Azure Sky Wind Project, LLC Hybrid
121 2201, Throckmorton, TX 76483Plant Summary Information
Azure Sky Wind Project, LLC Hybrid is ranked #29 out of 1,376 wind farms nationwide in terms of total annual net electricity generation.
Azure Sky Wind Project, LLC Hybrid generated 326.3 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Azure Sky Wind Project, LLC Hybrid |
|---|---|
| Utility Name | Azure Sky Wind Project, LLC |
| Location | Throckmorton County, TX |
| Initial Operation Date | September 2023 |
| Last Update | Feb 2026 |
| Annual Generation | 1.2 TWh |
| Annual Consumption | 4.5 M MMBtu |
| Ranked #660 out of 12,637 Power Plants Nationwide | |
| Ranked #29 out of 1,376 Wind Power Plants Nationwide | |
| Ranked #102 out of 820 Texas Power Plants | |
| Ranked #13 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Azure Sky Wind Project, LLC Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Azure Sky Wind Project, LLC Hybrid.
Monthly Net Generation for Azure Sky Wind Project, LLC Hybrid
Monthly Plant Fuel Consumption for Azure Sky Wind Project, LLC Hybrid
Azure Sky Wind Project, LLC Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Azure Sky Wind Project, LLC Hybrid (64164) |
| Plant Address | 121 2201, Throckmorton, TX 76483 |
| Utility | Azure Sky Wind Project, LLC (63784) |
| Latitude, Longitude | 33.16914, -99.26601 |
| Generation Dates on File | Apr 2023 to Feb 2026 |
| Initial Operation Date | September 2023 |
| Annual Generation | 1.2 TWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | Yes |
Generator ASWBE Details Operating April 2024
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 120 MW |
| Summer Capacity | 120 MW |
| Winter Capacity | 120 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 190 |
|---|---|
| Maximum Charge Rate | 121.8 MW |
| Maximum Discharge Rate | 121.8 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 195.5 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Frequency Regulation | Yes |
| Voltage Or Reactive Power Support | Yes |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Generator ASWWT Details Operating August 2024
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 350.2 MW |
| Summer Capacity | 350.2 MW |
| Winter Capacity | 350.2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 79 |
| Time From Cold Shutdown To Full Load | 1H |
| Turbine Details | |
| Number Of Turbines | 79 |
|---|---|
| Predominant Turbine Manufacturer | Nordex |
| Predominant Turbine Model Number | N149/4.0-4.5 |
| Design Wind Speed | 16.7 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 354.3 |
Azure Sky Wind Project, LLC Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #19 | Highland Wind Project (IA) | Primghar, IA | 1.4 TWh |
| #20 | High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.3 TWh |
| #21 | Clearwater Wind I | Miles City, MT | 1.3 TWh |
| #22 | North English | Montezuma, IA | 1.3 TWh |
| #23 | Grande Prairie Wind Farm | O'Neill, NE | 1.3 TWh |
| #24 | Lacy Creek Wind Energy Center | Sterling City, TX | 1.3 TWh |
| #25 | Cedar Springs Wind IV | Douglas, WY | 1.3 TWh |
| #26 | Inertia Wind Project | Haskell, TX | 1.3 TWh |
| #27 | Iron Star Wind Project | Dodge City, KS | 1.2 TWh |
| #28 | Santa Rita East | Barnhart, TX | 1.2 TWh |
| #30 | Jordan Creek Wind Farm, LLC | Judyville, IN | 1.2 TWh |
| #31 | Beaver Creek Wind | Ogden, IA | 1.2 TWh |
| #32 | Boswell Wind | Rock River, WY | 1.2 TWh |
| #33 | Red Cloud Wind LLC | Corona, NM | 1.2 TWh |
| #34 | Seven Cowboy Wind Project, LLC | Gage, OK | 1.2 TWh |
| #35 | Tahoka Wind | Tahoka, TX | 1.2 TWh |
| #36 | Sage Draw Wind | Wilson, TX | 1.2 TWh |
| #37 | Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh |
| #38 | Mesquite Star | Roscoe, TX | 1.2 TWh |
| #39 | Foard City Wind | Crowell, TX | 1.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Azure Sky Wind Project, LLC Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ANSON Solar Center, LLC | Anson, TX | 509.5 GWh | 45.1 mi |
| Azure Sky Solar | Haskell, TX | 526.8 GWh | 22.6 mi |
| Bobcat Bluff Wind Project LLC | Archer, TX | 462.3 GWh | 45.4 mi |
| Diversion Wind Energy LLC | Seymour, TX | 738.1 GWh | 40.5 mi |
| Graham | Graham, TX | 1.0 TWh | 37.9 mi |
| Green Pastures Wind I | Seymour, TX | 277.5 GWh | 32.8 mi |
| Green Pastures Wind II | Seymour, TX | 291.1 GWh | 36.4 mi |
| Griffin Trail Wind | E Seymour, TX | 694.1 GWh | 35.5 mi |
| Hackberry Wind Farm | Albany, TX | 325.7 GWh | 29.1 mi |
| Horse Creek Wind Farm | Weinert, TX | 811.9 GWh | 20.2 mi |
| Inertia Wind Project | Haskell, TX | 1.3 TWh | 19.1 mi |
| King Creek Wind Farm 1, LLC | Throckmorton, TX | 567.1 GWh | 13.5 mi |
| King Creek Wind Farm 2, LLC | Throckmorton, TX | 657.8 GWh | 7.2 mi |
| Mesquite Wind Power LLC | Abilene, TX | 347.1 GWh | 39.8 mi |
| Millers Branch Solar | TX | 37.5 GWh | 18.9 mi |
| OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh | 18.8 mi |
| Seymour Hills Wind Project, LLC | Seymour, TX | 120.4 GWh | 28.6 mi |
| Trinity Hills | Olney, TX | 781.4 GWh | 35.3 mi |
| Willow Springs Wind Farm | Weinert, TX | 868.0 GWh | 24 mi |
| Young Wind | Graham, TX | 1.6 TWh | 24.2 mi |