Intel Folsom Phase 3

1900 Prairie City Road, Folsom, CA 95630

Plant Summary Information

Intel Folsom Phase 3 is ranked #326 out of 817 solar farms in California in terms of total annual net electricity generation.

Intel Folsom Phase 3 generated 1.3 GWh during the 3-month period between September 2024 to December 2024.

Plant NameIntel Folsom Phase 3
Utility NameTesla Inc.
LocationSacramento County, CA
Initial Operation DateApril 2016
Last Update Dec 2024
Annual Generation 9.1 GWh
Annual Consumption 32.0 k MMBtu
Ranked #6,348 out of 12,299 Power Plants Nationwide
Ranked #1,942 out of 6,182 Solar Power Plants Nationwide
Ranked #881 out of 1,566 California Power Plants
Ranked #326 out of 817 California Solar Power Plants
Fuel Types Solar

Map of Intel Folsom Phase 3

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Intel Folsom Phase 3.

Create Your Account Today

Monthly Net Generation for Intel Folsom Phase 3

Intel Folsom Phase 3 Details

Summary Information
Plant NameIntel Folsom Phase 3 (61152)
Plant Address1900 Prairie City Road, Folsom, CA 95630
UtilityTesla Inc. (57313)
Latitude, Longitude38.64596, -121.16262
Generation Dates on FileApr 2016 to Dec 2024
Initial Operation DateApril 2016
Annual Generation 9.1 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityBalancing Authority of Northern California (BANC)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerSacramento Municipal Util Dist (16534) CA
Grid Voltage 1.00 kV
Energy StorageNo

Generator PV1 Details Operating April 2016

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity5.2 MW
Summer Capacity5.2 MW
Winter Capacity5.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2016
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle272
Tilt Angle5
DC Net Capacity6.5 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity6.5 MW
Virtual Net Metering AgreementNo

Intel Folsom Phase 3 Plant Owners

Owner NameAddressOwnership
Three Rivers Solar I, LLC6800 Dumbarton Circle, Fremont, CA 94555100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#1932Cenergy - Waterville (CSG)Waterville, ME9.1 GWh
#1933Statesville SolarCleveland, NC9.1 GWh
#1934Rengstorf Solar CSGCoutland, MN9.1 GWh
#1935Kalish Farm SolarCandor, NC9.1 GWh
#1936SkylarkSeverance, CO9.1 GWh
#1937Hamilton Solar-CrosswicksHamilton, NJ9.1 GWh
#1938Lemond SolarOwatonna, MN9.1 GWh
#1939Innovative Solar 65Laurinburg, NC9.1 GWh
#1940Soluga Farms 2 LLCClarkton, NC9.1 GWh
#1941Woodland SolarWoodland, NC9.1 GWh
#1943Maybrook Solar, LLC (CSG)Campbell Hall, NY9.0 GWh
#1944Walcott Solar CSGFaribault, MN9.0 GWh
#1945Mercer County Community CollegeWest Windsor, NJ9.0 GWh
#1946Wortham Solar FarmHenderson, NC9.0 GWh
#1947Lincoln Solar, LLC (NC)Bostic, NC9.0 GWh
#1948Innovative Solar 55Pembroke, NC9.0 GWh
#1949Davis Lane Solar, LLCEdenton, NC9.0 GWh
#1950Kinston Davis FarmKinston, NC9.0 GWh
#1951City of Gallup SolarGallup, NM9.0 GWh
#1952Jersey HoldingsLumberton, NC9.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Intel Folsom Phase 3.

Plant NamePlant LocationAnnual GenerationDistance
Aerojet IRancho Cordova, CA5.1 GWh2.2 mi
Aerojet IIRancho Cordova, CA3.8 GWh2.6 mi
Blue Shld Of Cal- El Dorado Hlls Mtr BEl Dorado Hills, CA2.8 GWh4.8 mi
Broadridge CogenEl Dorado Hills, CA15.8 GWh6 mi
Deer Creek 2Shingle Springs, CA2.7 GWh9.7 mi
Dept of General Services -FTBSacramento, CA5.1 GWh11.2 mi
El Dorado Solar, LLCEl Dorado Hills, CA2.9 GWh5.6 mi
FAA NorCal TRACONMather AFB, CA1.6 GWh7.9 mi
FolsomFolsom, CA546.4 GWh4.2 mi
Folsom SP and CSP SacramentoRepresa, CA2.3 GWh2.8 mi
Intel FolsomFolsom, CA1.4 GWh0.6 mi
Intel Folsom Phase 2Folsom, CA1.5 GWh0.2 mi
Kiefer LandfillSloughhouse, CA51.0 GWh9.3 mi
McClellan (CA)Sacramento, CA3.4 GWh12.5 mi
NimbusFolsom, CA46.7 GWh3.2 mi
Rancho Cordova Medical OfficesRancho Cordova, CA2.0 GWh8.4 mi
RE Dillard 1 LLCSloughhouse, CA6.0 GWh12.3 mi
RE Dillard 2 LLCSloughhouse, CA6.1 GWh12.5 mi
RE Dillard 3 LLCSloughhouse, CA6.1 GWh12.8 mi
US GSA - SacramentoSacramento, CA2.0 GWh13.1 mi