Big Star Solar, LLC (Hybrid)
TBD, Rosanky, TX 78953Plant Summary Information
Big Star Solar, LLC (Hybrid) is ranked #68 out of 215 solar farms in Texas in terms of total annual net electricity generation.
Big Star Solar, LLC (Hybrid) generated 85.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Big Star Solar, LLC (Hybrid) |
|---|---|
| Utility Name | Big Sky Wind, LLC |
| Location | Bastrop County, TX |
| Initial Operation Date | Not Available |
| Last Update | Dec 2025 |
| Annual Generation | 372.1 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,693 out of 12,613 Power Plants Nationwide | |
| Ranked #187 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #331 out of 816 Texas Power Plants | |
| Ranked #68 out of 215 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
RWE Renewables Americas LLC (2020 to 2021) RWE Renewables Americas, LLC (2022 to 2023) Big Sky Wind, LLC (2024 to 2024) |
Map of Big Star Solar, LLC (Hybrid)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Big Star Solar, LLC (Hybrid).
Monthly Net Generation for Big Star Solar, LLC (Hybrid)
Monthly Plant Fuel Consumption for Big Star Solar, LLC (Hybrid)
Big Star Solar, LLC (Hybrid) Details
| Summary Information | |
|---|---|
| Plant Name | Big Star Solar, LLC (Hybrid) (64202) |
| Plant Address | TBD, Rosanky, TX 78953 |
| Utility | Big Sky Wind, LLC (56215) |
| Latitude, Longitude | 29.89405, -97.27054 |
| Generation Dates on File | Jan 2025 to Dec 2025 |
| Initial Operation Date | Not Available |
| Annual Generation | 372.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Austin Energy (1015) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | Yes |
Big Star Solar, LLC (Hybrid) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #177 | Cavalry Solar Hybrid | Monon, IN | 373.6 GWh |
| #178 | Castle Gap Solar Hybrid | McCarney, TX | 384.2 GWh |
| #179 | Madison Fields Solar Project, LLC | Irwin, OH | 381.0 GWh |
| #180 | Prairie Wolf Solar LLC | Ashmore Township, IL | 379.6 GWh |
| #181 | Montague Solar | Arlington, OR | 379.2 GWh |
| #182 | Indiana Crossroads Solar Park | Reynolds, IN | 378.9 GWh |
| #183 | Dry Lake Solar Energy Center | Moapa, NV | 362.3 GWh |
| #184 | RE Roserock | Fort Stockton, TX | 378.0 GWh |
| #185 | Rambler | San Angelo, TX | 376.9 GWh |
| #186 | Raceway Solar & Storage | Lancaster, CA | 368.1 GWh |
| #188 | Grant County | Town of Potosi, WI | 376.2 GWh |
| #189 | Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh |
| #190 | Edwards Sanborn E1B | Mojave, CA | 354.7 GWh |
| #191 | Long Lake Solar, LLC | West Helena, AR | 371.4 GWh |
| #192 | Zier Solar | Brackettville, TX | 364.4 GWh |
| #193 | Blythe Solar III, LLC Hybrid | Blythe, CA | 354.6 GWh |
| #194 | Maverick Solar, LLC | Desert Center, CA | 369.7 GWh |
| #195 | Corazon Energy LLC | Rachito Las Lomas, TX | 369.1 GWh |
| #196 | Lund Hill Solar | Bickleton, WA | 367.3 GWh |
| #197 | Twiggs Solar | Dry Branch, GA | 366.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Big Star Solar, LLC (Hybrid).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 7V Solar Ranch | Muldoon, TX | 501.3 GWh | 13.2 mi |
| ABIA Parking Structure | Austin, TX | 3.2 GWh | 32.1 mi |
| Austin | Austin, TX | 4.1 GWh | 41.3 mi |
| Austin Gas Recovery | Austin, TX | 32.2 GWh | 37 mi |
| Bastrop Energy Center | Cedar Creek, TX | 2.3 TWh | 24.1 mi |
| East Blackland Solar Project 1 | Manor, TX | 277.3 GWh | 38.2 mi |
| Fayette Power Project | La Grange, TX | 8.5 TWh | 31.2 mi |
| Hal C Weaver Power Plant | Austin, TX | 361.2 GWh | 38.8 mi |
| Hays Energy Project | San Marcos, TX | 5.3 TWh | 43.8 mi |
| Lost Pines 1 Power Project | Bastrop, TX | 2.6 TWh | 17.5 mi |
| Mesquite Creek LFGTE Project | New Braunfels, TX | 23.9 GWh | 46.4 mi |
| Niagara Bottling - Seguin | Seguin, TX | 8.0 GWh | 47.3 mi |
| PowerFin Kingsbery | Austin, TX | 3.3 GWh | 35.7 mi |
| Rio Nogales Power Project | Seguin, TX | 4.1 TWh | 47 mi |
| Robert Mueller Energy Center | Austin, TX | 32.2 GWh | 38.6 mi |
| Sand Hill | Austin, TX | 2.0 TWh | 29.9 mi |
| Sim Gideon | Bastrop, TX | 1.0 TWh | 17.4 mi |
| Stoneridge Solar, LLC | Thorndale, TX | 40.8 GWh | 47.6 mi |
| Webberville Solar Project | Manor, TX | 56.3 GWh | 27.7 mi |
| Winchester Power Park | Winchester, TX | 51.5 GWh | 18.9 mi |