Remy Jade Power Station
3511 Danek Rd, Crosby, TX 77532Plant Summary Information
Remy Jade Power Station is ranked #107 out of 313 natural gas power plants in Texas in terms of total annual net electricity generation.
Remy Jade Power Station is comprised of 8 generators and generated 81.1 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Remy Jade Power Station |
|---|---|
| Utility Name | City of San Antonio - (TX) |
| Location | Harris County, TX |
| Initial Operation Date | June 2024 |
| Last Update | Jun 2026 |
| Annual Generation | 423.2 GWh |
| Annual Consumption | 4.7 M MMBtu |
| Ranked #1,561 out of 13,094 Power Plants Nationwide | |
| Ranked #589 out of 2,208 Natural Gas Power Plants Nationwide | |
| Ranked #327 out of 858 Texas Power Plants | |
| Ranked #107 out of 313 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
ProEnergy Services (2022 to 2024) City of San Antonio - (TX) (2025 to 2025) |
Map of Remy Jade Power Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Remy Jade Power Station.
Monthly Net Generation for Remy Jade Power Station
Monthly Plant Fuel Consumption for Remy Jade Power Station
Remy Jade Power Station Details
| Summary Information | |
|---|---|
| Plant Name | Remy Jade Power Station (66604) |
| Plant Address | 3511 Danek Rd, Crosby, TX 77532 |
| Utility | City of San Antonio - (TX) (16604) |
| Latitude, Longitude | 29.84837, -95.0164 |
| Generation Dates on File | Jun 2024 to Jun 2026 |
| Initial Operation Date | June 2024 |
| Annual Generation | 423.2 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG23-43-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | KINDER MORGAN TEJAS PIPELINE LLC |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator CTG-7 Details Operating October 2024
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2024 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-8 Details Operating October 2024
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2024 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-1 Details Operating June 2024
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2024 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-2 Details Operating June 2024
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2024 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-3 Details Operating June 2024
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2024 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-4 Details Operating June 2024
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2024 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-5 Details Operating June 2024
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2024 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator CTG-6 Details Operating June 2024
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2024 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Remy Jade Power Station Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #579 | Mansfield Mill | Mansfield, LA | 832.2 GWh |
| #580 | Masspower | Indian Orchard, MA | 441.7 GWh |
| #581 | Shady Hills Generating Station | Shady Hills, FL | 442.7 GWh |
| #582 | Blue Lake | Shakopee, MN | 434.8 GWh |
| #583 | E W Brown | Harrodsburg, KY | 1.8 TWh |
| #584 | Trinidad (TX) | Trinidad, TX | 431.9 GWh |
| #585 | Gary Works | Gary, IN | 994.9 GWh |
| #586 | C R Wing Cogen Plant | Big Spring, TX | 427.5 GWh |
| #587 | Oxnard | Oxnard, CA | 426.0 GWh |
| #588 | Tolk | Muleshoe, TX | 3.0 TWh |
| #590 | Vermillion Energy Facility | Cayuga, IN | 422.3 GWh |
| #591 | Spindle Hill Energy Center | Fort Lupton, CO | 417.2 GWh |
| #592 | Formosa Plastics | Baton Rouge, LA | 416.2 GWh |
| #593 | Sewell Creek Energy | Cedartown, GA | 415.7 GWh |
| #594 | Mark One Power Station | Angleton, TX | 415.5 GWh |
| #595 | Lodi Energy Center | Lodi, CA | 413.3 GWh |
| #596 | Lockport Energy Associates LP | Lockport, NY | 413.0 GWh |
| #597 | Primient | Lafayette, IN | 408.0 GWh |
| #598 | Essential Power Rock Springs LLC | Rising Sun, MD | 407.7 GWh |
| #599 | McMeekin | Columbia, SC | 404.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Remy Jade Power Station.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Baytown Energy Center | Baytown, TX | 4.2 TWh | 8.6 mi |
| Cedar Bayou | Baytown, TX | 2.4 TWh | 8.7 mi |
| Cedar Bayou 4 | Eldon, TX | 2.3 TWh | 8.7 mi |
| Chamon | Houston, TX | 51.3 GWh | 6.2 mi |
| Channelview Cogeneration Plant | Channelview, TX | 5.5 TWh | 6.4 mi |
| Enterprise Products Operating | Mont Belvieu, TX | 150.1 GWh | 6 mi |
| Exelon LaPorte Generating Station | LaPorte, TX | 70.7 GWh | 10.6 mi |
| ExxonMobil Baytown Refinery | Baytown, TX | 1.2 TWh | 6.7 mi |
| ExxonMobil Baytown Turbine | Baytown, TX | 2.6 TWh | 6.2 mi |
| Houston Chemical Complex Battleground | Houston, TX | 1.6 TWh | 9 mi |
| Mont Belvieu Cogeneration Unit | Mont Belvieu, TX | 76.8 GWh | 7 mi |
| Odyssey Energy Altura Cogen, LLC | Channelview, TX | 3.4 TWh | 5.9 mi |
| RavenChem | Baytown, TX | 422.0 MWh | 6.4 mi |
| San Jacinto Steam Electric Station | La Porte, TX | 751.6 GWh | 10.7 mi |
| Shell Deer Park | Deer Park, TX | 1.1 TWh | 11 mi |
| SJRR (LIG) | Houston, TX | 74.1 GWh | 6.2 mi |
| WAL194 | Baytown, TX | 305.0 MWh | 5.6 mi |
| WAL2439 | Baytown, TX | 331.0 MWh | 7.3 mi |
| WAL3500 | Houston, TX | 315.0 MWh | 9.4 mi |
| WAL522 | Crosby, TX | 338.0 MWh | 4.3 mi |