Cottonwood Bayou Solar
5122 CR 203, Liverpool, TX 77577Plant Summary Information
Cottonwood Bayou Solar is ranked #26 out of 245 solar farms in Texas in terms of total annual net electricity generation.
Cottonwood Bayou Solar generated 122.9 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Cottonwood Bayou Solar |
|---|---|
| Utility Name | Cottonwood Bayou Solar, LLC |
| Location | Brazoria County, TX |
| Initial Operation Date | Not Available |
| Last Update | May 2026 |
| Annual Generation | 575.6 GWh |
| Annual Consumption | 2.2 M MMBtu |
| Ranked #1,189 out of 13,081 Power Plants Nationwide | |
| Ranked #75 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #233 out of 852 Texas Power Plants | |
| Ranked #26 out of 245 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Cottonwood Bayou Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cottonwood Bayou Solar.
Monthly Net Generation for Cottonwood Bayou Solar
Monthly Plant Fuel Consumption for Cottonwood Bayou Solar
Cottonwood Bayou Solar Details
| Summary Information | |
|---|---|
| Plant Name | Cottonwood Bayou Solar (66915) |
| Plant Address | 5122 CR 203, Liverpool, TX 77577 |
| Utility | Cottonwood Bayou Solar, LLC (65832) |
| Latitude, Longitude | 29.26312, -95.258 |
| Generation Dates on File | Jan 2025 to May 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 575.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Cottonwood Bayou Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #65 | Moapa Southern Paiute | Moapa, NV | 618.7 GWh |
| #66 | Arrow Canyon Solar Hybrid | Moapa, NV | 601.7 GWh |
| #67 | Copper Mountain Solar 3 | Boulder City, NV | 603.2 GWh |
| #68 | Genesis Solar Energy Project | Blythe, CA | 600.0 GWh |
| #69 | Oberon II Solar Project | Desert Center, CA | 580.5 GWh |
| #70 | Blythe Mesa Solar II | Blythe, CA | 578.3 GWh |
| #71 | Mojave Solar Project | Hinkley, CA | 592.1 GWh |
| #72 | Oberon Solar Project | Desert Center, CA | 570.1 GWh |
| #73 | Victory Pass | Desert Center, CA | 568.8 GWh |
| #74 | Ray Ranch Solar | Pettus, TX | 579.3 GWh |
| #76 | Hopkins Energy LLC | Dike, TX | 574.1 GWh |
| #77 | Sun Valley Solar Project | Abbott, TX | 568.1 GWh |
| #78 | Texas Solar Nova 2 | Spur, TX | 565.1 GWh |
| #79 | Eiffel Solar Project | Paris, TX | 564.7 GWh |
| #80 | IP Radian, LLC | Brookesmith, TX | 564.4 GWh |
| #81 | SR Toombs, LLC | Vidalia, GA | 562.0 GWh |
| #82 | Hill Solar 1 | Itasca, TX | 561.1 GWh |
| #83 | Golden Field Solar III, LLC | Rosamond, CA | 537.5 GWh |
| #84 | AV Solar Ranch One | Lancaster, CA | 560.0 GWh |
| #85 | McFarland A Solar and Storage | Dateland, AZ | 550.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cottonwood Bayou Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ascend Performance Materials Texas Inc. | Alvin, TX | 98.0 GWh | 2.9 mi |
| BASF Freeport Works | Feeeport, TX | 537.4 GWh | 19.8 mi |
| Brazoria Solar I | Angleton, TX | 265.1 GWh | 11 mi |
| Brotman Power Station | Rosharon, TX | 242.8 GWh | 12.7 mi |
| Freeport LP Pretreatment Facility | Freeport, TX | 623.7 GWh | 19.8 mi |
| GCWA | Texas City, TX | 67.0 MWh | 20.1 mi |
| HEB00028 | League City, TX | 245.0 MWh | 17.1 mi |
| HEB00760 | Manvel, TX | 205.0 MWh | 17.9 mi |
| Longbow Solar, LLC | Liverpool, TX | 163.4 GWh | 3.1 mi |
| Mark One Power Station | Angleton, TX | 408.2 GWh | 10.7 mi |
| Myrtle Solar, LLC | Angleton, TX | 431.2 GWh | 10.5 mi |
| Oyster Creek Unit VIII | Freeport, TX | 2.6 TWh | 20.2 mi |
| Power Island | Alvin, TX | 907.8 GWh | 4.4 mi |
| Praxair | Clute, TX | 228.0 MWh | 19.5 mi |
| Texas City Plant Union Carbide | Texas City, TX | 103.6 GWh | 20.3 mi |
| Topaz Generating | Texas City, TX | 547.7 GWh | 20.4 mi |
| WAL3510 | Pearland, TX | 79.0 MWh | 19.6 mi |
| WAL462 | Alvin, TX | 90.0 MWh | 11.1 mi |
| WAL529 | La Marque, TX | 147.0 MWh | 17.3 mi |
| WAL5388 | League City, TX | 178.0 MWh | 17.5 mi |