Timmerman Power Plant
636 Church Street, Maxwell, TX 78656Plant Summary Information
Timmerman Power Plant is ranked #124 out of 313 natural gas power plants in Texas in terms of total annual net electricity generation.
Timmerman Power Plant is comprised of 10 generators and generated 107.4 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Timmerman Power Plant |
|---|---|
| Utility Name | Lower Colorado River Authority |
| Location | Caldwell County, TX |
| Initial Operation Date | August 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 207.9 GWh |
| Annual Consumption | 2.1 M MMBtu |
| Ranked #2,487 out of 13,081 Power Plants Nationwide | |
| Ranked #740 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #463 out of 852 Texas Power Plants | |
| Ranked #124 out of 313 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Timmerman Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Timmerman Power Plant.
Monthly Net Generation for Timmerman Power Plant
Monthly Plant Fuel Consumption for Timmerman Power Plant
Timmerman Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Timmerman Power Plant (66335) |
| Plant Address | 636 Church Street, Maxwell, TX 78656 |
| Utility | Lower Colorado River Authority (11269) |
| Latitude, Longitude | 29.875, -97.807 |
| Generation Dates on File | Aug 2025 to Dec 2025 |
| Initial Operation Date | August 2025 |
| Annual Generation | 207.9 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator G1 Details Operating August 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 18 MW |
| Winter Capacity | 18 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator G10 Details Operating August 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 18 MW |
| Winter Capacity | 18 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator G2 Details Operating August 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 18 MW |
| Winter Capacity | 18 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator G3 Details Operating August 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 18 MW |
| Winter Capacity | 18 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator G4 Details Operating August 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 18 MW |
| Winter Capacity | 18 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator G5 Details Operating August 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 18 MW |
| Winter Capacity | 18 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator G6 Details Operating August 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 18 MW |
| Winter Capacity | 18 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator G7 Details Operating August 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 18 MW |
| Winter Capacity | 18 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator G8 Details Operating August 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 18 MW |
| Winter Capacity | 18 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator G9 Details Operating August 2025
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 18 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 18 MW |
| Winter Capacity | 18 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Timmerman Power Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #730 | Paris (WI) | Union Grove, WI | 215.0 GWh |
| #731 | Granite City Works | Granite City, IL | 447.9 GWh |
| #732 | Elm Road Generating Station | Oak Creek, WI | 7.5 TWh |
| #733 | Dahlberg | Nicholson, GA | 229.4 GWh |
| #734 | Valero Wilmington Cogeneration Plant | Wilmington, CA | 211.3 GWh |
| #735 | Montpelier Electric Generating Station | Poneto, IN | 213.1 GWh |
| #736 | Intercession City | Intercession City, FL | 228.7 GWh |
| #737 | Mass Inst Tech Cntrl Utilities/Cogen Plt | Cambridge, MA | 209.4 GWh |
| #738 | Atlantic Alumina, Gramercy Operations | Gramercy, LA | 208.1 GWh |
| #739 | Paulsboro Refinery | Paulsboro, NJ | 351.2 GWh |
| #741 | Indiana Harbor West | East Chicago, IN | 207.8 GWh |
| #742 | Roquette America | Keokuk, IA | 207.7 GWh |
| #743 | University of Illinois Abbott Power Plt | Champaign, IL | 212.6 GWh |
| #744 | Bluegrass Generating Station | LaGrange, KY | 207.3 GWh |
| #745 | Texas Petrochemicals | Houston, TX | 240.7 GWh |
| #746 | Worthington Generation LLC | Worthington, IN | 203.4 GWh |
| #747 | Red Lion Energy Center | New Castle, DE | 201.7 GWh |
| #748 | Valero Refinery Cogeneration Unit 1 | Benicia, CA | 236.7 GWh |
| #749 | Concord | Watertown, WI | 203.4 GWh |
| #750 | Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Timmerman Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ABIA Parking Structure | Austin, TX | 3.1 GWh | 24.2 mi |
| Austin | Austin, TX | 9.7 GWh | 28.9 mi |
| Austin Gas Recovery | Austin, TX | 32.2 GWh | 33.6 mi |
| Bastrop Energy Center | Cedar Creek, TX | 2.2 TWh | 24.2 mi |
| Big Star Solar, LLC (Hybrid) | Rosanky, TX | 416.4 GWh | 32.2 mi |
| Canyon | Canyon Lake, TX | 1.0 MWh | 23.2 mi |
| Dunlap TP 1 | New Brannfels, TX | 3.7 GWh | 21.6 mi |
| Guadalupe Generating Station | Marion, TX | 5.4 TWh | 26.5 mi |
| Hal C Weaver Power Plant | Austin, TX | 357.4 GWh | 28.8 mi |
| Hays Energy Project | San Marcos, TX | 5.5 TWh | 12.7 mi |
| Lost Pines 1 Power Project | Bastrop, TX | 2.8 TWh | 37.2 mi |
| Marshall Ford | Austin, TX | 45.2 GWh | 36.1 mi |
| Mesquite Creek LFGTE Project | New Braunfels, TX | 24.0 GWh | 16.1 mi |
| Niagara Bottling - Seguin | Seguin, TX | 7.9 GWh | 22.2 mi |
| PowerFin Kingsbery | Austin, TX | 3.0 GWh | 28 mi |
| Rio Nogales Power Project | Seguin, TX | 4.6 TWh | 21.9 mi |
| Robert Mueller Energy Center | Austin, TX | 30.0 GWh | 30.3 mi |
| Sand Hill | Austin, TX | 1.8 TWh | 25.9 mi |
| Sim Gideon | Bastrop, TX | 1.0 TWh | 37.1 mi |
| Webberville Solar Project | Manor, TX | 56.4 GWh | 30.8 mi |