C R Wing Cogen Plant
500 Refinery Road, Big Spring, TX 79720Plant Summary Information
C R Wing Cogen Plant is ranked #135 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.
C R Wing Cogen Plant is comprised of 3 generators and generated 69.6 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | C R Wing Cogen Plant |
|---|---|
| Utility Name | BHER Power Resources, Inc |
| Location | Howard County, TX |
| Initial Operation Date | July 1987 |
| Last Update | Dec 2024 |
| Annual Generation | 133.7 GWh |
| Annual Consumption | 1.7 M MMBtu |
| Ranked #3,048 out of 12,539 Power Plants Nationwide | |
| Ranked #837 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #473 out of 799 Texas Power Plants | |
| Ranked #135 out of 314 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
Power Resources Ltd (2013 to 2017) BHER Power Resources, Inc (2018 to 2024) |
Map of C R Wing Cogen Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for C R Wing Cogen Plant.
Monthly Net Generation for C R Wing Cogen Plant
C R Wing Cogen Plant Details
| Summary Information | |
|---|---|
| Plant Name | C R Wing Cogen Plant (52176) |
| Plant Address | 500 Refinery Road, Big Spring, TX 79720 |
| Utility | BHER Power Resources, Inc (15300) |
| Latitude, Longitude | 32.27318, -101.42239 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | July 1987 |
| Annual Generation | 133.7 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 03-22-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP CHP (3) |
| Water Source | Colo.River Municipal Water Dis |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | ONEOK WES TEX TRANSMISSION LLC |
| Natural Gas Storage | No |
Generator GEN1 Details Operating July 1987
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | FLCNS_CC1 |
| Nameplate Capacity | 77.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 71 MW |
| Winter Capacity | 71 MW |
| Minimum Load | 45 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1987 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating July 1987
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | FLCNS-CC1 |
| Nameplate Capacity | 77.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 71 MW |
| Winter Capacity | 71 MW |
| Minimum Load | 45 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1987 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GEN3 Details Operating April 1988
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| RTO ISO LMP Node Designation | FLCNS-CC1 |
| Nameplate Capacity | 75 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 70 MW |
| Winter Capacity | 70 MW |
| Minimum Load | 40 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 1988 |
| Combined Heat & Power | Yes |
| Sector Name | IPP CHP (3) |
| Topping Or Bottoming | B |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
C R Wing Cogen Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #827 | PSEG Kearny Generating Station | Kearny, NJ | 141.1 GWh |
| #828 | San Jacinto County Peaking Facility | Shepherd, TX | 139.6 GWh |
| #829 | Berry Cogen Tanne Hills 18 | Maricopa, CA | 139.3 GWh |
| #830 | Stillwater Energy Center | Stillwater, OK | 138.8 GWh |
| #831 | Seminole Mill | Jacksonville, FL | 138.7 GWh |
| #832 | Sentinel Energy Center, LLC | Desert Hot Springs, CA | 138.5 GWh |
| #833 | Saguaro | Red Rock, AZ | 135.2 GWh |
| #834 | Rand Whitney CHP Plant | Montville, CT | 134.9 GWh |
| #835 | Chino Mines | Hurley, NM | 133.9 GWh |
| #836 | Oxnard Paper Mill | Oxnard, CA | 133.9 GWh |
| #838 | Cleary Flood Hybrid | Taunton, MA | 132.5 GWh |
| #839 | Klamath Expansion Project | Klamath Falls, OR | 132.3 GWh |
| #840 | Lockport Energy Associates LP | Lockport, NY | 132.0 GWh |
| #841 | Wheatland Generating Facility | Wheatland, IN | 131.1 GWh |
| #842 | Springdale 1 & 2 | Springdale, PA | 130.9 GWh |
| #843 | Riverbay | New York, NY | 130.1 GWh |
| #844 | International Paper Prattville Mill | Prattville, AL | 560.6 GWh |
| #845 | Darbytown | Richmond, VA | 144.6 GWh |
| #846 | Algonquin Windsor Locks | Windsor Locks, CT | 125.2 GWh |
| #847 | Solway CT | Solway, MN | 124.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding C R Wing Cogen Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bearkat | St. Lawrence, TX | 673.1 GWh | 38.9 mi |
| Big Spring Wind Power Facility | Big Spring, TX | 56.0 GWh | 5 mi |
| Canyon Wind Project, LLC | Scurry, TX | 1.1 TWh | 34.6 mi |
| Capricorn Ridge Wind LLC | Sterling City, TX | 2.0 TWh | 32.4 mi |
| Elbow Creek Wind Project LLC | Forsan, TX | 376.7 GWh | 9.3 mi |
| ENGIE Long Draw Solar LLC | Gail, TX | 517.0 GWh | 34.4 mi |
| Forest Creek Wind Farm LLC | Big Springs, TX | 180.9 GWh | 20 mi |
| Gunsight Mountain Wind Energy LLC | Big Spring, TX | 460.7 GWh | 3.8 mi |
| Highpeak Solar 1 | Coahoma, TX | 13.8 GWh | 17.5 mi |
| Juno Solar Project | Lamesa, TX | 767.8 GWh | 34.6 mi |
| Lacy Creek Wind Energy Center | Sterling City, TX | 1.2 TWh | 38.2 mi |
| Mesquite Creek Wind | Lamesa, TX | 533.3 GWh | 34.9 mi |
| Morgan Creek | Colorado City, TX | 23.5 GWh | 29.9 mi |
| Ocotillo Windpower | Forsan, TX | 80.9 GWh | 10.7 mi |
| Panther Creek Wind Farm I | Big Spring, TX | 528.8 GWh | 12 mi |
| Panther Creek Wind Farm II | Big Spring, TX | 402.1 GWh | 24.4 mi |
| Panther Creek Wind Farm Three | Big Spring, TX | 706.2 GWh | 26.4 mi |
| Rattlesnake Den | Garden City, TX | 703.8 GWh | 36.9 mi |
| Sand Bluff Wind Farm | Big Spring, TX | 318.2 GWh | 20.7 mi |
| Stanton Wind Energy LLC | Lenorah, TX | 253.9 GWh | 24.4 mi |