Crane Solar Project
308 Tori Road, Crane, TX 79731Plant Summary Information
Crane Solar Project is ranked #63 out of 215 solar farms in Texas in terms of total annual net electricity generation.
Crane Solar Project generated 82.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Crane Solar Project |
|---|---|
| Utility Name | Crane Solar Project, LLC |
| Location | Crane County, TX |
| Initial Operation Date | July 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 405.5 GWh |
| Annual Consumption | 1.5 M MMBtu |
| Ranked #1,579 out of 12,613 Power Plants Nationwide | |
| Ranked #161 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #319 out of 816 Texas Power Plants | |
| Ranked #63 out of 215 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Consolidated Edison Development Inc. (2019 to 2020) CED Crane Solar, LLC (2021 to 2023) Crane Solar Project, LLC (2024 to 2024) |
Map of Crane Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Crane Solar Project.
Monthly Net Generation for Crane Solar Project
Monthly Plant Fuel Consumption for Crane Solar Project
Crane Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Crane Solar Project (63519) |
| Plant Address | 308 Tori Road, Crane, TX 79731 |
| Utility | Crane Solar Project, LLC (64403) |
| Latitude, Longitude | 31.25436, -102.31165 |
| Generation Dates on File | Jun 2020 to Dec 2025 |
| Initial Operation Date | July 2020 |
| Annual Generation | 405.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator CRN1 Details Operating July 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | FWLR_SLR_UNIT1 |
| Nameplate Capacity | 150 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 212.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Crane Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #151 | Sherco Solar I | Clear Lake, MN | 418.6 GWh |
| #152 | Cutlass Solar II | Richmond, TX | 417.8 GWh |
| #153 | Huck Finn Renewable Energy Center | Vandalia, MO | 417.1 GWh |
| #154 | TS Power Plant | Battle Mountain, NV | 1.7 TWh |
| #155 | Sun Streams, LLC | Arlington, AZ | 411.7 GWh |
| #156 | Sandrini Solar 200 | Mettler, CA | 411.3 GWh |
| #157 | Oak Ridge Solar | Oak Ridge, LA | 409.6 GWh |
| #158 | Misae Solar | Childress, TX | 408.9 GWh |
| #159 | Greasewood Solar | Fort Stockton, TX | 408.3 GWh |
| #160 | Ash Creek Solar | Abbott, TX | 405.6 GWh |
| #162 | Scarlet II Hybrid | Cantua Creek, CA | 385.1 GWh |
| #163 | Chestnut | Lemoore, CA | 377.8 GWh |
| #164 | Wright Solar Park | Los Banos, CA | 402.7 GWh |
| #165 | Mount Signal Solar Farm II | Calexico, CA | 402.5 GWh |
| #166 | Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh |
| #167 | Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh |
| #168 | North Rosamond Solar LLC | Rosamond, CA | 397.2 GWh |
| #169 | Mustang Two | Lemoore, CA | 396.3 GWh |
| #170 | Crooked Lake Solar, LLC | Blytheville, AR | 393.5 GWh |
| #171 | Big Plain Solar, LLC | London, OH | 391.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Crane Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alamo 6 | Fort Stockton, TX | 226.3 GWh | 18.2 mi |
| Appaloosa Run Wind | Rankin, TX | 699.1 GWh | 29.2 mi |
| Castle Gap Solar Hybrid | McCarney, TX | 384.2 GWh | 2.3 mi |
| Desert Sky | Iraan, TX | 496.7 GWh | 26.8 mi |
| East Pecos Solar | McCamey, TX | 219.4 GWh | 17.6 mi |
| Emerald Grove | Crane, TX | 256.3 GWh | 11.5 mi |
| Greasewood II LLC | Girvin, TX | 796.9 GWh | 20.3 mi |
| Greasewood Solar | Fort Stockton, TX | 408.3 GWh | 18.6 mi |
| High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.3 TWh | 26.1 mi |
| King Mountain Wind Ranch 1 | McCamey, TX | 573.5 GWh | 5.2 mi |
| Midway Solar - TX | Fort Stockton, TX | 332.5 GWh | 18.6 mi |
| NWP Indian Mesa Wind Farm | Iraan, TX | 205.6 GWh | 23.2 mi |
| Pearl Solar | Fort Stockton, TX | 97.4 GWh | 18.6 mi |
| RE Maplewood | McCamey, TX | 526.4 GWh | 19.5 mi |
| Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh | 7.5 mi |
| Swift Air Solar II | Odessa, TX | 33.9 GWh | 34.6 mi |
| Swift Air Solar III | Odessa, TX | 21.3 GWh | 34.6 mi |
| Upton County Solar | McCamey, TX | 299.1 GWh | 1.5 mi |
| Woodward Mountain I | Girvin, TX | 168.0 GWh | 21.8 mi |
| Woodward Mountain II | Girvin, TX | 168.0 GWh | 21.8 mi |