| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Sampson Solar | Strata Manager, LLC | Roseboro, NC | Duke Energy Progress East (CPLE) | 4.0 GWh | Jun 2015 | Dec 2024 | Solar |
| Wadesboro Farm 3 | Strata Manager, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 9.7 GWh | Mar 2016 | Dec 2024 | Solar |
| Monroe Solar Facility | Duke Energy Carolinas, LLC | Monroe, NC | Duke Energy Progress East (CPLE) | 92.9 GWh | Feb 2017 | Mar 2026 | Solar |
| Shoe Creek Solar, LLC | Cypress Creek Renewables | Laurinburg, NC | Duke Energy Progress East (CPLE) | 127.9 GWh | Nov 2017 | Mar 2026 | Solar |
| Southerland Farm Solar | Strata Manager, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Oct 2016 | Dec 2024 | Solar |
| Flint Hill Solar, LLC | Cypress Creek Renewables | Carthage, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Aug 2016 | Dec 2024 | Solar |
| Hector Farm | Strata Manager, LLC | Troy, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Feb 2017 | Dec 2024 | Solar |
| Kojak Farm | Strata Manager, LLC | Bailey, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | May 2016 | Dec 2024 | Solar |
| Soluga Farms III | Strata Manager, LLC | Godwin, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Oct 2015 | Dec 2024 | Solar |
| Snow Camp Solar, LLC | Cypress Creek Renewables | Snow Camp, NC | Duke Energy Progress East (CPLE) | 11.1 GWh | Feb 2016 | Dec 2024 | Solar |
| Siler 421 Farm, LLC | Heelstone Energy Holdings, LLC | Siler City, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | Nov 2016 | Dec 2024 | Solar |
| BRE NC Solar 3 | Pine Gate Renewables | Oxford, NC | Duke Energy Progress East (CPLE) | 10.0 GWh | Nov 2021 | Dec 2024 | Solar |
| Fox Creek Solar | John Laing US Solar Corp. | Louisburg, NC | Duke Energy Progress East (CPLE) | 84.3 GWh | Oct 2018 | Mar 2026 | Solar |
| Brantley Solar | John Laing US Solar Corp. | Spring Hope, NC | Duke Energy Progress East (CPLE) | 97.1 GWh | Sep 2018 | Mar 2026 | Solar |
| McGrigor Farm Solar | Carolina Solar Energy LLC | Clinton, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Sep 2019 | Dec 2024 | Solar |
| Sellers Farm Solar | Strata Manager, LLC | Hamlet, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Apr 2022 | Dec 2024 | Solar |
| Meriwether Farm | Strata Manager, LLC | Oxford, NC | Duke Energy Progress East (CPLE) | 8.5 GWh | Aug 2016 | Dec 2024 | Solar |
| North Nash Farm, LLC | Strata Manager, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Tides Lane Farm | Strata Manager, LLC | Louisburg, NC | Duke Energy Progress East (CPLE) | 4.8 GWh | Sep 2019 | Dec 2024 | Solar |
| Wadesboro Farm 2 | Strata Manager, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 9.8 GWh | May 2016 | Dec 2024 | Solar |
| Railroad Farm 2 | Strata Manager, LLC | St. Pauls, NC | Duke Energy Progress East (CPLE) | 9.7 GWh | Sep 2014 | Dec 2024 | Solar |
| Wadesboro Solar | Oppidum Renewables USA, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Old Wire Farm | Strata Manager, LLC | Laurel Hill, NC | Duke Energy Progress East (CPLE) | 10.3 GWh | Nov 2016 | Dec 2024 | Solar |
| Mills Anson Farm | Strata Manager, LLC | Lilesville, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | May 2016 | Dec 2024 | Solar |
| Stone Solar | Strata Manager, LLC | Lumberton, NC | Duke Energy Progress East (CPLE) | 10.0 GWh | Jul 2016 | Dec 2024 | Solar |
| Wadesboro Farm 1 | Strata Manager, LLC | Wadesboro, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Feb 2015 | Dec 2024 | Solar |
| Delco Farm | Strata Manager, LLC | Riegelwood, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | May 2016 | Dec 2024 | Solar |
| Kinston Davis Farm | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Feb 2015 | Dec 2024 | Solar |
| Ruskin Solar | Cypress Creek Renewables | Dudley, NC | Duke Energy Progress East (CPLE) | 3.9 GWh | Oct 2017 | Dec 2024 | Solar |
| Atkinson Farm Solar | Strata Manager, LLC | Beulaville, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Cotten Farm, LLC | Heelstone Energy Holdings, LLC | Sanford, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Oct 2016 | Dec 2024 | Solar |
| Scarlet Solar | Cypress Creek Renewables | La Grange, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Aug 2017 | Dec 2024 | Solar |
| Viper Solar | Cypress Creek Renewables | Rockfish, NC | Duke Energy Progress East (CPLE) | 3.9 GWh | Oct 2017 | Dec 2024 | Solar |
| Innovative Solar 42 | Innovative Solar 42, LLC | Fayetteville, NC | Duke Energy Progress East (CPLE) | 86.4 GWh | Aug 2017 | Mar 2026 | Solar |
| Darlington Solar, LLC | Darlington Solar, LLC | Darlington, SC | Duke Energy Progress East (CPLE) | 19.3 GWh | Nov 2016 | Dec 2024 | Solar |
| ZV Solar 1 | Cypress Creek Renewables | Red Springs, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | May 2016 | Dec 2024 | Solar |
| Tanager Holdings | Big Sky Wind, LLC | Asheboro, NC | Duke Energy Progress East (CPLE) | 5.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Innovative Solar 31 | MN8 Energy LLC | Bladenboro, NC | Duke Energy Progress East (CPLE) | 52.9 GWh | Dec 2016 | Mar 2026 | Solar |
| Bay Branch Solar | Sol Systems | Chocowinity, NC | Duke Energy Progress East (CPLE) | 11.0 GWh | Nov 2018 | Dec 2024 | Solar |
| Cherry Blossom Solar LLC | CBH Lessor LLC | Hemingway, SC | Duke Energy Progress East (CPLE) | 18.7 GWh | Nov 2019 | Dec 2024 | Solar |
| Scotch Bonnet Solar, LLC | Scotch Bonnet Solar, LLC | St Helena, NC | Duke Energy Progress East (CPLE) | 6.3 GWh | Nov 2020 | Dec 2024 | Solar |
| Cubera Solar, LLC | Cubera Solar, LLC | Dunn, NC | Duke Energy Progress East (CPLE) | 4.0 GWh | Dec 2019 | Dec 2024 | Solar |
| ESA Four Oaks 2 NC LLC | ESA Four Oaks 2 NC LLC | Four Oaks, NC | Duke Energy Progress East (CPLE) | 3.2 GWh | Nov 2019 | Dec 2024 | Solar |
| Harvest Beulaville, LLC | Cardinal Renewables | Beulaville, NC | Duke Energy Progress East (CPLE) | 3.5 GWh | Mar 2017 | Dec 2024 | Solar |
| Spring Hope Solar 3, LLC | Spring Hope Solar 3, LLC | Spring Hope, NC | Duke Energy Progress East (CPLE) | 5.6 GWh | Nov 2020 | Dec 2024 | Solar |
| ESA Hamlet NC , LLC | ESA Hamlet NC LLC | Hamlet, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | May 2020 | Dec 2024 | Solar |
| Railroad Solar Farm, LLC | Cardinal Renewables | Pembroke, NC | Duke Energy Progress East (CPLE) | 6.2 GWh | Nov 2016 | Dec 2024 | Solar |
| ATOOD Solar IV, LLC | Cardinal Renewables | Leland, NC | Duke Energy Progress East (CPLE) | 7.5 GWh | Nov 2019 | Dec 2024 | Solar |
| AGA TAG Solar IV LLC | AGA TAG Solar IV LLC | Leland, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Nov 2019 | Dec 2024 | Solar |
| Plott Hound Solar | Plott Hound Solar, LLC | New Bern, NC | Duke Energy Progress East (CPLE) | 6.9 GWh | Apr 2021 | Dec 2024 | Solar |
| Wilson Farm 1 | Strata Manager, LLC | Elm City, NC | Duke Energy Progress East (CPLE) | 8.1 GWh | Jun 2013 | Dec 2024 | Solar |
| Chadbourn Farm | Strata Manager, LLC | Whiteville, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Nov 2012 | Dec 2024 | Solar |
| Bolton Farm | Strata Manager, LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Jun 2013 | Dec 2024 | Solar |
| Rock Farm | Strata Manager, LLC | Rockingham, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Apr 2013 | Dec 2024 | Solar |
| McCallum Farm | Strata Manager, LLC | Rowland, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Aug 2013 | Dec 2024 | Solar |
| Mt Olive Farm 2 | Strata Manager, LLC | Mt Olive, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Apr 2013 | Dec 2024 | Solar |
| AM Best Farm | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | May 2013 | Dec 2024 | Solar |
| Yanceyville Farm | Palmetto Power Management LLC | Blanch, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Nov 2013 | Dec 2024 | Solar |
| Mile Farm | Palmetto Power Management LLC | Rougemont, NC | Duke Energy Progress East (CPLE) | 7.3 GWh | May 2014 | Dec 2024 | Solar |
| Fuquay Farm | Strata Manager, LLC | Middle Creek Township, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Feb 2013 | Dec 2024 | Solar |
| North Carolina Solar Bethea I | USF Surry, LLC | Laurinburg, NC | Duke Energy Progress East (CPLE) | 3.1 GWh | Mar 2012 | Dec 2024 | Solar |
| Lenoir Farm | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Lenoir Farm 2 | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 7.9 GWh | May 2013 | Dec 2024 | Solar |
| Roxboro Farm | Strata Manager, LLC | Roxboro, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Mar 2014 | Dec 2024 | Solar |
| New Bern Farm | Strata Manager, LLC | Ernul, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Mar 2014 | Dec 2024 | Solar |
| Moorings Farm | Strata Manager, LLC | New Hope, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Aug 2013 | Dec 2024 | Solar |
| Progress Manis I | USF Surry, LLC | Laurinburg, NC | Duke Energy Progress East (CPLE) | 2.0 GWh | Mar 2012 | Dec 2024 | Solar |
| Smithfield Packaged Meats Corp (Kinston) | Smithfield Packaged Meats Corp (Kinston) | Kinston, NC | Duke Energy Progress East (CPLE) | 1.2 GWh | Oct 2013 | Dec 2024 | Distillate Fuel Oil |
| Uwharrie Mountain Renewable | Uwharrie Mountain Renewable Energy, LLC | Mt. Gilead, NC | Duke Energy Progress East (CPLE) | 32.1 GWh | Jun 2014 | Dec 2024 | Landfill Gas |
| Washington White Post Solar LLC | Duke Energy Renewables Services | Bath, NC | Duke Energy Progress East (CPLE) | 18.6 GWh | Nov 2012 | Dec 2024 | Solar |
| South Robeson Farm | USF Surry, LLC | Rowland, NC | Duke Energy Progress East (CPLE) | 7.0 GWh | May 2012 | Dec 2024 | Solar |
| Raeford Farm | SRE Utility Solar 1, LLC | Raeford, NC | Duke Energy Progress East (CPLE) | 8.1 GWh | Nov 2012 | Dec 2024 | Solar |
| Granville Solar PV Power Project | Southern Power Co | Oxford, NC | Duke Energy Progress East (CPLE) | 4.7 GWh | Sep 2012 | Dec 2024 | Solar |
| Sandy Cross Solar, LLC | Oppidum Renewables USA, LLC | Elm City, NC | Duke Energy Progress East (CPLE) | 1.3 GWh | Apr 2012 | Dec 2024 | Solar |
| Progress Solar 1, LLC | Oppidum Renewables USA, LLC | Bunn, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Sep 2012 | Dec 2024 | Solar |
| Progress Solar II, LLC | Oppidum Renewables USA, LLC | Fairmont, NC | Duke Energy Progress East (CPLE) | 5.2 GWh | Oct 2012 | Dec 2024 | Solar |
| Progress Solar III, LLC | Oppidum Renewables USA, LLC | Maxton, NC | Duke Energy Progress East (CPLE) | 5.8 GWh | Oct 2012 | Dec 2024 | Solar |
| PCIP Solar | Greenbacker Renewable Energy Corporation | Timberlake, NC | Duke Energy Progress East (CPLE) | 1.6 GWh | Oct 2011 | Dec 2024 | Solar |
| Shannon Farm | Strata Manager, LLC | Shannon, NC | Duke Energy Progress East (CPLE) | 7.0 GWh | Sep 2012 | Dec 2024 | Solar |
| Sonoco Products Co | Sonoco Products Co | Hartsville, SC | Duke Energy Progress East (CPLE) | 66.1 GWh | Jan 1947 | Mar 2026 | Wood/Wood Waste Solids : 88.8% Natural Gas : 11.2% |
| Warrenton Farm | Palmetto Power Management LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 6.4 GWh | Nov 2012 | Dec 2024 | Solar |
| Mocksville Farm | Strata Manager, LLC | Mocksville, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Oct 2012 | Dec 2024 | Solar |
| Belwood Farm | Palmetto Power Management LLC | Lawndale, NC | Duke Energy Progress East (CPLE) | 6.0 GWh | Nov 2012 | Dec 2024 | Solar |
| Railroad Farm | Palmetto Power Management LLC | St. Pauls, NC | Duke Energy Progress East (CPLE) | 5.8 GWh | Sep 2012 | Dec 2024 | Solar |
| Watts Farm | Palmetto Power Management LLC | Maxton, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Jun 2012 | Dec 2024 | Solar |
| Farrington Farm | Strata Manager, LLC | Chapel Hill, NC | Duke Energy Progress East (CPLE) | 1.4 GWh | Mar 2012 | Dec 2024 | Solar |
| Arba Solar Energy Storage | North Carolina El Member Corp | Hamlet, NC | Duke Energy Progress East (CPLE) | 6.0 GWh | Feb 2023 | Dec 2024 | Solar |
| Hamlet Solar Energy Storage | North Carolina El Member Corp | Hamlet, NC | Duke Energy Progress East (CPLE) | 550.0 MWh | Feb 2023 | Dec 2024 | Solar |
| Rose Acre Solar Energy Storage | North Carolina El Member Corp | Currituck, NC | Duke Energy Progress East (CPLE) | 2.2 GWh | Feb 2023 | Dec 2024 | Solar |
| Spencer Meadow Solar Energy Storage | North Carolina El Member Corp | Asheboro, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Dec 2021 | Dec 2024 | Solar |
| Old Cedar Solar Energy Storage | North Carolina El Member Corp | Asheboro, NC | Duke Energy Progress East (CPLE) | 1.8 GWh | Jul 2021 | Dec 2024 | Solar |
| Wake RJ3 Solar Energy Storage | North Carolina El Member Corp | Wake Forest, NC | Duke Energy Progress East (CPLE) | 21.0 MWh | Feb 2023 | Nov 2024 | Solar |
| Ludie Brown Solar Energy Storage | North Carolina El Member Corp | Chinquapin, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | Dec 2021 | Dec 2024 | Solar |
| Flatwood Farm | Strata Manager, LLC | Moncure, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Nov 2018 | Dec 2024 | Solar |
| Wyse Fork Solar Farm, LLC | Wyse Fork Solar Farm, LLC | Dover, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | Nov 2021 | Dec 2024 | Solar |
| Van Buren | Van Buren Solar, LLC | Roseboro, NC | Duke Energy Progress East (CPLE) | 2.4 GWh | Feb 2021 | Dec 2024 | Solar |
| Thunderhead | Thunderhead Solar, LLC | Asheboro, NC | Duke Energy Progress East (CPLE) | 3.2 GWh | Nov 2021 | Dec 2024 | Solar |
| Ridgeback | Ridgeback Solar, LLC | Liberty, NC | Duke Energy Progress East (CPLE) | 3.9 GWh | Nov 2021 | Dec 2024 | Solar |
| Cabin Creek Solar, LLC | Cabin Creek Solar, LLC | Biscoe, NC | Duke Energy Progress East (CPLE) | 159.6 GWh | Dec 2022 | Mar 2026 | Solar |
| Phobos Solar, LLC | Phobos Solar, LLC | Middlesex, NC | Duke Energy Progress East (CPLE) | 167.7 GWh | Dec 2022 | Mar 2026 | Solar |
Summary of Power Plants By State
Figures are based on March 2026 generation numbers.| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 76 | 10,194.39 GWh |
| Alaska | # 48 | 139 | 566.31 GWh |
| Arizona | # 15 | 183 | 8,256.99 GWh |
| Arkansas | # 25 | 114 | 4,973.03 GWh |
| California | # 5 | 1,656 | 15,197.83 GWh |
| Colorado | # 30 | 294 | 4,491.41 GWh |
| Connecticut | # 31 | 161 | 3,992.67 GWh |
| Delaware | # 49 | 33 | 248.78 GWh |
| District of Columbia | # 51 | 16 | 18.32 GWh |
| Florida | # 3 | 334 | 19,802.71 GWh |
| Georgia | # 8 | 247 | 10,697.11 GWh |
| Hawaii | # 46 | 69 | 784.18 GWh |
| Idaho | # 42 | 144 | 1,957.44 GWh |
| Illinois | # 4 | 379 | 15,489.73 GWh |
| Indiana | # 12 | 216 | 9,257.49 GWh |
| Iowa | # 21 | 289 | 6,478.67 GWh |
| Kansas | # 23 | 183 | 5,489.55 GWh |
| Kentucky | # 29 | 59 | 4,637.74 GWh |
| Louisiana | # 17 | 86 | 8,003.69 GWh |
| Maine | # 45 | 212 | 1,313.24 GWh |
| Maryland | # 39 | 202 | 2,834.84 GWh |
| Massachusetts | # 44 | 639 | 1,383.17 GWh |
| Michigan | # 13 | 268 | 8,564.76 GWh |
| Minnesota | # 26 | 760 | 4,875.53 GWh |
| Mississippi | # 24 | 55 | 5,467.46 GWh |
| Missouri | # 22 | 125 | 5,500.53 GWh |
| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 69 | 2,464.49 GWh |
| Nebraska | # 37 | 121 | 3,330.39 GWh |
| Nevada | # 35 | 114 | 3,487.65 GWh |
| New Hampshire | # 43 | 54 | 1,520.13 GWh |
| New Jersey | # 28 | 379 | 4,705.05 GWh |
| New Mexico | # 33 | 142 | 3,587.89 GWh |
| New York | # 9 | 935 | 10,247.40 GWh |
| North Carolina | # 11 | 896 | 9,821.46 GWh |
| North Dakota | # 32 | 59 | 3,854.12 GWh |
| Ohio | # 6 | 200 | 12,175.28 GWh |
| Oklahoma | # 19 | 142 | 7,305.54 GWh |
| Oregon | # 20 | 266 | 6,583.30 GWh |
| Pennsylvania | # 2 | 249 | 20,000.86 GWh |
| Rhode Island | # 47 | 100 | 610.71 GWh |
| South Carolina | # 14 | 204 | 8,273.25 GWh |
| South Dakota | # 41 | 52 | 2,184.62 GWh |
| Tennessee | # 18 | 88 | 7,335.80 GWh |
| Texas | # 1 | 961 | 46,858.09 GWh |
| Utah | # 38 | 125 | 3,184.50 GWh |
| Vermont | # 50 | 117 | 217.82 GWh |
| Virginia | # 16 | 233 | 8,059.42 GWh |
| Washington | # 7 | 131 | 10,773.76 GWh |
| West Virginia | # 34 | 40 | 3,543.98 GWh |
| Wisconsin | # 27 | 239 | 4,794.79 GWh |
| Wyoming | # 36 | 70 | 3,358.51 GWh |