Pitts Dudik Solar
404 HCR 3309, Hubbard, TX 76648Plant Summary Information
Pitts Dudik Solar is ranked #117 out of 191 solar farms in Texas in terms of total annual net electricity generation.
Pitts Dudik Solar generated 28.8 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Pitts Dudik Solar |
---|---|
Utility Name | Elawan Pitts Dudik Solar, LLC |
Location | Hill County, TX |
Initial Operation Date | November 2023 |
Last Update | May 2025 |
Annual Generation | 109.0 GWh |
Annual Consumption | 400.7 k MMBtu |
Ranked #3,214 out of 12,312 Power Plants Nationwide | |
Ranked #689 out of 6,191 Solar Power Plants Nationwide | |
Ranked #472 out of 796 Texas Power Plants | |
Ranked #117 out of 191 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Pitts Dudik Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pitts Dudik Solar.
Monthly Net Generation for Pitts Dudik Solar
Pitts Dudik Solar Details
Summary Information | |
---|---|
Plant Name | Pitts Dudik Solar (67024) |
Plant Address | 404 HCR 3309, Hubbard, TX 76648 |
Utility | Elawan Pitts Dudik Solar, LLC (65915) |
Latitude, Longitude | 31.8932, -96.8751 |
Generation Dates on File | Aug 2023 to May 2025 |
Initial Operation Date | November 2023 |
Annual Generation | 109.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | eg23-136-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator PTSDK Details Operating November 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 49.6 MW |
Nameplate Power Factor | 0.88 |
Summer Capacity | 49.6 MW |
Winter Capacity | 49.6 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2023 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Other Solar Technology | No |
Tilt Angle | 60 |
DC Net Capacity | 56.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pitts Dudik Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#679 | BT Cooke Solar, LLC | Gainsville, TX | 112.5 GWh |
#680 | Pioneer Trail Solar Energy Center | New Smyrna Beach, FL | 112.3 GWh |
#681 | SEGS IX | Hinkley, CA | 112.0 GWh |
#682 | Borden Solar Farm | Madera, CA | 112.0 GWh |
#683 | Iris Solar LLC | Franklinton, LA | 111.4 GWh |
#684 | Little Manatee River Solar | Ruskin, FL | 111.3 GWh |
#685 | Landrace Holdings, LLC | Conway, SC | 111.2 GWh |
#686 | Midway Solar Farm 1 | Calipatria, CA | 111.0 GWh |
#687 | Bayou Galion Solar Project | Mer Rouge, LA | 110.7 GWh |
#688 | Kellam Solar | Ben Wheeler, TX | 109.0 GWh |
#690 | Clearview Solar 1 | Quincy, OH | 108.6 GWh |
#691 | Gilchrist County Solar | Newberry, FL | 108.5 GWh |
#692 | Castle Solar, LLC | Huntington, UT | 108.4 GWh |
#693 | Turquoise Nevada, LLC | Sparks, NV | 108.2 GWh |
#694 | RE Gaskell West 2 LLC | Rosamond, CA | 108.0 GWh |
#695 | Columbia County Solar | Fort White, FL | 108.0 GWh |
#696 | SR Turkey Creek, LLC | Lancaster, KY | 107.6 GWh |
#697 | Grange Hall Solar | Wimauma, FL | 107.3 GWh |
#698 | Lick Creek Solar, LLC | Walnut Cove, NC | 106.9 GWh |
#699 | Glover Creek Solar, LLC | Summer Shade, KY | 106.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pitts Dudik Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BPL Files Solar | Itasca, TX | 272.8 GWh | 23.1 mi |
Briar Creek Solar 1 | Corsicana, TX | 223.8 GWh | 20.8 mi |
Copperhead Solar, LLC | Riesel, TX | 202.5 GWh | 30.6 mi |
Elm Branch Solar 1 | Bardwell, TX | 264.9 GWh | 25.4 mi |
Ennis Power Company LLC | Ennis, TX | 1.7 TWh | 31.7 mi |
Hubbard Wind | Mt Calm, TX | 976.6 GWh | 8.6 mi |
Limestone Wind Project | Coolidge, TX | 965.6 GWh | 15 mi |
Markum Solar Farm | Valley Mills, TX | 178.8 GWh | 32.4 mi |
Pisgah Ridge Solar, LLC | Richland, TX | 525.6 GWh | 23.9 mi |
Prairie Hill Wind Project | Mart, TX | 154.3 GWh | 23.8 mi |
Roseland Solar Project, LLC | Riesel, TX | 1.0 TWh | 30 mi |
Sandy Creek Energy Station | Riesel, TX | 3.2 TWh | 29.3 mi |
Sun Valley Solar Project | Abbott, TX | 560.2 GWh | 8.4 mi |
Sun Valley Storage | Abbot, TX | 3.1 GWh | 8.7 mi |
Thad Hill Energy Center | Clifton, TX | 4.3 TWh | 28.5 mi |
TPE Whitney Solar, LLC | Kopperl, TX | 16.3 GWh | 29.9 mi |
True North Solar, LLC | Otto, TX | 247.7 GWh | 29.7 mi |
Waco Solar | Mt Calm, TX | 966.4 GWh | 13.1 mi |
WAL565 | Corsicana, TX | 166.0 MWh | 31.1 mi |
Whitney | Clifton, TX | 69.4 GWh | 28.9 mi |