Independent System Operator (CISO) | 6.0 GWh | Sep 2020 | Dec 2025 | Solar |
| AVI Bakersfield | Anthony Vineyards, Inc. | Bakersfield, CA | California Independent System Operator (CISO) | 2.8 GWh | May 2022 | Dec 2025 | Solar |
| Sutter Santa Rosa Solar | Sutter Santa Rosa Solar LLC | Santa Rosa, CA | California Independent System Operator (CISO) | 2.1 GWh | Aug 2019 | Dec 2025 | Solar |
| Open Sky Ranch Inc | Bravo REC Management LLC | Riverdale, CA | California Independent System Operator (CISO) | 4.0 GWh | Jun 2024 | Dec 2025 | Solar |
| JD Foods - JD Foods | Barrier Solar Inc | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2020 | Dec 2025 | Solar |
| Wonderful Orchards - West Valley | Wonderful Renewable Energy, LLC. | Blackwells Corner, CA | California Independent System Operator (CISO) | 8.0 GWh | Sep 2020 | Dec 2025 | Solar |
| Harris Farms Solar Facility | Harris Farms Inc | Coalinga, CA | California Independent System Operator (CISO) | 3.2 GWh | Feb 2024 | Dec 2025 | Solar |
| Paso Robles - Municipal Airport | Onyx Asset Services Group | Paso Robles, CA | California Independent System Operator (CISO) | 7.6 GWh | Dec 2023 | Dec 2025 | Solar |
| TWC | Bravo REC Management LLC | Tulare, CA | California Independent System Operator (CISO) | 2.2 GWh | Jul 2024 | Dec 2025 | Solar |
| Foster Clean Power B | Foster Clean Power B LLC | Arcata, CA | California Independent System Operator (CISO) | 901.0 MWh | Aug 2025 | Dec 2025 | Solar |
| Delta Electronics Fremont | Delta Electronics (Americas) Ltd | Fremont, CA | California Independent System Operator (CISO) | 701.0 MWh | Mar 2016 | Dec 2025 | Solar |
| Dixie Creek Dairy Solar | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 5.8 GWh | Jun 2024 | Dec 2025 | Solar |
| City of Atwater NEM | SoCore Energy LLC | Atwater, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2024 | Dec 2025 | Solar |
| City of Long Beach Airport Lot A & B | Solar DG CA Long Beach, LLC | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Jan 2024 | Dec 2025 | Solar |
| Kern Sunset 1886-WD | Standard Solar | Bakersfield, CA | California Independent System Operator (CISO) | 4.5 GWh | Oct 2024 | Dec 2025 | Solar |
| Terry 1818-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Nachtigall 1836-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Highway 43 1887-WD | Standard Solar | Shafter, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Rio Vista Solar | Rio Vista Executive Boat & RV Storage, LLC | Rio Vista, CA | California Independent System Operator (CISO) | 3.1 GWh | Mar 2025 | Dec 2025 | Solar |
| River Ranch Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 995.0 MWh | May 2024 | Dec 2025 | Solar |
| Zonneveld Oak Grove | Renewable Solar, Inc | Laton, CA | California Independent System Operator (CISO) | 388.0 MWh | May 2024 | Dec 2025 | Solar |
| RB Inyokern Solar WDAT 1281 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 34.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Government Plaza Solar | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.8 GWh | Oct 2020 | Dec 2025 | Solar |
| Open Sky Dairy | Renewable Solar, Inc | Riverdale, CA | California Independent System Operator (CISO) | 418.8 MWh | Jun 2024 | Dec 2025 | Solar |
| RB Inyokern Solar WDAT 1203 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 58.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Wheeler Ridge 2 | Madison Energy Investments LLC | Arvin, CA | California Independent System Operator (CISO) | 13.8 GWh | Oct 2023 | Dec 2025 | Solar |
| CA OXNARD 2600 Sakioka Dr | Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC | Oxnard, CA | California Independent System Operator (CISO) | 2.7 GWh | Jun 2025 | Dec 2025 | Solar |
| Civic Center East | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2020 | Dec 2025 | Solar |
| Bob Wiley Detention Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2020 | Dec 2025 | Solar |
| Tulare Akers Professional Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2019 | Dec 2025 | Solar |
| Hollister Wastewater Facility | SunStrong Management, LLC | Hollister, CA | California Independent System Operator (CISO) | 1.7 GWh | Oct 2011 | Dec 2025 | Solar |
| North Juvenile Detention Center Solar | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2019 | Dec 2025 | Solar |
| South County Detention Center Solar | SoCore Energy LLC | Porterville, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2019 | Dec 2025 | Solar |
| North Kern 1 | Madison Energy Investments LLC | Shafter, CA | California Independent System Operator (CISO) | 6.9 GWh | May 2023 | Dec 2025 | Solar |
| North Kern 2 | Madison Energy Investments LLC | City of Shafter, CA | California Independent System Operator (CISO) | 6.1 GWh | Jun 2024 | Dec 2025 | Solar |
| Mountain View Ind Park 1-sline001 | Prologis Logistics Services Incorporated | Fontana, CA | California Independent System Operator (CISO) | 371.0 MWh | Aug 2023 | Dec 2025 | Solar |
| Allied Potato | Renewable Solar, Inc | Bakersfield, CA | California Independent System Operator (CISO) | 309.9 MWh | Apr 2025 | Dec 2025 | Solar |
| CA- US Foods- Livermore | EDPRNA DG CA Livermore LLC | Livermore, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2024 | Dec 2025 | Solar |
| Lemoore West | Leprino Foods | Lemoore, CA | California Independent System Operator (CISO) | 16.7 GWh | Nov 2022 | Dec 2025 | Solar |
| Spaulding 2 | Pacific Gas & Electric Co. | Emigrant Gap, CA | California Independent System Operator (CISO) | 21.0 MWh | Jun 1928 | Nov 2025 | Water |
| Fontana | Southern California Edison Co | Rialto, CA | California Independent System Operator (CISO) | 1.9 GWh | Nov 1917 | Nov 2025 | Water |
| Yorba Linda | Metropolitan Water District of S CA | Yorba Linda, CA | California Independent System Operator (CISO) | 9.4 GWh | Oct 1981 | Nov 2025 | Water |
| Rio Bravo Hydro Project | Olcese Water District | Bakersfield, CA | California Independent System Operator (CISO) | 27.0 GWh | Apr 1989 | Nov 2025 | Water |
| Equilon Los Angeles Refining | Tesoro Refining and Marketing Company | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 239.9 GWh | Nov 1982 | Nov 2025 | Other Gas : 97.9% Natural Gas : 2.1% |
| Harbor Cogen | Harbor Cogeneration Co. | Wilmington, CA | California Independent System Operator (CISO) | 9.3 GWh | Nov 1988 | Nov 2025 | Natural Gas |
| Los Angeles Refinery Wilmington | Phillips 66 - Los Angeles | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 365.4 GWh | Apr 1984 | Nov 2025 | Other Gas : 58.4% Natural Gas : 41.6% |
| SunEdison Walmart Apple Valley DC | SunE M5 Holdings LLC | Apple Valley, CA | California Independent System Operator (CISO) | 715.0 MWh | Feb 2009 | Nov 2025 | Solar |
| Catalina Solar LLC | EDF Renewable Asset Holdings, Inc. | Rosamond, CA | California Independent System Operator (CISO) | 264.9 GWh | Nov 2012 | Nov 2025 | Solar |
| Bear Creek Solar (Lodi) | Ecos Energy LLC | Lodi, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2014 | Nov 2025 | Solar |
| Kettering Solar 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.6 GWh | May 2014 | Nov 2025 | Solar |
| Kettering Solar 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 1.5 GWh | May 2014 | Nov 2025 | Solar |
| Berrenda Mesa Water District | The Greater Light USA LLC | Lost Hills, CA | California Independent System Operator (CISO) | 14.8 GWh | Jun 2023 | Nov 2025 | Solar |
| Bakersfield Industrial PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2017 | Oct 2025 | Solar |
| SCV Water - Gladbach Water Treatment Plant Phases I and II | SCV Water | Santa Clara, CA | California Independent System Operator (CISO) | 858.0 MWh | Nov 2014 | Oct 2025 | Solar |
| A G Wishon | Pacific Gas & Electric Co. | North Fork, CA | California Independent System Operator (CISO) | 24.1 GWh | Aug 1910 | Oct 2025 | Water |
| AES Alamitos LLC | AES Alamitos LLC | Long Beach, CA | California Independent System Operator (CISO) | 28.2 GWh | Aug 1956 | Oct 2025 | Natural Gas |
| Big Pine Creek | Los Angeles Department of Water & Power | Big Pine, CA | Los Angeles Department of Water and Power (LDWP) | 10.5 GWh | Jun 1925 | Oct 2025 | Water |
| McSwain | Merced Irrigation District | Snelling, CA | California Independent System Operator (CISO) | 26.9 GWh | Jun 1967 | Oct 2025 | Water |
| Colgate | Yuba County Water Agency - (CA) | Dobbins, CA | California Independent System Operator (CISO) | 1.3 TWh | Sep 1969 | Oct 2025 | Water |
| Toadtown | Pacific Gas & Electric Co. | Magalia, CA | California Independent System Operator (CISO) | 1.8 GWh | Mar 1986 | Oct 2025 | Water |
| Scott Flat | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 3.8 GWh | Jan 1985 | Oct 2025 | Water |
| Lake Mathews | Metropolitan Water District of S CA | Riverside, CA | California Independent System Operator (CISO) | 5.8 GWh | Jul 1980 | Oct 2025 | Water |
| Diamond Valley Lake | Metropolitan Water District of S CA | Winchester, CA | California Independent System Operator (CISO) | 1.3 GWh | Apr 2001 | Oct 2025 | Water |
| Metro Support Services Center Solar | Los Angeles County Metropolitan Transportation Authority | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 25.0 MWh | Mar 2005 | Oct 2025 | Solar |
| Vasco Winds | Vasco Winds, LLC | Livermore, CA | California Independent System Operator (CISO) | 233.7 GWh | Nov 2011 | Oct 2025 | Wind |
| Castle Rock Vineyards | Castle Rock Cooling | Delano, CA | California Independent System Operator (CISO) | 1.8 GWh | Aug 2010 | Oct 2025 | Solar |
| Merced Falls | Merced Irrigation District | Snelling, CA | California Independent System Operator (CISO) | 9.1 GWh | Jun 1930 | Sep 2025 | Water |
| Haiwee | Los Angeles Department of Water & Power | Olancha, CA | Los Angeles Department of Water and Power (LDWP) | 11.0 GWh | Jun 1927 | Sep 2025 | Water |
| Pleasant Valley Hydro | Los Angeles Department of Water & Power | Bishop, CA | Los Angeles Department of Water and Power (LDWP) | 6.3 GWh | Jan 1958 | Sep 2025 | Water |
| San Dimas | Metropolitan Water District of S CA | San Dimas, CA | California Independent System Operator (CISO) | 10.3 GWh | May 1981 | Sep 2025 | Water |
| Carson Cogeneration | Carson Cogeneration Co | Carson, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 1989 | Sep 2025 | Natural Gas |
| Kingsburg Cogen | KES Kingsburg LP | Kingsburg, CA | California Independent System Operator (CISO) | 8.4 GWh | Nov 1990 | Sep 2025 | Natural Gas |
| San Dimas Wash Generating Station | San Gabriel Valley Mun Wtr Dt | San Dimas, CA | California Independent System Operator (CISO) | 1.2 GWh | Feb 1986 | Sep 2025 | Water |
| Venable Solar 2 | Madison Energy Investments LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Sep 2025 | Solar |
| Lemoore 1 | AES Distributed Energy | Lemoore, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2016 | Sep 2025 | Solar |
| Corcoran Irrigation District | Madison Energy Investments LLC | Corcoran, CA | California Independent System Operator (CISO) | 4.0 GWh | Aug 2019 | Sep 2025 | Solar |
| Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 5.4 GWh | Sep 2015 | Aug 2025 | Solar |
| Medline Ind. Phase 2 Tracy | Powerflex | Tracy, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Aug 2025 | Solar |
| Bear Valley | City of Escondido - (CA) | Escondido, CA | California Independent System Operator (CISO) | 2.7 GWh | May 1986 | Aug 2025 | Water |
| Tulare Success Power Project | Lower Tule River Irrgtn Dist | Porterville, CA | California Independent System Operator (CISO) | 1.3 GWh | Nov 1989 | Aug 2025 | Water |
| Indian Valley Dam Hydro Project | Yolo County Flood Control WCD | Clearlake Oaks, CA | California Independent System Operator (CISO) | 11.2 GWh | Sep 1983 | Aug 2025 | Water |
| Etiwanda | Metropolitan Water District of S CA | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 1994 | Jul 2025 | Water |
| CE Turbo LLC | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 9.3 GWh | Jun 2000 | Jul 2025 | Geothermal |
| Parker | Merced Irrigation District | Snelling, CA | California Independent System Operator (CISO) | 6.0 GWh | Mar 1982 | Jun 2025 | Water |
| Haypress | EIF Haypress LLC | Sierra City, CA | California Independent System Operator (CISO) | 17.1 GWh | Nov 1988 | Jun 2025 | Water |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |