RE Gaskell West 4 LLC
23555 Gaskell Road, Rosamond, CA 93560Plant Summary Information
RE Gaskell West 4 LLC is ranked #196 out of 886 solar farms in California in terms of total annual net electricity generation.
RE Gaskell West 4 LLC generated 9.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | RE Gaskell West 4 LLC |
|---|---|
| Utility Name | RE Gaskell West LLC |
| Location | Kern County, CA |
| Initial Operation Date | May 2023 |
| Last Update | Dec 2025 |
| Annual Generation | 47.5 GWh |
| Annual Consumption | 172.6 k MMBtu |
| Ranked #4,298 out of 13,094 Power Plants Nationwide | |
| Ranked #1,171 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #486 out of 1,607 California Power Plants | |
| Ranked #196 out of 886 California Solar Power Plants | |
| Fuel Types | Solar |
Map of RE Gaskell West 4 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Gaskell West 4 LLC.
Monthly Net Generation for RE Gaskell West 4 LLC
Monthly Plant Fuel Consumption for RE Gaskell West 4 LLC
RE Gaskell West 4 LLC Details
| Summary Information | |
|---|---|
| Plant Name | RE Gaskell West 4 LLC (61448) |
| Plant Address | 23555 Gaskell Road, Rosamond, CA 93560 |
| Utility | RE Gaskell West LLC (61069) |
| Latitude, Longitude | 34.82787, -118.56818 |
| Generation Dates on File | Mar 2023 to Dec 2025 |
| Initial Operation Date | May 2023 |
| Annual Generation | 47.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator PV4 Details Operating May 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 20 MW |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 27 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
RE Gaskell West 4 LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1161 | Wildwood Solar I, LLC | Wasco, CA | 48.3 GWh |
| #1162 | Corcoran Solar 3 | Corcoran, CA | 48.1 GWh |
| #1163 | RE Gaskell West 5 LLC | Rosamond, CA | 48.0 GWh |
| #1164 | Apex Solar PV Power Project | North Las Vegas, NV | 48.0 GWh |
| #1165 | Windhub Solar A LLC | Mojave, CA | 48.0 GWh |
| #1166 | Frontier Solar LLC | Newman, CA | 47.9 GWh |
| #1167 | Sterlington Solar | Sterlington, LA | 47.8 GWh |
| #1168 | Green River Energy Center - Hybrid | Emery, UT | 46.4 GWh |
| #1169 | Sulphur Springs | Cochise, AZ | 47.7 GWh |
| #1170 | Simcoe Solar | Mountain Home, ID | 47.5 GWh |
| #1172 | Fort Stewart Solar Facility | Fort Stewart, GA | 47.5 GWh |
| #1173 | DWW Solar ll | Simsbury, CT | 47.2 GWh |
| #1174 | Roadrunner Solar | Santa Teresa, NM | 47.0 GWh |
| #1175 | Hayworth Solar | Edison, CA | 47.0 GWh |
| #1176 | Corcoran Solar 2 | Corcoran, CA | 46.8 GWh |
| #1177 | Shoreham Solar Commons | Shoreham, NY | 46.7 GWh |
| #1178 | Branch Solar Project | Coldwater, MI | 46.6 GWh |
| #1179 | Antelope Expansion 1B | Lancaster, CA | 46.6 GWh |
| #1180 | Nicolis Solar PV Plant | Delano, CA | 46.3 GWh |
| #1181 | Jacumba Solar Farm | Jacumba, CA | 46.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Gaskell West 4 LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alamo | Pearblossom, CA | 65.7 GWh | 6.8 mi |
| Alpine Solar | Lancaster, CA | 114.1 GWh | 4.5 mi |
| AV Solar Ranch One | Lancaster, CA | 560.8 GWh | 8.8 mi |
| Camino Solar Hybrid | Rosamond, CA | 134.4 GWh | 10 mi |
| Gaskell West 1 Solar Facility | Lancaster, CA | 55.6 GWh | 0.4 mi |
| Golden Field Solar III, LLC | Rosamond, CA | 544.9 GWh | 9.9 mi |
| Golden Fields Solar I, LLC | Rosamond, CA | 139.3 GWh | 10.3 mi |
| Kingbird A Solar LLC | Rosamond, CA | 38.2 GWh | 7.7 mi |
| Kingbird B Solar, LLC | Rosamond, CA | 55.2 GWh | 7.4 mi |
| Manzana Wind LLC | Rosamond, CA | 519.3 GWh | 9.6 mi |
| Pacific Wind LLC | Rosamond, CA | 294.7 GWh | 8.9 mi |
| RE Astoria | Rosamond, CA | 189.6 GWh | 6.3 mi |
| RE Astoria 2 | Rosamond, CA | 185.7 GWh | 5 mi |
| RE Garland | Rosamond, CA | 509.7 GWh | 2.5 mi |
| RE Garland A | Rosamond, CA | 56.7 GWh | 4 mi |
| RE Gaskell West 2 LLC | Rosamond, CA | 124.2 GWh | 1.1 mi |
| RE Gaskell West 3 LLC | Rosamond, CA | 50.8 GWh | 1.1 mi |
| RE Gaskell West 5 LLC | Rosamond, CA | 48.0 GWh | 1.1 mi |
| Solar Star 1 | Rosamond, CA | 888.9 GWh | 9.4 mi |
| Solar Star California, XLI, LLC | Rosamond, CA | 138.1 GWh | 10.3 mi |