Orion I Solar Project
8483 N US Highway 77, Burlington, TX 76519Plant Summary Information
Orion I Solar Project is ranked #63 out of 184 solar farms in Texas in terms of total annual net electricity generation.
Orion I Solar Project generated 90.7 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Orion I Solar Project |
---|---|
Utility Name | Ben Milam Solar 1 LLC |
Location | Milam County, TX |
Initial Operation Date | Not Available |
Last Update | Mar 2025 |
Annual Generation | 284.1 GWh |
Annual Consumption | 969.4 k MMBtu |
Ranked #1,940 out of 11,623 Power Plants Nationwide | |
Ranked #206 out of 5,666 Solar Power Plants Nationwide | |
Ranked #360 out of 769 Texas Power Plants | |
Ranked #63 out of 184 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Orion I Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Orion I Solar Project.
Monthly Net Generation for Orion I Solar Project
Orion I Solar Project Details
Summary Information | |
---|---|
Plant Name | Orion I Solar Project (66859) |
Plant Address | 8483 N US Highway 77, Burlington, TX 76519 |
Utility | Ben Milam Solar 1 LLC (65788) |
Latitude, Longitude | 30.99651, -97.00151 |
Generation Dates on File | Aug 2024 to Mar 2025 |
Initial Operation Date | Not Available |
Annual Generation | 284.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage |
Orion I Solar Project Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#196 | River Ferry Solar 1 | West Union, IL | 295.4 GWh |
#197 | Battle Mountain Solar Project | Battle Mountain, NV | 292.9 GWh |
#198 | Mesquite Solar 2, LLC | Tonopah, AZ | 293.4 GWh |
#199 | Valentine Solar, LLC | Rosamond, CA | 292.3 GWh |
#200 | Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh |
#201 | Rowland Solar II | Richmond, TX | 289.5 GWh |
#202 | Double Back Diamond | Virden, IL | 289.0 GWh |
#203 | Hudson - High Desert Hybrid | Victorville, CA | 280.3 GWh |
#204 | ANSON Solar Center, LLC | Anson, TX | 287.5 GWh |
#205 | Hardin Solar Energy LLC | Alger, OH | 286.6 GWh |
#207 | Fighting Jays Solar Project | Needville, TX | 282.9 GWh |
#208 | West Line Solar, LLC | City of Eloy, AZ | 279.6 GWh |
#209 | Central Line Solar, LLC | Coolidge, AZ | 279.1 GWh |
#210 | Colonial Trail West | Spring Grove, VA | 278.8 GWh |
#211 | Boulder Solar Power, LLC | Boulder City, NV | 278.4 GWh |
#212 | Emerald Grove | Crane, TX | 277.8 GWh |
#213 | Saint Solar | Coolidge, AZ | 277.6 GWh |
#214 | Imperial Solar Energy Center South | Calexico, CA | 277.2 GWh |
#215 | Wood County | Nekoosa, WI | 276.9 GWh |
#216 | Hunter Solar LLC (UT) | Clawson, UT | 273.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Orion I Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Elm Solar | TX | 96.9 GWh | 16.2 mi |
BPL Crown Solar LLC | Chilton, TX | 196.9 GWh | 24.7 mi |
BPL Sol Solar LLC | Chilton, TX | 192.2 GWh | 24.7 mi |
BT Jungmann | TX | 13.9 GWh | 7.2 mi |
Copperhead Solar, LLC | Riesel, TX | 152.5 GWh | 32.4 mi |
Eddy II | Eddy, TX | 16.2 GWh | 25.5 mi |
Five Wells Solar Center - Hybrid | Rogers, TX | 719.8 GWh | 15.3 mi |
Gransolar Texas One, LLC | TX | 13.5 GWh | 28.9 mi |
Griffin Solar | Robinson, TX | 11.3 GWh | 34 mi |
HEB00182 | Temple, TX | 298.0 MWh | 22.5 mi |
Major Oak Power | Bremond, TX | 2.3 TWh | 19.3 mi |
Marlin Solar | Marlin, TX | 10.3 GWh | 21.4 mi |
Oak Grove (TX) | Franklin, TX | 11.5 TWh | 33 mi |
Orion II Solar Project | Rosebud, TX | 228.6 GWh | 4.5 mi |
Orion III Solar Project | Buckholts, TX | 347.2 GWh | 7.7 mi |
Panda Temple Power Station | Temple, TX | 7.3 TWh | 19.1 mi |
Roseland Solar Project, LLC | Riesel, TX | 969.6 GWh | 33.8 mi |
Sandy Creek Energy Station | Riesel, TX | 3.3 TWh | 33.1 mi |
WAL1232 | Belton, TX | 328.0 MWh | 27.6 mi |
WAL6929 | Temple, TX | 296.0 MWh | 25.8 mi |