Lily Solar Hybrid
7901 FM 1390, Scurry, TX 75158Plant Summary Information
Lily Solar Hybrid is ranked #83 out of 218 solar farms in Texas in terms of total annual net electricity generation.
Lily Solar Hybrid generated 52.8 GWh during the 3-month period between October 2025 to January 2026.
| Plant Name | Lily Solar Hybrid |
|---|---|
| Utility Name | Lily Solar, LLC |
| Location | Kaufman County, TX |
| Initial Operation Date | September 2021 |
| Last Update | Jan 2026 |
| Annual Generation | 317.3 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,920 out of 12,629 Power Plants Nationwide | |
| Ranked #244 out of 6,477 Solar Power Plants Nationwide | |
| Ranked #375 out of 819 Texas Power Plants | |
| Ranked #83 out of 218 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Lily Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lily Solar Hybrid.
Monthly Net Generation for Lily Solar Hybrid
Monthly Plant Fuel Consumption for Lily Solar Hybrid
Lily Solar Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Lily Solar Hybrid (63892) |
| Plant Address | 7901 FM 1390, Scurry, TX 75158 |
| Utility | Lily Solar, LLC (63549) |
| Latitude, Longitude | 32.53327, -96.42899 |
| Generation Dates on File | Jun 2021 to Jan 2026 |
| Initial Operation Date | September 2021 |
| Annual Generation | 317.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Rayburn Country Elec Coop, Inc (18589) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | Yes |
Generator LILY Details Operating October 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 146.7 MW |
| Summer Capacity | 146 MW |
| Winter Capacity | 146 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 1H |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Dual Axis Tracking | No |
| Bifacial | Yes |
| Azimuth Angle | 90 |
| Tilt Angle | 90 |
| DC Net Capacity | 180.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator LILYB Details Operating October 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 55.2 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 80.5 |
|---|---|
| Maximum Charge Rate | 50 MW |
| Maximum Discharge Rate | 50 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 75 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Frequency Regulation | Yes |
| Voltage Or Reactive Power Support | Yes |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Lily Solar Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #234 | Twin Lakes Solar LLC | Monticello, IN | 328.2 GWh |
| #235 | Hardin Solar Energy II LLC | Belle Center, OH | 328.1 GWh |
| #236 | Samson Solar Energy II LLC | Cunningham, TX | 327.0 GWh |
| #237 | Pixley Solar Energy | Pixley, KS | 325.7 GWh |
| #238 | Edwards Sanborn E4 | Mojave, CA | 321.0 GWh |
| #239 | Golden Triangle II | St.Artesia, MS | 317.5 GWh |
| #240 | Daybreak Solar | Maupin, OR | 323.5 GWh |
| #241 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 296.4 GWh |
| #242 | Cove Mountain Solar 2 | Beryl, UT | 321.8 GWh |
| #243 | Umbriel Solar | Livington, TX | 320.6 GWh |
| #245 | South Cheyenne Solar | South Greeley, WY | 319.7 GWh |
| #246 | Eldorado Solar I | Eldorado, IL | 319.5 GWh |
| #247 | American Kings Solar, LLC | Lemoore, CA | 318.9 GWh |
| #248 | Quitman Solar | Quitman, GA | 318.4 GWh |
| #249 | Elora Solar | Elora, TN | 315.6 GWh |
| #250 | Storey Solar and Storage | Coolidge, AZ | 301.3 GWh |
| #251 | Big River Solar | Norris City, IL | 314.9 GWh |
| #252 | Wolf Run Solar | Chapin, IL | 313.6 GWh |
| #253 | Edwards Sanborn E2 | Mojave, CA | 299.1 GWh |
| #254 | Peacock Energy Project | Taft, TX | 312.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lily Solar Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ameresco Dallas LLC | Dallas, TX | 27.6 GWh | 14.9 mi |
| Briar Creek Solar 1 | Corsicana, TX | 220.4 GWh | 33.5 mi |
| BT Signal Ranch | Quinlan, TX | 99.9 GWh | 37.1 mi |
| Ellis Solar LLC | Midlothian, TX | 165.3 GWh | 36.7 mi |
| Elm Branch Solar 1 | Bardwell, TX | 253.1 GWh | 26.3 mi |
| Ennis Power Company LLC | Ennis, TX | 1.7 TWh | 20.6 mi |
| Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 523.2 GWh | 34 mi |
| Forney Energy Center | Forney, TX | 10.0 TWh | 15.8 mi |
| Lake Hubbard | Sunnyvale, TX | 1.7 TWh | 22 mi |
| Mountain Creek | Dallas, TX | 479.5 GWh | 32.3 mi |
| OTHERBenEKDallas | Dallas, TX | 198.0 MWh | 31.6 mi |
| Ray Olinger | Navada, TX | 40.4 GWh | 37 mi |
| Trinidad (TX) | Trinidad, TX | 376.4 GWh | 34.1 mi |
| WAL2667 | Dallas, TX | 182.0 MWh | 23.5 mi |
| WAL3224 | Garland, TX | 168.0 MWh | 23.5 mi |
| WAL3285 | Cedar Hill, TX | 255.0 MWh | 30.5 mi |
| WAL3406 | Dallas, TX | 175.0 MWh | 37.1 mi |
| WAL3432 | Desoto, TX | 138.0 MWh | 26.6 mi |
| WAL565 | Corsicana, TX | 166.0 MWh | 29.9 mi |
| WAL896 | Grand Prairie, TX | 240.0 MWh | 36.6 mi |