BKV-BPP Ponder Solar
4285 Florance Road, Ponder, TX 76259Plant Summary Information
BKV-BPP Ponder Solar is ranked #218 out of 245 solar farms in Texas in terms of total annual net electricity generation.
BKV-BPP Ponder Solar generated 1.3 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | BKV-BPP Ponder Solar |
|---|---|
| Utility Name | PPM Solar LLC |
| Location | Denton County, TX |
| Initial Operation Date | September 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 6.1 GWh |
| Annual Consumption | 21.9 k MMBtu |
| Ranked #7,771 out of 13,081 Power Plants Nationwide | |
| Ranked #3,165 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #650 out of 852 Texas Power Plants | |
| Ranked #218 out of 245 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of BKV-BPP Ponder Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for BKV-BPP Ponder Solar.
Monthly Net Generation for BKV-BPP Ponder Solar
Monthly Plant Fuel Consumption for BKV-BPP Ponder Solar
BKV-BPP Ponder Solar Details
| Summary Information | |
|---|---|
| Plant Name | BKV-BPP Ponder Solar (66571) |
| Plant Address | 4285 Florance Road, Ponder, TX 76259 |
| Utility | PPM Solar LLC (64743) |
| Latitude, Longitude | 33.15577, -97.25464 |
| Generation Dates on File | Aug 2024 to Dec 2025 |
| Initial Operation Date | September 2024 |
| Annual Generation | 6.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF23-397 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Denton County Elec Coop, Inc (5078) TX |
| Grid Voltage | 24.90 kV |
| Energy Storage | No |
Generator BKVP1 Details Operating September 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 3.19 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
BKV-BPP Ponder Solar Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| BKV Barnett, LLC | 1209 County Rd 1304, Bridgeport, TX 76426 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3155 | Warrenton Farm | Warrenton, NC | 6.2 GWh |
| #3156 | Bruce A Henry Solar Farm | Georgetown, DE | 6.2 GWh |
| #3157 | GSPP Boxborough Littleton (MA) | Boxborough, MA | 6.2 GWh |
| #3158 | NIST Solar | Gaithersburg, MD | 6.1 GWh |
| #3159 | NL MA - Copicut | Freetown, MA | 6.1 GWh |
| #3160 | Hamlin 1 | Hamlin, NY | 6.1 GWh |
| #3161 | DG Iron Mountain | Edison, NJ | 6.1 GWh |
| #3162 | Geneseo Solar | Geneseo, NY | 6.1 GWh |
| #3163 | SSD Clackamas 1, LLC | Boring, OR | 6.1 GWh |
| #3164 | Dresser Hill CSG | Southbridge, MA | 6.1 GWh |
| #3166 | TJX Phoenix | Phoenix, AZ | 6.1 GWh |
| #3167 | Whitakers Farm (Fisher Rd) | Whitakers, NC | 6.1 GWh |
| #3168 | Williams Rd | Ransomville, NY | 6.1 GWh |
| #3169 | Route 22 Community Solar Farm CSG | Plattsburgh, NY | 6.1 GWh |
| #3170 | Brattleboro (Windham Landfill) | Brattleboro, VT | 6.1 GWh |
| #3171 | Rak 2 | Fredonia, NY | 6.1 GWh |
| #3172 | North Kern 2 | City of Shafter, CA | 6.1 GWh |
| #3173 | SEPV Sierra | Lancaster, CA | 5.4 GWh |
| #3174 | GD Johnson Scituate I, LLC | Cranston, RI | 6.1 GWh |
| #3175 | Prescott Airport | Prescott, AZ | 6.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding BKV-BPP Ponder Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Compadre Solar | Gainsville, TX | 133.5 GWh | 20.9 mi |
| CoServ Community Solar Station | Aubrey, TX | 1.5 GWh | 17.8 mi |
| Denton Energy Center | Denton, TX | 301.0 GWh | 4.8 mi |
| Farmers Branch Renewable Energy Facility | Lewisville, TX | 17.3 GWh | 19.3 mi |
| HEB00055 | Southlake, TX | 206.0 MWh | 16.6 mi |
| HEB00789 | Frisco, TX | 223.0 MWh | 23.6 mi |
| HEB00801 | Fort Worth, TX | 227.0 MWh | 17 mi |
| Noble Solar | Krum, TX | 493.4 GWh | 7.4 mi |
| Porter Solar, LLC (TX) | Krum, TX | 504.6 GWh | 12.6 mi |
| Spencer | Denton, TX | 19.7 GWh | 9.1 mi |
| State Farm Insur Support Center Central | Irving, TX | 9.0 MWh | 22.4 mi |
| Toyota HQ Plan | Plano, TX | 6.9 GWh | 24.4 mi |
| TX Fort Worth 5200 Gold Spike Drive | Fort Worth, TX | 2.5 GWh | 23.1 mi |
| WAL266 | Grapevine, TX | 420.0 MWh | 19 mi |
| WAL2980 | Fort Worth, TX | 311.0 MWh | 18.1 mi |
| WAL3777 | Frisco, TX | 87.0 MWh | 21.5 mi |
| WAL5080 | Hurst, TX | 392.0 MWh | 21.7 mi |
| WAL5316 | Saginaw, TX | 377.0 MWh | 20.4 mi |
| WAL5764 | Fort Worth, TX | 360.0 MWh | 15.9 mi |
| WAL972 | Fort Worth, TX | 396.0 MWh | 25.7 mi |