Coyote Wind LLC
9899 County Road 1137, Snyder, TX 79549Plant Summary Information
Coyote Wind LLC is ranked #79 out of 224 wind farms in Texas in terms of total annual net electricity generation.
Coyote Wind LLC generated 117.9 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Coyote Wind LLC |
|---|---|
| Utility Name | EDF Renewable Asset Holdings, Inc. |
| Location | Scurry County, TX |
| Initial Operation Date | January 2021 |
| Last Update | Sep 2025 |
| Annual Generation | 635.5 GWh |
| Annual Consumption | 2.3 M MMBtu |
| Ranked #1,079 out of 12,539 Power Plants Nationwide | |
| Ranked #242 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #204 out of 799 Texas Power Plants | |
| Ranked #79 out of 224 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Coyote Wind LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Coyote Wind LLC.
Monthly Net Generation for Coyote Wind LLC
Coyote Wind LLC Details
| Summary Information | |
|---|---|
| Plant Name | Coyote Wind LLC (63655) |
| Plant Address | 9899 County Road 1137, Snyder, TX 79549 |
| Utility | EDF Renewable Asset Holdings, Inc. (57170) |
| Latitude, Longitude | 32.84879, -100.86646 |
| Generation Dates on File | Jan 2021 to Sep 2025 |
| Initial Operation Date | January 2021 |
| Annual Generation | 635.5 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 20-89-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator COY Details Operating January 2021
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 242.5 MW |
| Summer Capacity | 242.5 MW |
| Winter Capacity | 242.5 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 59 |
| Turbine Details | |
| Number Of Turbines | 59 |
|---|---|
| Predominant Turbine Manufacturer | Siemens Gamesa |
| Predominant Turbine Model Number | SG 4.5-145 |
| Design Wind Speed | 15.6 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 352.7 |
Coyote Wind LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #232 | Wildcat Ranch Wind Project | Morton, TX | 649.0 GWh |
| #233 | Aragonne Wind LLC | Santa Rosa, NM | 645.5 GWh |
| #234 | Sweetwater Wind 4 LLC | Roscoe, TX | 644.6 GWh |
| #235 | Reading Wind Project | Reading, KS | 644.1 GWh |
| #236 | Sugar Creek Wind One LLC | TBD, IL | 642.8 GWh |
| #237 | Meadow Lake Wind Farm VI LLC | Remington, IN | 639.7 GWh |
| #238 | Brady II Wind Energy Center | Dickinson, ND | 638.9 GWh |
| #239 | Kelly Creek Wind Project | Cabery, IL | 638.3 GWh |
| #240 | Buckeye Wind Energy Center | Hays, KS | 638.1 GWh |
| #241 | El Sauz Ranch Wind, LLC | San Perlita, TX | 636.3 GWh |
| #243 | Glacier Sands Wind Power, LLC | Mason City, IL | 635.4 GWh |
| #244 | Chevelon Butte Wind Farm | Winslow, AZ | 633.1 GWh |
| #245 | Brady Wind Energy Center | Dickinson, ND | 632.3 GWh |
| #246 | Heart of Texas Wind Project | Brady, TX | 629.5 GWh |
| #247 | Rio Bravo Windpower, LLC | Roma, TX | 628.6 GWh |
| #248 | Oso Grande Wind Farm | Maljamar, NM | 628.5 GWh |
| #249 | Horizon Hill Wind Project | Crescent, OK | 626.6 GWh |
| #250 | Castle Gap Wind | Goldthwaite, TX | 626.0 GWh |
| #251 | Bison 4 Wind Energy Center | New Salem, ND | 624.2 GWh |
| #252 | Limon III Wind LLC | Limon, CO | 623.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Coyote Wind LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amadeus Wind Farm | Rotan, TX | 708.3 GWh | 19.3 mi |
| BayWa r.e Mozart LLC | Jayton, TX | 54.1 GWh | 21.5 mi |
| Brazos Wind Farm | Fluvanna, TX | 658.7 GWh | 17.7 mi |
| Canyon Wind Project, LLC | Scurry, TX | 1.1 TWh | 17.2 mi |
| Dermott Wind | Snyder, TX | 876.2 GWh | 6.4 mi |
| EG178 Facility | Snyder, TX | 713.1 GWh | 8.7 mi |
| Fluvanna | Fluvanna, TX | 520.0 GWh | 17.1 mi |
| Gopher Creek Wind Farm | Fluvanna, TX | 546.0 GWh | 20 mi |
| Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh | 29.5 mi |
| Juno Solar Project | Lamesa, TX | 767.8 GWh | 30.9 mi |
| Loraine Windpark Project LLC | Loraine, TX | 307.8 GWh | 29.3 mi |
| Lumina II Solar Project | Snyder, TX | 705.4 GWh | 7.4 mi |
| Lumina Solar Project | Snyder, TX | 687.8 GWh | 7.7 mi |
| Post Wind Farm LP | Fluvanna, TX | 314.8 GWh | 21.2 mi |
| Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 787.1 GWh | 21.2 mi |
| Roscoe Wind Farm LLC | Roscoe, TX | 352.5 GWh | 28.7 mi |
| Scurry County Wind II | Snyder, TX | 164.9 GWh | 10 mi |
| Scurry County Wind LP | Snyder, TX | 205.4 GWh | 11.6 mi |
| Texas Solar Nova 2 | Spur, TX | 562.0 GWh | 33.3 mi |
| WAL1272 | Snyder, TX | 176.0 MWh | 11.3 mi |