Grizzly Ridge Solar
3026 County Road 606, Hamilton County, TX 76351Plant Summary Information
Grizzly Ridge Solar is ranked #99 out of 190 solar farms in Texas in terms of total annual net electricity generation.
Grizzly Ridge Solar generated 29.3 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Grizzly Ridge Solar |
---|---|
Utility Name | Grizzly Ridge Solar LLC |
Location | Hamilton County, TX |
Initial Operation Date | October 2023 |
Last Update | Apr 2025 |
Annual Generation | 157.1 GWh |
Annual Consumption | 547.5 k MMBtu |
Ranked #2,696 out of 12,299 Power Plants Nationwide | |
Ranked #437 out of 6,182 Solar Power Plants Nationwide | |
Ranked #441 out of 792 Texas Power Plants | |
Ranked #99 out of 190 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Grizzly Ridge Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grizzly Ridge Solar.
Monthly Net Generation for Grizzly Ridge Solar
Grizzly Ridge Solar Details
Summary Information | |
---|---|
Plant Name | Grizzly Ridge Solar (66410) |
Plant Address | 3026 County Road 606, Hamilton County, TX 76351 |
Utility | Grizzly Ridge Solar LLC (65451) |
Latitude, Longitude | 31.73818, -98.21374 |
Generation Dates on File | Jan 2023 to Apr 2025 |
Initial Operation Date | October 2023 |
Annual Generation | 157.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | |
Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
Grid Voltage | 69.00 kV |
Energy Storage | Yes |
Generator 375 Details Operating October 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
Azimuth Angle | 180 |
DC Net Capacity | 131 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Grizzly Ridge Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#427 | SR Cedar Springs, LLC | Blakely, GA | 160.1 GWh |
#428 | Charlie Creek Solar Power Plant | Wauchula, FL | 159.8 GWh |
#429 | Bluegrass Solar | Church Hill, MD | 159.5 GWh |
#430 | Willow Solar Energy Center | Myakka City, FL | 159.3 GWh |
#431 | Silver Palm | TBD, FL | 159.2 GWh |
#432 | Huntley | Bowman, SC | 158.1 GWh |
#433 | Ellis Solar LLC | Midlothian, TX | 158.1 GWh |
#434 | Trenton Solar Power Plant | Trenton, FL | 157.9 GWh |
#435 | Cove Mountain Solar | Beryl, UT | 157.7 GWh |
#436 | RE Astoria 2 | Rosamond, CA | 157.6 GWh |
#438 | SR Perry | Perry, GA | 157.1 GWh |
#439 | Misenheimer Solar LLC | Gold Hill, NC | 156.6 GWh |
#440 | Columbia Solar Power Plant | Fort White, FL | 156.6 GWh |
#441 | Stuttgart Solar | Stuttgart, AR | 156.5 GWh |
#442 | Dileo Solar | Clifton, TX | 155.6 GWh |
#443 | Vikings Energy Farm | Holtville, CA | 144.6 GWh |
#444 | Powells Creek Solar - Hybrid | Alton, VA | 155.1 GWh |
#445 | Altavista Solar | Lynch Station, VA | 154.7 GWh |
#446 | Gutenberg Solar | Garysburg, NC | 154.7 GWh |
#447 | Sabal Palm Solar Center | Loxahatchee, FL | 154.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Grizzly Ridge Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buckthorn Wind | Mingus, TX | 353.8 GWh | 44.8 mi |
Castle Gap Wind | Goldthwaite, TX | 611.6 GWh | 25.3 mi |
Comanche Peak | Glen Rose, TX | 19.4 TWh | 46.1 mi |
DeCordova Steam Electric Station | Granbury, TX | 36.9 GWh | 54.9 mi |
Dileo Solar | Clifton, TX | 155.6 GWh | 41.4 mi |
Flat Top Wind I | Mullin, TX | 742.1 GWh | 23.2 mi |
Goldthwaite Wind Energy Facility | Goldthwaite, TX | 433.6 GWh | 28.7 mi |
Logans Gap Wind LLC | Comanche, TX | 579.3 GWh | 28.6 mi |
Markum Solar Farm | Valley Mills, TX | 144.8 GWh | 49.4 mi |
Phantom Solar | Fort Hood, TX | 16.9 GWh | 48.2 mi |
Priddy Wind Project | Goldthwaite, TX | 974.9 GWh | 21.1 mi |
Silver Star I Wind Power Project | Dublin, TX | 200.5 GWh | 44.2 mi |
Thad Hill Energy Center | Clifton, TX | 4.2 TWh | 50.9 mi |
TPE Erath Solar, LLC | Stephenville, TX | 25.2 GWh | 36.2 mi |
WAL407 | Killeen, TX | 251.0 MWh | 53.1 mi |
Walnut Springs Solar | Walnut Springs, TX | 8.4 GWh | 35.2 mi |
Whitney | Clifton, TX | 69.4 GWh | 50.6 mi |
Wolf Hollow I LP | Granbury, TX | 3.1 TWh | 49.9 mi |
Wolf Hollow II | Granbury, TX | 6.2 TWh | 50 mi |
Yellow Jacket | Meridian, TX | 10.0 GWh | 35.5 mi |