Old 300 Solar Center, LLC
102 JC Wicks Rd., Needville, TX 77461Plant Summary Information
Old 300 Solar Center, LLC is ranked #12 out of 6,487 solar farms nationwide in terms of total annual net electricity generation.
Old 300 Solar Center, LLC generated 157.4 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Old 300 Solar Center, LLC |
|---|---|
| Utility Name | Old 300 Solar Center, LLC |
| Location | Fort Bend County, TX |
| Initial Operation Date | October 2024 |
| Last Update | Feb 2026 |
| Annual Generation | 939.4 GWh |
| Annual Consumption | 3.4 M MMBtu |
| Ranked #776 out of 12,637 Power Plants Nationwide | |
| Ranked #12 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #129 out of 820 Texas Power Plants | |
| Ranked #8 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Old 300 Solar Center, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Old 300 Solar Center, LLC.
Monthly Net Generation for Old 300 Solar Center, LLC
Monthly Plant Fuel Consumption for Old 300 Solar Center, LLC
Old 300 Solar Center, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Old 300 Solar Center, LLC (64133) |
| Plant Address | 102 JC Wicks Rd., Needville, TX 77461 |
| Utility | Old 300 Solar Center, LLC (63755) |
| Latitude, Longitude | 29.33355, -95.82544 |
| Generation Dates on File | Jan 2024 to Feb 2026 |
| Initial Operation Date | October 2024 |
| Annual Generation | 939.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator 2222 Details Operating October 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 430 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 430 MW |
| Winter Capacity | 430 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 539.61 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Old 300 Solar Center, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2 | Hornet Solar (TX) | Tulia, TX | 1.4 TWh |
| #3 | Hecate Energy Frye Solar LLC | Kress, TX | 1.3 TWh |
| #4 | Fox Squirrel Solar | Mt Sterling, OH | 1.2 TWh |
| #5 | Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh |
| #6 | Roseland Solar Project, LLC | Riesel, TX | 1.1 TWh |
| #7 | Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh |
| #8 | Topaz Solar Farm | Santa Margarita, CA | 1.0 TWh |
| #9 | 2W Permian Solar Project Hybrid | Andrews, TX | 1.0 TWh |
| #10 | Aktina Solar | El Campo, TX | 1.0 TWh |
| #11 | Mockingbird Solar Center | Brookston, TX | 943.5 GWh |
| #13 | Waco Solar | Mt Calm, TX | 915.1 GWh |
| #14 | Eagle Shadow Mountain Solar Farm | Moapa, NV | 893.1 GWh |
| #15 | Solar Star 1 | Rosamond, CA | 888.2 GWh |
| #16 | Double Back Diamond | Virden, IL | 887.5 GWh |
| #17 | Daggett 3 | Daggett, CA | 859.8 GWh |
| #18 | Solana Generating Station | Gila Bend, AZ | 853.4 GWh |
| #19 | Desert Quartzite | Blythe, CA | 830.4 GWh |
| #20 | Greasewood II LLC | Girvin, TX | 846.1 GWh |
| #21 | Eleven Mile Solar Center | Coolidge, AZ | 791.1 GWh |
| #22 | Dunns Bridge II Solar | San Pierre, IN | 811.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Old 300 Solar Center, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bernard Creek Solar | Hungerford, TX | 514.0 GWh | 17.9 mi |
| Braes Bayou Plant | Richmond, TX | 190.1 GWh | 16 mi |
| Brazoria County Solar Project (Danciger) | Damon, TX | 435.0 GWh | 11.4 mi |
| Brazoria West | Damon, TX | 429.4 GWh | 13.9 mi |
| Bronson | Beasley, TX | 9.6 GWh | 16.5 mi |
| Cascade Solar (TX) | Wharton, TX | 17.3 GWh | 14.9 mi |
| Colorado Bend Energy Center | Wharton, TX | 2.1 TWh | 15 mi |
| Colorado Bend II | Wharton, TX | 6.0 TWh | 14.8 mi |
| Cutlass Solar 1 LLC | Richmond, TX | 173.8 GWh | 7.6 mi |
| Cutlass Solar II | Richmond, TX | 437.1 GWh | 4.8 mi |
| Fighting Jays Solar Project | Needville, TX | 472.1 GWh | 5.1 mi |
| Jack Fusco Energy Center | Thompsons, TX | 3.8 TWh | 15.5 mi |
| Lane City Wind | Lane City, TX | 227.1 GWh | 15 mi |
| Long Point Solar | Damon, TX | 29.0 GWh | 10.9 mi |
| Newgulf Cogen | NewGulf, TX | 12.7 GWh | 6.6 mi |
| Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.8 GWh | 15.1 mi |
| Second Division Solar | West Columbia, TX | 194.8 GWh | 12.3 mi |
| W A Parish | Thompsons, TX | 15.2 TWh | 15.6 mi |
| Wagyu | Damon, TX | 241.4 GWh | 11.9 mi |
| WAL546 | Richmond, TX | 178.0 MWh | 16 mi |