HEBCCBakery
102 McBride Lane, Corpus Christi, TX 78408Plant Summary Information
HEBCCBakery is ranked #184 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.
HEBCCBakery is comprised of 8 generators and generated 179.6 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | HEBCCBakery |
|---|---|
| Utility Name | Texas Microgrid, LLC |
| Location | Nueces County, TX |
| Initial Operation Date | November 2019 |
| Last Update | Dec 2024 |
| Annual Generation | 802.0 MWh |
| Annual Consumption | 13.0 k MMBtu |
| Ranked #11,523 out of 12,539 Power Plants Nationwide | |
| Ranked #1,895 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #644 out of 799 Texas Power Plants | |
| Ranked #184 out of 314 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of HEBCCBakery
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for HEBCCBakery.
Monthly Net Generation for HEBCCBakery
HEBCCBakery Details
| Summary Information | |
|---|---|
| Plant Name | HEBCCBakery (66565) |
| Plant Address | 102 McBride Lane, Corpus Christi, TX 78408 |
| Utility | Texas Microgrid, LLC (64449) |
| Latitude, Longitude | 27.78629, -97.46234 |
| Generation Dates on File | Jan 2022 to Dec 2024 |
| Initial Operation Date | November 2019 |
| Annual Generation | 802.0 MWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | CORPUS CHRISTI GAS DIV |
| Natural Gas Storage | No |
Generator HCCB1 Details Operating November 2019
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Unit Code | HCCB |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator HCCB2 Details Operating November 2019
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Unit Code | HCCB |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator HCCB3 Details Operating November 2019
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Unit Code | HCCB |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator HCCB4 Details Operating November 2019
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Unit Code | HCCB |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator HCCB5 Details Operating November 2019
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Unit Code | HCCB |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator HCCB6 Details Operating November 2019
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Unit Code | HCCB |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator HCCB7 Details Operating November 2019
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Unit Code | HCCB |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator HCCB8 Details Operating November 2019
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Unit Code | HCCB |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
HEBCCBakery Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1885 | Walt Bailey Bioenergy Facility | Washington, DC | 51.6 GWh |
| #1886 | Wellesley College Central Utility Plant | Wellesley, MA | 889.0 MWh |
| #1887 | Woodland Biomass Power Ltd | Woodland, CA | 170.9 GWh |
| #1888 | Monroe Generating Station | Monroe, NC | 862.0 MWh |
| #1889 | Fruita | Grand Junction, CO | 975.0 MWh |
| #1890 | Agrilectric Power Partners Ltd | Lake Charles, LA | 78.9 GWh |
| #1891 | Springs Generating Station | Riverside, CA | 825.0 MWh |
| #1892 | Red Wing | Red Wing, MN | 125.7 GWh |
| #1893 | Goose Creek Energy Center | Monticello, IL | 817.0 MWh |
| #1894 | AbbVie Waco | Waco, TX | 811.0 MWh |
| #1896 | Coralville GT | Coralville, IA | 800.0 MWh |
| #1897 | M L Hibbard | Duluth, MN | 95.3 GWh |
| #1898 | SB Water Reclamation Fuel Cell | San Bernardino, CA | 9.4 GWh |
| #1899 | Western Sugar Cooperative - Billings | Billings, MT | 5.3 GWh |
| #1900 | Honda Torrance | Torrance, CA | 762.0 MWh |
| #1901 | Univ of Oregon Central Power Station | Eugene, OR | 936.8 MWh |
| #1902 | Substation 20 Plant | Orangeburg, SC | 751.0 MWh |
| #1903 | Holton | City of Holton, KS | 816.0 MWh |
| #1904 | Encina Water Pollution Control | Carlsbad, CA | 14.2 GWh |
| #1905 | Nevada Solar One | Boulder City, NV | 89.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding HEBCCBakery.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barney M Davis | Corpus Christi, TX | 1.5 TWh | 15.5 mi |
| Blackjack Creek Wind Farm | Skidmore, TX | 532.8 GWh | 29.4 mi |
| Chapman Ranch Wind I | Corpus Christi, TX | 518.0 GWh | 13.6 mi |
| Corpus Christi | Corpus Christi, TX | 54.6 GWh | 8.3 mi |
| Corpus Christi Energy Center | Corpus Christi, TX | 2.5 TWh | 2.8 mi |
| Corpus Refinery | Corpus Christi, TX | 280.5 GWh | 5.1 mi |
| Cranell Wind Farm LLC | TBD, TX | 588.6 GWh | 28.5 mi |
| El Algodon Alto Wind Farm, LLC | Mathis, TX | 668.2 GWh | 22.3 mi |
| Gregory Power Plant | Gregory, TX | 552.7 GWh | 14.3 mi |
| HEB00057 | Corpus Christi, TX | 266.0 MWh | 13.9 mi |
| HEB00069 | Corpus Christi, TX | 356.0 MWh | 13.8 mi |
| Ingleside Cogeneration | Houston, TX | 2.8 TWh | 15 mi |
| Midway Wind, LLC | Taft, TX | 418.5 GWh | 15.3 mi |
| Nueces Bay | Corpus Christi, TX | 1.7 TWh | 3.5 mi |
| Papalote Creek I LLC | Taft, TX | 335.8 GWh | 10.5 mi |
| Papalote Creek II LLC | Taft, TX | 507.1 GWh | 17.7 mi |
| Patriot Wind Farm | Bishop, TX | 675.3 GWh | 17.9 mi |
| Peacock Energy Project | Taft, TX | 252.1 GWh | 15.5 mi |
| Ticona Polymers Inc | Bishop, TX | 264.7 GWh | 26.7 mi |
| Valero Refinery Corpus Christi West | Corpus Christi, TX | 85.5 GWh | 2.5 mi |