USG 1
3810 W. Evan Hewes Hwy, El Centro, CA 92243Plant Summary Information
USG 1 is ranked #573 out of 849 solar farms in California in terms of total annual net electricity generation.
USG 1 generated 573.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | USG 1 |
|---|---|
| Utility Name | ZGlobal Inc |
| Location | Imperial County, CA |
| Initial Operation Date | April 2014 |
| Last Update | Dec 2024 |
| Annual Generation | 3.0 GWh |
| Annual Consumption | 10.7 k MMBtu |
| Ranked #9,521 out of 12,539 Power Plants Nationwide | |
| Ranked #4,428 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,278 out of 1,600 California Power Plants | |
| Ranked #573 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of USG 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for USG 1.
Monthly Net Generation for USG 1
USG 1 Details
| Summary Information | |
|---|---|
| Plant Name | USG 1 (61682) |
| Plant Address | 3810 W. Evan Hewes Hwy, El Centro, CA 92243 |
| Utility | ZGlobal Inc (60059) |
| Latitude, Longitude | 32.79278, -115.85734 |
| Generation Dates on File | Jan 2017 to Dec 2024 |
| Initial Operation Date | April 2014 |
| Annual Generation | 3.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Imperial Irrigation District (IID) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
| Grid Voltage | 13.20 kV |
| Energy Storage | No |
Generator USG1 Details Operating April 2014
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 1.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.2 MW |
| Virtual Net Metering Agreement | No |
USG 1 Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Green Light FIT 2, LLC | 604 Sutter Street, Suite 250, Folsom, CA 95630 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4418 | HQC Rock River Solar Power Gen Station | Beloit, WI | 3.0 GWh |
| #4419 | Chanel Piscataway Rooftop | Piscataway, NJ | 3.0 GWh |
| #4420 | Hickory Grove #1 | Horseheads, NY | 3.0 GWh |
| #4421 | Colonial Pipeline Allentown Chesterfield | Chesterfield, NJ | 3.0 GWh |
| #4422 | Alta Sea | San Pedro, CA | 3.0 GWh |
| #4423 | Owens Valley Solar Project 11 | Olancha, CA | 3.0 GWh |
| #4424 | Rancho Cucamonga Dist #1 | Rancho Cucamonga, CA | 3.0 GWh |
| #4425 | DPC York | Thomson, IL | 3.0 GWh |
| #4426 | Carver MA 1 Community Solar | Carver, MA | 3.0 GWh |
| #4427 | Dixie Creek Dairy Solar | Hanford, CA | 3.0 GWh |
| #4429 | Long Henry Solar | Seven Springs, NC | 3.0 GWh |
| #4430 | Lichtenthal | Batavia, NY | 3.0 GWh |
| #4431 | EMWD - San Jacinto RES BCT | San Jacinto, CA | 3.0 GWh |
| #4432 | Pool Brook Rd Community Solar Farm | Laurens, NY | 3.0 GWh |
| #4433 | Yellow Mills Rd #1 Community Solar Farm | Farmington, NY | 3.0 GWh |
| #4434 | Jersey Gardens Phase 2 | Elizabeth, NJ | 3.0 GWh |
| #4435 | Clarendon Solar Farm | North Clarendon, VT | 3.0 GWh |
| #4436 | APG Old Bayside | Aberdeen, MD | 3.0 GWh |
| #4437 | Camp Atterbury Microgrid Hybrid | Edinburgh, IN | 2.8 GWh |
| #4438 | Broadway 4 - Target Shafter | Shafter, CA | 3.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding USG 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Campo Verde Solar | El Centro, CA | 294.7 GWh | 8.1 mi |
| Centinela Solar Energy | Calexico, CA | 352.7 GWh | 14.2 mi |
| Centinela State Prison | Sacramento, CA | 16.7 GWh | 4.9 mi |
| Drew Solar LLC | Calexico, CA | 309.4 GWh | 13.3 mi |
| El Centro Hybrid | El Centro, CA | 1.1 TWh | 18.4 mi |
| Heber Solar | Heber, CA | 24.6 GWh | 19.2 mi |
| Imperial Solar Energy Center South | Calexico, CA | 264.3 GWh | 14.6 mi |
| Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh | 4.7 mi |
| Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh | 17.8 mi |
| Mount Signal Solar Farm II | Calexico, CA | 410.2 GWh | 15.8 mi |
| Mount Signal Solar Farm V | Calexico, CA | 673.8 GWh | 18.6 mi |
| Ocotillo Express LLC | Ocotillo, CA | 461.7 GWh | 11.2 mi |
| Second Imperial Geothermal | Heber, CA | 302.3 GWh | 19.5 mi |
| SEPV Imperial Dixieland East | Imperial, CA | 4.2 GWh | 4.9 mi |
| SEPV Imperial Dixieland West | Imperial, CA | 7.8 GWh | 4.5 mi |
| Sol Orchard El Centro PV | El Centro, CA | 47.1 GWh | 18.1 mi |
| Spreckels Sugar Company | Brawley, CA | 19.9 GWh | 18.7 mi |
| USG 2 | El Centro, CA | 2.0 GWh | 0.4 mi |
| Valencia 3 | Imperial, CA | 6.6 GWh | 19.6 mi |
| Wistaria Ranch Solar | Calexico, CA | 288.9 GWh | 16 mi |