Orion II Solar Project
6760 County Road 273, Rosebud, TX 76570Plant Summary Information
Orion II Solar Project is ranked #29 out of 219 solar farms in Texas in terms of total annual net electricity generation.
Orion II Solar Project generated 119.8 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Orion II Solar Project |
|---|---|
| Utility Name | Ben Milam Solar 2 LLC |
| Location | Milam County, TX |
| Initial Operation Date | September 2024 |
| Last Update | Mar 2026 |
| Annual Generation | 559.8 GWh |
| Annual Consumption | 2.1 M MMBtu |
| Ranked #1,229 out of 12,332 Power Plants Nationwide | |
| Ranked #85 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #242 out of 814 Texas Power Plants | |
| Ranked #29 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Orion II Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Orion II Solar Project.
Monthly Net Generation for Orion II Solar Project
Monthly Plant Fuel Consumption for Orion II Solar Project
Orion II Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Orion II Solar Project (66941) |
| Plant Address | 6760 County Road 273, Rosebud, TX 76570 |
| Utility | Ben Milam Solar 2 LLC (65852) |
| Latitude, Longitude | 31.02903, -96.93478 |
| Generation Dates on File | Oct 2024 to Mar 2026 |
| Initial Operation Date | September 2024 |
| Annual Generation | 559.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator ORN2 Details Operating September 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 250 MW |
| Summer Capacity | 250 MW |
| Winter Capacity | 250 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 317.88 MW |
| Crystalline Silicon | Yes |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Orion II Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #75 | True North Solar, LLC | Otto, TX | 568.6 GWh |
| #76 | Sun Valley Solar Project | Abbott, TX | 568.6 GWh |
| #77 | SE Athos II, LLC | Desert Center, CA | 566.9 GWh |
| #78 | Agua Caliente Solar Project | Dateland, AZ | 566.5 GWh |
| #79 | Texas Solar Nova 2 | Spur, TX | 565.5 GWh |
| #80 | Titan Solar Project | Van Horn, TX | 565.2 GWh |
| #81 | AV Solar Ranch One | Lancaster, CA | 564.4 GWh |
| #82 | SR Toombs, LLC | Vidalia, GA | 561.3 GWh |
| #83 | McFarland A Solar and Storage | Dateland, AZ | 552.9 GWh |
| #84 | Golden Field Solar III, LLC | Rosamond, CA | 538.9 GWh |
| #86 | Fort Bend Solar LLC | East Bernard, TX | 558.5 GWh |
| #87 | Oxbow Solar 1 | New Roads, LA | 556.4 GWh |
| #88 | Desert Sunlight 250, LLC | Desert Center, CA | 555.7 GWh |
| #89 | Orion III Solar Project | Buckholts, TX | 553.9 GWh |
| #90 | Dodge Flat | Reno, NV | 546.6 GWh |
| #91 | Taygete Energy Project LLC | Coyanosa, TX | 545.8 GWh |
| #92 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 530.5 GWh |
| #93 | Stampede Solar Hybrid | Saltillo, TX | 532.1 GWh |
| #94 | Daggett 2 | Daggett, CA | 523.5 GWh |
| #95 | Galloway 1 Solar Farm | Paint Rock, TX | 536.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Orion II Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Big Elm Solar | Troy, TX | 480.4 GWh | 18.4 mi |
| Blevins Solar & Storage | TX | 124.0 GWh | 19.4 mi |
| BPL Crown Solar LLC | Chilton, TX | 215.9 GWh | 23.6 mi |
| BPL Sol Solar LLC | Chilton, TX | 212.6 GWh | 23.6 mi |
| BT Jungmann | Buckholts, TX | 85.9 GWh | 11.3 mi |
| Copperhead Solar, LLC | Riesel, TX | 290.3 GWh | 29.4 mi |
| Eddy II | Eddy, TX | 16.6 GWh | 26.4 mi |
| Five Wells Solar Center - Hybrid | Rogers, TX | 731.4 GWh | 19.3 mi |
| HEB00182 | Temple, TX | 217.0 MWh | 26 mi |
| HEBTEMDistCenter | Temple, TX | 618.0 MWh | 26.6 mi |
| HEBTEMDistCenter1B | Temple, TX | 309.0 MWh | 26.6 mi |
| HEBTEMDistCenter2A | Temple, TX | 309.0 MWh | 26.6 mi |
| Major Oak Power | Bremond, TX | 2.1 TWh | 14.8 mi |
| Marlin Solar | Marlin, TX | 9.9 GWh | 18.1 mi |
| Oak Grove (TX) | Franklin, TX | 10.9 TWh | 28.5 mi |
| OCI Stillhouse Solar | Rogers, TX | 152.4 GWh | 14.3 mi |
| Orion I Solar Project | Burlington, TX | 450.5 GWh | 4.5 mi |
| Orion III Solar Project | Buckholts, TX | 553.9 GWh | 12.2 mi |
| Temple Power Station | Temple, TX | 8.0 TWh | 22.7 mi |
| WAL6929 | Temple, TX | 271.0 MWh | 29 mi |