Misae Solar IV LLC
16346 FM 542, Oakwood, TX 75855Plant Summary Information
Misae Solar IV LLC is ranked #178 out of 255 solar farms in Texas in terms of total annual net electricity generation.
Misae Solar IV LLC generated 69.8 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Misae Solar IV LLC |
|---|---|
| Utility Name | Ferrovial Energy US |
| Location | Leon County, TX |
| Initial Operation Date | Not Available |
| Last Update | Aug 2026 |
| Annual Generation | 69.8 GWh |
| Annual Consumption | 238.1 k MMBtu |
| Ranked #3,942 out of 13,301 Power Plants Nationwide | |
| Ranked #1,077 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #556 out of 861 Texas Power Plants | |
| Ranked #178 out of 255 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Misae Solar IV LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Misae Solar IV LLC.
Monthly Net Generation for Misae Solar IV LLC
Monthly Plant Fuel Consumption for Misae Solar IV LLC
Misae Solar IV LLC Details
| Summary Information | |
|---|---|
| Plant Name | Misae Solar IV LLC (70052) |
| Plant Address | 16346 FM 542, Oakwood, TX 75855 |
| Utility | Ferrovial Energy US (67842) |
| Latitude, Longitude | 31.44307, -95.75183 |
| Generation Dates on File | Jun 2026 to Aug 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 69.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 25-450-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Misae Solar IV LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1067 | FL Solar 4, LLC | Tallahassee, FL | 72.7 GWh |
| #1068 | Central 40 | Newman, CA | 71.7 GWh |
| #1069 | Newton Solar BESS LLC | Newton, IL | 71.5 GWh |
| #1070 | SR Bell Buckle | Shelbyville, TN | 71.5 GWh |
| #1071 | Union Ridge Solar | Harrison Township, OH | 71.4 GWh |
| #1072 | Bluebell Solar | Sterling City, TX | 70.6 GWh |
| #1073 | OCI Alamo 4, LLC | Brackettville, TX | 70.5 GWh |
| #1074 | Hayhurst Texas Solar | Orla, TX | 70.1 GWh |
| #1075 | Robin Hollow Solar | West Greenwich, RI | 70.1 GWh |
| #1076 | Ho'Ohana Solar 1 | Waipahu, HI | 53.6 GWh |
| #1078 | Chaves County Solar II | Roswell, NM | 69.2 GWh |
| #1079 | Jumper Creek Solar Plant | Lake Panasoffkee, FL | 68.9 GWh |
| #1080 | Ostrea Solar, LLC | Moxee, WA | 68.5 GWh |
| #1081 | Montpelier Solar Project | Montpelier, OH | 68.1 GWh |
| #1082 | Hazlehurst III | Hazlehurst, GA | 68.1 GWh |
| #1083 | Sonny Solar LLC | Elberton, GA | 67.7 GWh |
| #1084 | Altona Solar, LLC | Centralia, MO | 67.5 GWh |
| #1085 | Ashwood Solar I | Eddyville, KY | 67.2 GWh |
| #1086 | Bonnie Mine Solar | Bartow, FL | 67.2 GWh |
| #1087 | Twelvemile Solar 2 | Durant, OK | 67.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Misae Solar IV LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Azalea Springs Solar Park | Lufkin, TX | 408.3 GWh | 52 mi |
| Blue Jay Solar I, LLC | Iola, TX | 440.2 GWh | 54.3 mi |
| Diver Solar, LLC | Thornton, TX | 524.3 GWh | 40 mi |
| Fairfield Solar Project | Fairfield, TX | 14.4 GWh | 31.7 mi |
| Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 526.4 GWh | 51.6 mi |
| Freestone Energy Center | Fairfield, TX | 6.0 TWh | 37.5 mi |
| Gaia Hybrid | Navarro, TX | 152.4 GWh | 56 mi |
| Grimes County Solar | Lola, TX | 325.9 GWh | 58.3 mi |
| Limestone | Jewett, TX | 6.9 TWh | 29.6 mi |
| Limestone Wind Project | Coolidge, TX | 1.1 TWh | 58.6 mi |
| Major Oak Power | Bremond, TX | 2.3 TWh | 60.8 mi |
| Malakoff Solar Project | Malaloff, TX | 15.9 GWh | 53.5 mi |
| Nacogdoches Power | Cushing, TX | 396.1 GWh | 56.8 mi |
| Oak Grove (TX) | Franklin, TX | 12.0 TWh | 47 mi |
| Pin Oak Creek Energy Center, LLC | Fairfield, TX | 376.9 GWh | 37.6 mi |
| Pisgah Ridge Solar, LLC | Richland, TX | 417.8 GWh | 52.5 mi |
| Stryker Creek | Jacksonville, TX | 1.3 TWh | 56.4 mi |
| Tenaska Frontier Generation Station | Shiro, TX | 4.8 TWh | 59.6 mi |
| Trinidad (TX) | Trinidad, TX | 431.9 GWh | 51.4 mi |
| WAL565 | Corsicana, TX | 311.0 MWh | 59.4 mi |