Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Quincy Solar (NC) | Cypress Creek Renewables | Cumberland, NC | Duke Energy Progress East (CPLE) | 6.8 GWh | Oct 2015 | Dec 2024 | Solar |
| Eastover Farm | Strata Manager, LLC | Laurinburg, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Aug 2014 | Dec 2024 | Solar |
| Crockett Farm | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Nov 2014 | Dec 2024 | Solar |
| Candace Solar | Cypress Creek Renewables | Princeton, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Jul 2016 | Dec 2024 | Solar |
| CII Methane Management IV, LLC | Frontier Operation Services | Smithfield, NC | Duke Energy Progress East (CPLE) | 11.3 GWh | May 2014 | Dec 2024 | Landfill Gas |
| Manway Solar Farm | Strata Manager, LLC | Garland, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Nov 2015 | Dec 2024 | Solar |
| Princeton | USF Surry, LLC | Princeton, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jun 2015 | Dec 2024 | Solar |
| Sarah Solar | USF Surry, LLC | Louisburg, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Jun 2015 | Dec 2024 | Solar |
| Innovative Solar 14, LLC | AES Distributed Energy | Hendersonville, NC | Duke Energy Progress East (CPLE) | 3.2 GWh | Jul 2014 | Dec 2024 | Solar |
| Vicksburg Solar | Cypress Creek Renewables | Henderson, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Apr 2015 | Dec 2024 | Solar |
| Franklinton Solar | Cypress Creek Renewables | Franklinton, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Feb 2017 | Dec 2024 | Solar |
| Cornwall Solar Center, LLC | SRE Utility Solar 1, LLC | Oxford, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Sep 2016 | Dec 2024 | Solar |
| Flowers Solar LLC | Altus Power America Management, LLC | Benson, NC | Duke Energy Progress East (CPLE) | 7.7 GWh | Jan 2019 | Dec 2024 | Solar |
| Warren Solar Farm LLC | Sol Systems | Newton Grove, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jun 2019 | Dec 2024 | Solar |
| Panda Solar NC 3, LLC | Panda Solar NC 3, LLC | Lumberton, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | May 2019 | Dec 2024 | Solar |
| Panda Solar NC 2, LLC | Panda Solar NC 2, LLC | Fairmont, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | Mar 2019 | Dec 2024 | Solar |
| Morning View | Cypress Creek Renewables | Seagrove, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | Nov 2018 | Dec 2024 | Solar |
| Gaines Solar | Gaines Solar | Bishopville, SC | Duke Energy Progress East (CPLE) | 3.9 GWh | Nov 2020 | Dec 2024 | Solar |
| Bani Solar | Bani Solar, LLC | Olanta, SC | Duke Energy Progress East (CPLE) | 4.4 GWh | Jan 2021 | Dec 2024 | Solar |
| Lane Solar | Lane Solar Farm LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 9.2 GWh | Aug 2018 | Dec 2024 | Solar |
| Sadiebrook NC Solar | Sadiebrook Solar LLC | Clarkton, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | May 2018 | Dec 2024 | Solar |
| Bladenboro Solar 2 | Bladenboro Farm 2 LLC | Bladenboro, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Jul 2018 | Dec 2024 | Solar |
| Warrenton I Solar | Warrenton Solar I LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 7.3 GWh | Nov 2018 | Dec 2024 | Solar |
| Nickelson Solar, LLC | Sol Systems | Wallace, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Red Toad 5840 Buffalo Road, LLC | Sol Systems | Selma, NC | Duke Energy Progress East (CPLE) | 4.3 GWh | Oct 2018 | Dec 2024 | Solar |
| Birch Solar | Birch Solar | Darlington, SC | Duke Energy Progress East (CPLE) | 3.7 GWh | Jan 2024 | Dec 2024 | Solar |
| Atkinson Solar II | Atkinson Solar II LLC | Beulaville, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Sep 2018 | Dec 2024 | Solar |
| Willis Solar | Altus Power America Management, LLC | Pamplico, SC | Duke Energy Progress East (CPLE) | 3.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Quarter Horse Solar | Quarter Horse Farm LLC | Hampstead, NC | Duke Energy Progress East (CPLE) | 9.5 GWh | Oct 2018 | Dec 2024 | Solar |
| Chapman Solar | Chapman Solar | Hartsville, SC | Duke Energy Progress East (CPLE) | 4.1 GWh | Oct 2023 | Dec 2024 | Solar |
| Abbot Solar | Altus Power America Management, LLC | Manning, SC | Duke Energy Progress East (CPLE) | 3.9 GWh | Nov 2018 | Dec 2024 | Solar |
| Panda Solar NC 1, LLC | Panda Solar NC 1, LLC | Fairmont, NC | Duke Energy Progress East (CPLE) | 1.8 GWh | Mar 2019 | Dec 2024 | Solar |
| Gary Solar | Altus Power America Management, LLC | Bishopville, SC | Duke Energy Progress East (CPLE) | 3.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Jefferson Solar (SC) | Jefferson Solar | Hartsville, SC | Duke Energy Progress East (CPLE) | 15.4 GWh | Oct 2022 | Dec 2024 | Solar |
| Sapphire Solar | Altus Power America Management, LLC | Lake City, SC | Duke Energy Progress East (CPLE) | 3.7 GWh | Nov 2018 | Dec 2024 | Solar |
| River Solar | Altus Power America Management, LLC | Lynchburg, SC | Duke Energy Progress East (CPLE) | 3.7 GWh | Nov 2018 | Dec 2024 | Solar |
| Luz Solar | Luz Solar | Hartsville, SC | Duke Energy Progress East (CPLE) | 5.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Tedder Solar | Tedder Solar | Darlington, SC | Duke Energy Progress East (CPLE) | 4.5 GWh | Nov 2021 | Dec 2024 | Solar |
| Marshall Solar | Marshall Solar | Hartsville, SC | Duke Energy Progress East (CPLE) | 3.2 GWh | Jun 2022 | Dec 2024 | Solar |
| Woodleaf Solar Facility | Duke Energy Carolinas, LLC | Salisbury, NC | Duke Energy Progress East (CPLE) | 11.7 GWh | Nov 2018 | Dec 2024 | Solar |
| Redwing Solar | Altus Power America Management, LLC | Darlington, SC | Duke Energy Progress East (CPLE) | 3.5 GWh | Jan 2019 | Dec 2024 | Solar |
| Jessamine Solar | Altus Power America Management, LLC | Marion, SC | Duke Energy Progress East (CPLE) | 3.6 GWh | Mar 2019 | Dec 2024 | Solar |
| Goldenrod Solar | Altus Power America Management, LLC | Pamplico, SC | Duke Energy Progress East (CPLE) | 3.7 GWh | Feb 2019 | Dec 2024 | Solar |
| Panda Solar NC 5, LLC | Panda Solar NC 5, LLC | Fayetteville, NC | Duke Energy Progress East (CPLE) | 1.7 GWh | May 2019 | Dec 2024 | Solar |
| Bond Solar | Altus Power America Management, LLC | Summerton, SC | Duke Energy Progress East (CPLE) | 3.3 GWh | Nov 2018 | Dec 2024 | Solar |
| Bloom Solar | Altus Power America Management, LLC | Summerton, SC | Duke Energy Progress East (CPLE) | 3.6 GWh | Jan 2019 | Dec 2024 | Solar |
| 1634 Solar | 1634 Solar, LLC | Hartsville, SC | Duke Energy Progress East (CPLE) | 4.2 GWh | Jan 2021 | Dec 2024 | Solar |
| County Home Solar LLC | MN8 Energy LLC | Rockingham, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Aug 2018 | Dec 2024 | Solar |
| Blacktip Solar | Altus Power America Management, LLC | Scranton, SC | Duke Energy Progress East (CPLE) | 3.6 GWh | Nov 2018 | Dec 2024 | Solar |
| Church Road Solar LLC | MN8 Energy LLC | Angier, NC | Duke Energy Progress East (CPLE) | 7.4 GWh | Jul 2018 | Dec 2024 | Solar |
| Page Solar | Page Solar Farm, LLC | Willow Spring, NC | Duke Energy Progress East (CPLE) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Hopewell Friends | Cypress Creek Renewables | Asheboro, NC | Duke Energy Progress East (CPLE) | 1.7 GWh | Nov 2018 | Dec 2024 | Solar |
| Copperfield | Cypress Creek Renewables | Troy, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | Nov 2018 | Dec 2024 | Solar |
| Burgaw Solar, LLC | CI-II Mitchell Holding LLC | Burgaw, NC | Duke Energy Progress East (CPLE) | 6.4 GWh | Oct 2019 | Dec 2024 | Solar |
| Vincent Solar | Altus Power America Management, LLC | Lynchburg, SC | Duke Energy Progress East (CPLE) | 3.5 GWh | Jan 2019 | Dec 2024 | Solar |
| Panda Solar NC 10, LLC | Panda Solar NC 10, LLC | Hope Mills, NC | Duke Energy Progress East (CPLE) | 4.2 GWh | May 2019 | Dec 2024 | Solar |
| Panda Solar NC 11, LLC | Panda Solar NC 11, LLC | Hope Mills, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | May 2019 | Dec 2024 | Solar |
| Thomas Solar | Thomas Solar | Lynchburg, SC | Duke Energy Progress East (CPLE) | 4.0 GWh | Mar 2024 | Dec 2024 | Solar |
| Pinesage | Cypress Creek Renewables | West End, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Nov 2018 | Dec 2024 | Solar |
| Panda Solar NC 9, LLC | Panda Solar NC 9, LLC | Hope Mills, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | May 2019 | Dec 2024 | Solar |
| Weaver Solar | Weaver Solar | Lynchburg, SC | Duke Energy Progress East (CPLE) | 1.7 GWh | Nov 2021 | Dec 2024 | Solar |
| Panda Solar NC 8, LLC | Panda Solar NC 8, LLC | Star, NC | Duke Energy Progress East (CPLE) | 2.7 GWh | Aug 2019 | Dec 2024 | Solar |
| Washington Solar (SC) | Washington Solar (SC) | Mullins, SC | Duke Energy Progress East (CPLE) | 5.0 GWh | Feb 2023 | Dec 2024 | Solar |
| Watauga Solar | Altus Power America Management, LLC | Society Hill, SC | Duke Energy Progress East (CPLE) | 3.8 GWh | Feb 2019 | Dec 2024 | Solar |
| Panda Solar NC 7, LLC | Panda Solar NC 7 , LLC | Faison, NC | Duke Energy Progress East (CPLE) | 2.8 GWh | Jun 2019 | Dec 2024 | Solar |
| South Solar | Altus Power America Management, LLC | Pamplico, SC | Duke Energy Progress East (CPLE) | 3.6 GWh | Nov 2018 | Dec 2024 | Solar |
| Buckleberry Solar | John Laing US Solar Corp. | Grifton, NC | Duke Energy Progress East (CPLE) | 95.5 GWh | Oct 2018 | Feb 2026 | Solar |
| Panda Solar NC 6, LLC | Panda Solar NC 6, LLC | Chadbourn, NC | Duke Energy Progress East (CPLE) | 1.7 GWh | May 2019 | Dec 2024 | Solar |
| Red Toad 4451 Buffalo Road, LLC | Sol Systems | Selma, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | Oct 2018 | Dec 2024 | Solar |
| Panda Solar NC 4, LLC | Panda Solar NC 4, LLC | Clarkton, NC | Duke Energy Progress East (CPLE) | 2.9 GWh | May 2019 | Dec 2024 | Solar |
| Mt Olive Farm 2 | Strata Manager, LLC | Mt Olive, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Apr 2013 | Dec 2024 | Solar |
| Roxboro Farm | Strata Manager, LLC | Roxboro, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Mar 2014 | Dec 2024 | Solar |
| New Bern Farm | Strata Manager, LLC | Ernul, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Mar 2014 | Dec 2024 | Solar |
| Shannon Farm | Strata Manager, LLC | Shannon, NC | Duke Energy Progress East (CPLE) | 7.0 GWh | Sep 2012 | Dec 2024 | Solar |
| Washington White Post Solar LLC | Duke Energy Renewables Services | Bath, NC | Duke Energy Progress East (CPLE) | 18.6 GWh | Nov 2012 | Dec 2024 | Solar |
| AM Best Farm | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | May 2013 | Dec 2024 | Solar |
| Rock Farm | Strata Manager, LLC | Rockingham, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Apr 2013 | Dec 2024 | Solar |
| Yanceyville Farm | Palmetto Power Management LLC | Blanch, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Nov 2013 | Dec 2024 | Solar |
| Farrington Farm | Strata Manager, LLC | Chapel Hill, NC | Duke Energy Progress East (CPLE) | 1.4 GWh | Mar 2012 | Dec 2024 | Solar |
| Wilson Farm 1 | Strata Manager, LLC | Elm City, NC | Duke Energy Progress East (CPLE) | 8.1 GWh | Jun 2013 | Dec 2024 | Solar |
| Watts Farm | Palmetto Power Management LLC | Maxton, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Jun 2012 | Dec 2024 | Solar |
| Railroad Farm | Palmetto Power Management LLC | St. Pauls, NC | Duke Energy Progress East (CPLE) | 5.8 GWh | Sep 2012 | Dec 2024 | Solar |
| Lenoir Farm | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Jun 2013 | Dec 2024 | Solar |
| Lenoir Farm 2 | Strata Manager, LLC | Kinston, NC | Duke Energy Progress East (CPLE) | 7.9 GWh | May 2013 | Dec 2024 | Solar |
| Fuquay Farm | Strata Manager, LLC | Middle Creek Township, NC | Duke Energy Progress East (CPLE) | 8.3 GWh | Feb 2013 | Dec 2024 | Solar |
| Sonoco Products Co | Sonoco Products Co | Hartsville, SC | Duke Energy Progress East (CPLE) | 67.2 GWh | Jan 1947 | Feb 2026 | Wood/Wood Waste Solids : 89.4% Natural Gas : 10.6% |
| PCIP Solar | Greenbacker Renewable Energy Corporation | Timberlake, NC | Duke Energy Progress East (CPLE) | 1.6 GWh | Oct 2011 | Dec 2024 | Solar |
| Raeford Farm | SRE Utility Solar 1, LLC | Raeford, NC | Duke Energy Progress East (CPLE) | 8.1 GWh | Nov 2012 | Dec 2024 | Solar |
| South Robeson Farm | USF Surry, LLC | Rowland, NC | Duke Energy Progress East (CPLE) | 7.0 GWh | May 2012 | Dec 2024 | Solar |
| Mile Farm | Palmetto Power Management LLC | Rougemont, NC | Duke Energy Progress East (CPLE) | 7.3 GWh | May 2014 | Dec 2024 | Solar |
| McCallum Farm | Strata Manager, LLC | Rowland, NC | Duke Energy Progress East (CPLE) | 8.6 GWh | Aug 2013 | Dec 2024 | Solar |
| Chadbourn Farm | Strata Manager, LLC | Whiteville, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Nov 2012 | Dec 2024 | Solar |
| Warrenton Farm | Palmetto Power Management LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 6.4 GWh | Nov 2012 | Dec 2024 | Solar |
| Mocksville Farm | Strata Manager, LLC | Mocksville, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Oct 2012 | Dec 2024 | Solar |
| Belwood Farm | Palmetto Power Management LLC | Lawndale, NC | Duke Energy Progress East (CPLE) | 6.0 GWh | Nov 2012 | Dec 2024 | Solar |
| Moorings Farm | Strata Manager, LLC | New Hope, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Aug 2013 | Dec 2024 | Solar |
| Bolton Farm | Strata Manager, LLC | Warrenton, NC | Duke Energy Progress East (CPLE) | 9.1 GWh | Jun 2013 | Dec 2024 | Solar |
| Van Buren | Van Buren Solar, LLC | Roseboro, NC | Duke Energy Progress East (CPLE) | 2.4 GWh | Feb 2021 | Dec 2024 | Solar |
| Old Cedar Solar Energy Storage | North Carolina El Member Corp | Asheboro, NC | Duke Energy Progress East (CPLE) | 1.8 GWh | Jul 2021 | Dec 2024 | Solar |
| Bo Biggs Solar | Bo Biggs Solar, LLC | Lumberton, NC | Duke Energy Progress East (CPLE) | 9.4 GWh | Nov 2018 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |