Old 300 Solar Center, LLC
102 JC Wicks Rd., Needville, TX 77461Plant Summary Information
Old 300 Solar Center, LLC is ranked #9 out of 6,400 solar farms nationwide in terms of total annual net electricity generation.
Old 300 Solar Center, LLC generated 297.1 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Old 300 Solar Center, LLC |
|---|---|
| Utility Name | Old 300 Solar Center, LLC |
| Location | Fort Bend County, TX |
| Initial Operation Date | October 2024 |
| Last Update | Sep 2025 |
| Annual Generation | 984.2 GWh |
| Annual Consumption | 3.6 M MMBtu |
| Ranked #748 out of 12,539 Power Plants Nationwide | |
| Ranked #9 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #124 out of 799 Texas Power Plants | |
| Ranked #4 out of 201 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Old 300 Solar Center, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Old 300 Solar Center, LLC.
Monthly Net Generation for Old 300 Solar Center, LLC
Old 300 Solar Center, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Old 300 Solar Center, LLC (64133) |
| Plant Address | 102 JC Wicks Rd., Needville, TX 77461 |
| Utility | Old 300 Solar Center, LLC (63755) |
| Latitude, Longitude | 29.33355, -95.82544 |
| Generation Dates on File | Jan 2024 to Sep 2025 |
| Initial Operation Date | October 2024 |
| Annual Generation | 984.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator 2222 Details Operating October 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 430 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 430 MW |
| Winter Capacity | 430 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 539.61 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Old 300 Solar Center, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1 | Gemini Solar Hybrid | Unincorporated, NV | 2.2 TWh |
| #2 | Hecate Energy Frye Solar LLC | Kress, TX | 1.3 TWh |
| #3 | Fox Squirrel Solar | Mt Sterling, OH | 1.1 TWh |
| #4 | Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh |
| #5 | Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh |
| #6 | Roseland Solar Project, LLC | Riesel, TX | 1.0 TWh |
| #7 | Topaz Solar Farm | Santa Margarita, CA | 1.0 TWh |
| #8 | Double Back Diamond | Virden, IL | 994.9 GWh |
| #10 | 2W Permian Solar Project Hybrid | Andrews, TX | 974.1 GWh |
| #11 | Mockingbird Solar Center | Brookston, TX | 936.0 GWh |
| #12 | Waco Solar | Mt Calm, TX | 920.5 GWh |
| #13 | Aktina Solar | El Campo, TX | 914.3 GWh |
| #14 | Hornet Solar (TX) | Tulia, TX | 911.5 GWh |
| #15 | Eagle Shadow Mountain Solar Farm | Moapa, NV | 905.2 GWh |
| #16 | Solar Star 1 | Rosamond, CA | 897.7 GWh |
| #17 | Daggett 3 | Daggett, CA | 877.7 GWh |
| #18 | Solana Generating Station | Gila Bend, AZ | 859.3 GWh |
| #19 | Eleven Mile Solar Center | Coolidge, AZ | 800.0 GWh |
| #20 | Greasewood II LLC | Girvin, TX | 797.6 GWh |
| #21 | Desert Quartzite | Blythe, CA | 755.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Old 300 Solar Center, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bernard Creek Solar | Hungerford, TX | 498.7 GWh | 17.9 mi |
| Braes Bayou Plant | Richmond, TX | 224.8 GWh | 16 mi |
| Brazoria County Solar Project (Danciger) | Damon, TX | 423.6 GWh | 11.4 mi |
| Brazoria West | Damon, TX | 426.8 GWh | 13.9 mi |
| Bronson | Beasley, TX | 9.6 GWh | 16.5 mi |
| Cascade Solar (TX) | Wharton, TX | 17.3 GWh | 14.9 mi |
| Colorado Bend Energy Center | Wharton, TX | 2.2 TWh | 15 mi |
| Colorado Bend II | Wharton, TX | 6.3 TWh | 14.8 mi |
| Cutlass Solar 1 LLC | Richmond, TX | 171.2 GWh | 7.6 mi |
| Cutlass Solar II | Richmond, TX | 411.9 GWh | 4.8 mi |
| Fighting Jays Solar Project | Needville, TX | 403.5 GWh | 5.1 mi |
| Fort Bend Solar LLC | East Bernard, TX | 497.5 GWh | 18.2 mi |
| Jack Fusco Energy Center | Thompsons, TX | 3.4 TWh | 15.5 mi |
| Newgulf Cogen | NewGulf, TX | 12.7 GWh | 6.6 mi |
| Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.8 GWh | 15.1 mi |
| Second Division Solar | West Columbia, TX | 164.2 GWh | 12.3 mi |
| Sweeny Cogen Facility | Old Ocean, TX | 3.3 TWh | 18.7 mi |
| W A Parish | Thompsons, TX | 15.4 TWh | 15.6 mi |
| Wagyu | Damon, TX | 232.0 GWh | 11.9 mi |
| WAL546 | Richmond, TX | 178.0 MWh | 16 mi |