Remy Jade Power Station

3511 Danek Rd, Crosby, TX 77532

Plant Summary Information

Remy Jade Power Station is ranked #104 out of 313 natural gas power plants in Texas in terms of total annual net electricity generation.

Remy Jade Power Station is comprised of 8 generators and generated 82.4 GWh during the 3-month period between February 2026 to May 2026.

Plant NameRemy Jade Power Station
Utility NameCity of San Antonio - (TX)
LocationHarris County, TX
Initial Operation DateJune 2024
Last Update May 2026
Annual Generation 433.6 GWh
Annual Consumption 4.9 M MMBtu
Ranked #1,523 out of 13,081 Power Plants Nationwide
Ranked #585 out of 2,206 Natural Gas Power Plants Nationwide
Ranked #315 out of 852 Texas Power Plants
Ranked #104 out of 313 Texas Natural Gas Power Plants
Fuel Types Natural Gas
Previous Operator ProEnergy Services (2022 to 2024)
City of San Antonio - (TX) (2025 to 2025)

Map of Remy Jade Power Station

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Remy Jade Power Station.

Create Your Account Today

Monthly Net Generation for Remy Jade Power Station

Monthly Plant Fuel Consumption for Remy Jade Power Station

Remy Jade Power Station Details

Summary Information
Plant NameRemy Jade Power Station (66604)
Plant Address3511 Danek Rd, Crosby, TX 77532
UtilityCity of San Antonio - (TX) (16604)
Latitude, Longitude29.84837, -95.0164
Generation Dates on FileJun 2024 to May 2026
Initial Operation DateJune 2024
Annual Generation 433.6 GWh
Fuel Types Natural Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket NumberEG23-43-000
Regulatory Information
Regulatory StatusRegulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerCenterPoint Energy (8901) TX
Grid Voltage 138.00 kV
Energy StorageNo
 
Natural Gas Information
Pipeline Name KINDER MORGAN TEJAS PIPELINE LLC
Natural Gas StorageNo
Liquefied Natural Gas StorageNo

Generator CTG-7 Details Operating October 2024

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity60.5 MW
Nameplate Power Factor0.9
Summer Capacity44.5 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2024
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-8 Details Operating October 2024

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity60.5 MW
Nameplate Power Factor0.9
Summer Capacity44.5 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2024
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-1 Details Operating June 2024

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity60.5 MW
Nameplate Power Factor0.9
Summer Capacity44.5 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2024
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-2 Details Operating June 2024

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity60.5 MW
Nameplate Power Factor0.9
Summer Capacity44.5 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2024
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-3 Details Operating June 2024

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity60.5 MW
Nameplate Power Factor0.9
Summer Capacity44.5 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2024
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-4 Details Operating June 2024

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity60.5 MW
Nameplate Power Factor0.9
Summer Capacity44.5 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2024
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-5 Details Operating June 2024

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity60.5 MW
Nameplate Power Factor0.9
Summer Capacity44.5 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2024
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Generator CTG-6 Details Operating June 2024

TechnologyNatural Gas Fired Combustion Turbine
Prime MoverCombustion Turbine
OwnershipSingle Owner
Nameplate Capacity60.5 MW
Nameplate Power Factor0.9
Summer Capacity44.5 MW
Winter Capacity49.8 MW
Minimum Load22.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2024
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo

Remy Jade Power Station Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#575Turtle CreekSpringfield, NE464.6 GWh
#576PearsallPearsall, TX453.9 GWh
#577Sheboygan FallsSheboygan, WI452.5 GWh
#578WoodsdaleTrenton, OH463.4 GWh
#579Mansfield MillMansfield, LA855.5 GWh
#580North ValmyValmy, NV1.3 TWh
#581Nikiski Combined CycleNikiski, AK445.0 GWh
#582MasspowerIndian Orchard, MA441.7 GWh
#583Whitewater Generating StationWhitewater, WI441.5 GWh
#584Blue LakeShakopee, MN434.8 GWh
#586Trinidad (TX)Trinidad, TX431.9 GWh
#587Gary WorksGary, IN994.9 GWh
#588C R Wing Cogen PlantBig Spring, TX427.5 GWh
#589E W BrownHarrodsburg, KY1.8 TWh
#590OxnardOxnard, CA425.0 GWh
#591Vermillion Energy FacilityCayuga, IN422.3 GWh
#592Dave Gates Generating StationAnaconda, MT420.9 GWh
#593Formosa PlasticsBaton Rouge, LA416.2 GWh
#594Sewell Creek EnergyCedartown, GA415.7 GWh
#595TolkMuleshoe, TX3.1 TWh

Nearby Power Plants

Below are closest 20 power plants surrounding Remy Jade Power Station.

Plant NamePlant LocationAnnual GenerationDistance
Baytown Energy CenterBaytown, TX4.0 TWh8.6 mi
Cedar BayouBaytown, TX2.1 TWh8.7 mi
Cedar Bayou 4Eldon, TX2.3 TWh8.7 mi
ChamonHouston, TX51.3 GWh6.2 mi
Channelview Cogeneration PlantChannelview, TX5.5 TWh6.4 mi
Enterprise Products OperatingMont Belvieu, TX150.1 GWh6 mi
Exelon LaPorte Generating StationLaPorte, TX70.7 GWh10.6 mi
ExxonMobil Baytown RefineryBaytown, TX1.2 TWh6.7 mi
ExxonMobil Baytown TurbineBaytown, TX2.6 TWh6.2 mi
Houston Chemical Complex BattlegroundHouston, TX1.7 TWh9 mi
Mont Belvieu Cogeneration UnitMont Belvieu, TX76.8 GWh7 mi
Odyssey Energy Altura Cogen, LLCChannelview, TX3.4 TWh5.9 mi
RavenChemBaytown, TX422.0 MWh6.4 mi
San Jacinto Steam Electric StationLa Porte, TX751.6 GWh10.7 mi
Shell Deer ParkDeer Park, TX1.1 TWh11 mi
SJRR (LIG)Houston, TX74.1 GWh6.2 mi
WAL194Baytown, TX305.0 MWh5.6 mi
WAL2439Baytown, TX331.0 MWh7.3 mi
WAL3500Houston, TX315.0 MWh9.4 mi
WAL522Crosby, TX338.0 MWh4.3 mi