Azure Sky Solar
11825 Loop Road, Haskell, TX 79521Plant Summary Information
Azure Sky Solar is ranked #35 out of 5,173 solar farms nationwide in terms of total annual net electricity generation.
Azure Sky Solar generated 114.5 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Azure Sky Solar |
---|---|
Utility Name | Azure Sky Solar Project, LLC |
Location | Haskell County, TX |
Initial Operation Date | July 2021 |
Last Update | Feb 2024 |
Annual Generation | 578.6 GWh |
Annual Consumption | 2.0 M MMBtu |
Ranked #1,217 out of 11,455 Power Plants Nationwide | |
Ranked #35 out of 5,173 Solar Power Plants Nationwide | |
Ranked #218 out of 726 Texas Power Plants | |
Ranked #12 out of 150 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Azure Sky Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Azure Sky Solar.
Monthly Net Generation for Azure Sky Solar
Azure Sky Solar Details
Summary Information | |
---|---|
Plant Name | Azure Sky Solar (63905) |
Plant Address | 11825 Loop Road Haskell, TX 79521 |
Utility | Azure Sky Solar Project, LLC (63571) |
Latitude, Longitude | 32.99895, -99.5985 |
Generation Dates on File | Jun 2021 to Feb 2024 |
Initial Operation Date | July 2021 |
Annual Generation | 578.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | Yes |
Generator ASKYS Details Operating July 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 225 MW |
Summer Capacity | 225 MW |
Winter Capacity | 225 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 1H |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 284 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator ASKYB Details Operating June 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 77.6 MW |
Summer Capacity | 77.6 MW |
Winter Capacity | 77.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 1H |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 77.6 |
---|---|
Maximum Charge Rate | 77.6 MW |
Maximum Discharge Rate | 77.6 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 44.7 |
Storage Enclosure Type | CS |
Frequency Regulation | Yes |
Load Following | No |
Excess Wind And Solar Generation | Yes |
Azure Sky Solar Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#25 | Moapa Southern Paiute | Moapa, NV | 625.4 GWh |
#26 | IP Radian, LLC | Brookesmith, TX | 621.7 GWh |
#27 | Noble Solar | Krum, TX | 616.2 GWh |
#28 | AV Solar Ranch One | Lancaster, CA | 607.0 GWh |
#29 | Slate Hybrid | Stratford, CA | 574.4 GWh |
#30 | Galloway 1 Solar Farm | Paint Rock, TX | 593.8 GWh |
#31 | SE Athos II, LLC | Desert Center, CA | 590.5 GWh |
#32 | Sun Valley Solar Project | Abbott, TX | 588.6 GWh |
#33 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 587.5 GWh |
#34 | Aktina Solar | El Campo, TX | 587.2 GWh |
#36 | Bighorn Solar 1 | Pueblo, CO | 584.0 GWh |
#37 | Taygete Energy Project LLC | Coyanosa, TX | 570.1 GWh |
#38 | Techren Solar II LLC | Boulder, NV | 564.7 GWh |
#39 | Aquamarine | Lemoore, CA | 560.9 GWh |
#40 | Phoebe Solar | Kermit, TX | 559.5 GWh |
#41 | Dodge Flat | Reno, NV | 546.0 GWh |
#42 | Golden Field Solar III, LLC | Rosamond, CA | 551.9 GWh |
#43 | Misae Solar | Childress, TX | 546.6 GWh |
#44 | ENGIE Long Draw Solar LLC | Gail, TX | 545.0 GWh |
#45 | Pisgah Ridge Solar, LLC | Richland, TX | 529.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Azure Sky Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ANSON Solar Center, LLC | Anson, TX | 473.8 GWh | 22.6 mi |
Azure Sky Wind Project, LLC Hybrid | Town of Throckmorton, TX | 991.1 GWh | 23.6 mi |
El Campo Wind | Truscott, TX | 773.5 GWh | 51.2 mi |
Green Pastures Wind I | Seymour, TX | 234.5 GWh | 44.8 mi |
Green Pastures Wind II | Seymour, TX | 283.4 GWh | 44.9 mi |
Griffin Trail Wind | E Seymour, TX | 820.5 GWh | 42.2 mi |
Hackberry Wind Farm | Albany, TX | 370.7 GWh | 18.9 mi |
HEB00070 | Abilene, TX | 297.8 MWh | 40.2 mi |
Horse Creek Wind Farm | Weinert, TX | 956.2 GWh | 24.5 mi |
Inertia Wind Project | Haskell, TX | 1.3 TWh | 13 mi |
King Creek Wind Farm 1, LLC | Throckmorton, TX | 583.3 GWh | 20.1 mi |
King Creek Wind Farm 2, LLC | Throckmorton, TX | 677.8 GWh | 17.5 mi |
Mesquite Wind Power LLC | Abilene, TX | 458.3 GWh | 26.5 mi |
OCI Alamo 7 LLC | Haskell, TX | 269.9 GWh | 3.9 mi |
Post Oak Wind LLC | Abilene, TX | 462.3 GWh | 33.6 mi |
Seymour Hills Wind Project, LLC | Seymour, TX | 142.8 GWh | 46.4 mi |
South Trent Wind Farm | Sweetwater, TX | 284.0 GWh | 51.2 mi |
WAL536 | Abilene, TX | 259.9 MWh | 36.3 mi |
Willow Springs Wind Farm | Weinert, TX | 948.4 GWh | 24 mi |
Young Wind | Graham, TX | 1.7 TWh | 44 mi |