Remy Jade Power Station
3511 Danek Rd, Crosby, TX 77532Plant Summary Information
Remy Jade Power Station is ranked #100 out of 312 natural gas power plants in Texas in terms of total annual net electricity generation.
Remy Jade Power Station is comprised of 8 generators and generated 133.3 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Remy Jade Power Station |
---|---|
Utility Name | ProEnergy Services |
Location | Harris County, TX |
Initial Operation Date | June 2024 |
Last Update | May 2025 |
Annual Generation | 553.9 GWh |
Annual Consumption | 5.7 M MMBtu |
Ranked #1,214 out of 12,312 Power Plants Nationwide | |
Ranked #545 out of 2,220 Natural Gas Power Plants Nationwide | |
Ranked #230 out of 796 Texas Power Plants | |
Ranked #100 out of 312 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Remy Jade Power Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Remy Jade Power Station.
Monthly Net Generation for Remy Jade Power Station
Remy Jade Power Station Details
Summary Information | |
---|---|
Plant Name | Remy Jade Power Station (66604) |
Plant Address | 3511 Danek Rd, Crosby, TX 77532 |
Utility | ProEnergy Services (63082) |
Latitude, Longitude | 29.84837, -95.0164 |
Generation Dates on File | Jun 2024 to May 2025 |
Initial Operation Date | June 2024 |
Annual Generation | 553.9 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG23-43-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KINDER MORGAN TEJAS PIPELINE LLC |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CTG-7 Details Operating October 2024
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-8 Details Operating October 2024
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-1 Details Operating June 2024
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-2 Details Operating June 2024
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-3 Details Operating June 2024
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-4 Details Operating June 2024
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-5 Details Operating June 2024
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator CTG-6 Details Operating June 2024
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 60.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 44.5 MW |
Winter Capacity | 49.8 MW |
Minimum Load | 22.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Remy Jade Power Station Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#535 | Roseville Energy Park | Roseville, CA | 575.8 GWh |
#536 | Shady Hills Generating Station | Shady Hills, FL | 582.9 GWh |
#537 | Berkshire Power | Agawam, MA | 573.3 GWh |
#538 | Eklutna Generation Station | Chugiak, AK | 573.0 GWh |
#539 | Shell Chemical | Geismar, LA | 572.3 GWh |
#540 | Las Vegas Generating Station | North Las Vegas, NV | 571.8 GWh |
#541 | Maddox | Hobbs, NM | 564.8 GWh |
#542 | NAFTA Region Olefins Complex Cogen Fac | Port Arthur, TX | 562.0 GWh |
#543 | Elm Road Generating Station | Oak Creek, WI | 7.8 TWh |
#544 | Freeport LP Pretreatment Facility | Freeport, TX | 555.9 GWh |
#546 | SPA Cogen 3 | Sacramento, CA | 547.8 GWh |
#547 | Encogen | Bellingham, WA | 544.5 GWh |
#548 | Riverside Generating LLC | Catlettsburg, KY | 536.5 GWh |
#549 | Spindle Hill Energy Center | Fort Lupton, CO | 536.3 GWh |
#550 | Sayreville Cogeneration Facility | Sayreville, NJ | 534.8 GWh |
#551 | BASF Freeport Works | Feeeport, TX | 532.7 GWh |
#552 | Belle River | China Twp, MI | 7.4 TWh |
#553 | McMeekin | Columbia, SC | 528.4 GWh |
#554 | Mustang | Oklahoma City, OK | 531.6 GWh |
#555 | Sewell Creek Energy | Cedartown, GA | 522.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Remy Jade Power Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Baytown Energy Center | Baytown, TX | 4.7 TWh | 8.6 mi |
Cedar Bayou | Baytown, TX | 2.7 TWh | 8.7 mi |
Cedar Bayou 4 | Eldon, TX | 2.3 TWh | 8.7 mi |
Chamon Power LLC | Houston, TX | 114.9 GWh | 6.2 mi |
Channelview Cogeneration Plant | Channelview, TX | 5.8 TWh | 6.4 mi |
Enterprise Products Operating | Mont Belvieu, TX | 154.7 GWh | 6 mi |
Exelon LaPorte Generating Station | LaPorte, TX | 164.9 GWh | 10.6 mi |
ExxonMobil Baytown Refinery | Baytown, TX | 1.2 TWh | 6.7 mi |
ExxonMobil Baytown Turbine | Baytown, TX | 2.7 TWh | 6.2 mi |
Houston Chemical Complex Battleground | Houston, TX | 1.8 TWh | 9 mi |
Mont Belvieu Cogeneration Unit | Mont Belvieu, TX | 95.4 GWh | 7 mi |
Odyssey Energy Altura Cogen, LLC | Channelview, TX | 3.6 TWh | 5.9 mi |
RavenChem | Baytown, TX | 48.0 MWh | 6.4 mi |
San Jacinto Steam Electric Station | La Porte, TX | 857.9 GWh | 10.7 mi |
Shell Deer Park | Deer Park, TX | 1.2 TWh | 11 mi |
SJRR Power LLC | Houston, TX | 146.6 GWh | 6.2 mi |
WAL194 | Baytown, TX | 209.0 MWh | 5.6 mi |
WAL2439 | Baytown, TX | 159.0 MWh | 7.3 mi |
WAL3500 | Houston, TX | 276.0 MWh | 9.4 mi |
WAL522 | Crosby, TX | 316.0 MWh | 4.3 mi |