HEBCCBakery
102 McBride Lane, Corpus Christi, TX 78408Plant Summary Information
HEBCCBakery is ranked #181 out of 291 natural gas power plants in Texas in terms of total annual net electricity generation.
HEBCCBakery is comprised of 8 generators and generated 298.2 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | HEBCCBakery |
---|---|
Utility Name | Texas Microgrid, LLC |
Location | Nueces County, TX |
Initial Operation Date | November 2019 |
Last Update | Dec 2022 |
Annual Generation | 904.0 MWh |
Annual Consumption | 13.2 k MMBtu |
Ranked #10,497 out of 11,455 Power Plants Nationwide | |
Ranked #1,954 out of 2,284 Natural Gas Power Plants Nationwide | |
Ranked #589 out of 726 Texas Power Plants | |
Ranked #181 out of 291 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of HEBCCBakery
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for HEBCCBakery.
Monthly Net Generation for HEBCCBakery
HEBCCBakery Details
Summary Information | |
---|---|
Plant Name | HEBCCBakery (66565) |
Plant Address | 102 McBride Lane Corpus Christi, TX 78408 |
Utility | Texas Microgrid, LLC (64449) |
Latitude, Longitude | 27.78629, -97.46234 |
Generation Dates on File | Jan 2022 to Dec 2022 |
Initial Operation Date | November 2019 |
Annual Generation | 904.0 MWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CORPUS CHRISTI GAS DIV |
Natural Gas Storage | No |
Generator HCCB1 Details Operating November 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | HCCB |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HCCB2 Details Operating November 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | HCCB |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HCCB3 Details Operating November 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | HCCB |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HCCB4 Details Operating November 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | HCCB |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HCCB5 Details Operating November 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | HCCB |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HCCB6 Details Operating November 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | HCCB |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HCCB7 Details Operating November 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | HCCB |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HCCB8 Details Operating November 2019
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Unit Code | HCCB |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
HEBCCBakery Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1944 | West 14th Street | Winfield, KS | 1.0 GWh |
#1945 | Covanta Lake County Energy | Okahumpka, FL | 88.0 GWh |
#1946 | Bowling Green Peaking | Bowling Green, OH | 1.0 GWh |
#1947 | Minnesota River | Chaska, MN | 962.7 MWh |
#1948 | Holton | City of Holton, KS | 1.1 GWh |
#1949 | Sweatt | Meridian, MS | 954.8 MWh |
#1950 | Deerhaven Renewable | Gainesville, FL | 297.5 GWh |
#1951 | Archer Daniels Midland Southport | Southport, NC | 1.3 GWh |
#1952 | M L Hibbard | Duluth, MN | 78.4 GWh |
#1953 | Regional Waste Systems | Portland, ME | 88.6 GWh |
#1955 | Hillsdale | Hillsdale, MI | 995.7 MWh |
#1956 | Wygen 1 | Gillette, WY | 700.4 GWh |
#1957 | Onondaga County Resource Recovery | Jamesville, NY | 231.9 GWh |
#1958 | Demoss Petrie | Tucson, AZ | 868.8 MWh |
#1959 | Drews Generating Facility | Colton, CA | 865.7 MWh |
#1960 | Altavista Power Station | Altavista, VA | 370.4 GWh |
#1961 | CT Resource Rec Authority Facility | Hartford, CT | 241.7 GWh |
#1962 | River Hills | Des Moines, IA | 839.0 MWh |
#1963 | Albany Green Energy | Albany, GA | 274.4 GWh |
#1964 | Oxnard Wastewater Treatment Plant | Oxnard, CA | 6.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding HEBCCBakery.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barney M Davis | Corpus Christi, TX | 1.5 TWh | 15.5 mi |
Blackjack Creek Wind Farm | Skidmore, TX | 433.9 GWh | 29.4 mi |
Chapman Ranch Wind I | Corpus Christi, TX | 718.3 GWh | 13.6 mi |
Corpus Christi | Corpus Christi, TX | 74.0 GWh | 8.3 mi |
Corpus Christi Energy Center | Corpus Christi, TX | 2.7 TWh | 2.8 mi |
Corpus Refinery | Corpus Christi, TX | 271.3 GWh | 5.1 mi |
Cranell Wind Farm LLC | TBD, TX | 635.7 GWh | 28.5 mi |
El Algodon Alto Wind Farm, LLC | Mathis, TX | 687.3 GWh | 22.3 mi |
Gregory Power Plant | Gregory, TX | 507.1 GWh | 14.3 mi |
HEB00057 | Corpus Christi, TX | 328.5 MWh | 13.9 mi |
HEB00069 | Corpus Christi, TX | 395.0 MWh | 13.8 mi |
Ingleside Cogeneration | Houston, TX | 3.0 TWh | 15 mi |
Karankawa Wind LLC | Mathis, TX | 901.6 GWh | 34.3 mi |
Midway Wind, LLC | Taft, TX | 488.8 GWh | 15.3 mi |
Nueces Bay | Corpus Christi, TX | 1.0 TWh | 3.5 mi |
Papalote Creek I LLC | Taft, TX | 544.8 GWh | 10.5 mi |
Papalote Creek II LLC | Taft, TX | 541.2 GWh | 17.7 mi |
Patriot Wind Farm | Bishop, TX | 667.2 GWh | 17.9 mi |
Ticona Polymers Inc | Bishop, TX | 275.3 GWh | 26.7 mi |
Valero Refinery Corpus Christi West | Corpus Christi, TX | 120.1 GWh | 2.5 mi |