Coyote Wind LLC
9899 County Road 1137, Snyder, TX 79549Plant Summary Information
Coyote Wind LLC is ranked #80 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Coyote Wind LLC generated 188.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Coyote Wind LLC |
|---|---|
| Utility Name | EDF Renewable Asset Holdings, Inc. |
| Location | Scurry County, TX |
| Initial Operation Date | January 2021 |
| Last Update | Dec 2025 |
| Annual Generation | 646.1 GWh |
| Annual Consumption | 2.4 M MMBtu |
| Ranked #1,077 out of 12,613 Power Plants Nationwide | |
| Ranked #239 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #205 out of 816 Texas Power Plants | |
| Ranked #80 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Coyote Wind LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Coyote Wind LLC.
Monthly Net Generation for Coyote Wind LLC
Monthly Plant Fuel Consumption for Coyote Wind LLC
Coyote Wind LLC Details
| Summary Information | |
|---|---|
| Plant Name | Coyote Wind LLC (63655) |
| Plant Address | 9899 County Road 1137, Snyder, TX 79549 |
| Utility | EDF Renewable Asset Holdings, Inc. (57170) |
| Latitude, Longitude | 32.84879, -100.86646 |
| Generation Dates on File | Jan 2021 to Dec 2025 |
| Initial Operation Date | January 2021 |
| Annual Generation | 646.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 20-89-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator COY Details Operating January 2021
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 242.5 MW |
| Summer Capacity | 242.5 MW |
| Winter Capacity | 242.5 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 59 |
| Turbine Details | |
| Number Of Turbines | 59 |
|---|---|
| Predominant Turbine Manufacturer | Siemens Gamesa |
| Predominant Turbine Model Number | SG 4.5-145 |
| Design Wind Speed | 15.6 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 352.7 |
Coyote Wind LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #229 | Brazos Wind Farm | Fluvanna, TX | 658.7 GWh |
| #230 | California Ridge Wind Energy LLC | Fithian, IL | 653.4 GWh |
| #231 | TX Jumbo Road Wind | Hereford, TX | 652.5 GWh |
| #232 | Cedar Springs II | Douglas, WY | 652.4 GWh |
| #233 | Rio Bravo Windpower, LLC | Roma, TX | 652.3 GWh |
| #234 | Wildcat Ranch Wind Project | Morton, TX | 651.9 GWh |
| #235 | Minonk Wind Farm | Minonk, IL | 651.1 GWh |
| #236 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 650.5 GWh |
| #237 | Limon III Wind LLC | Limon, CO | 649.7 GWh |
| #238 | Bearkat | St. Lawrence, TX | 648.3 GWh |
| #240 | King Creek Wind Farm 2, LLC | Throckmorton, TX | 646.0 GWh |
| #241 | Chickasaw Wind Farm | New Hampton, IA | 645.4 GWh |
| #242 | Heart of Texas Wind Project | Brady, TX | 642.3 GWh |
| #243 | Meadow Lake Wind Farm VI LLC | Remington, IN | 641.8 GWh |
| #244 | Brady II Wind Energy Center | Dickinson, ND | 640.5 GWh |
| #245 | Foote Creek Rim | McFadden, WY | 636.2 GWh |
| #246 | Montgomery Ranch Wind Farm, LLC | Crowell, TX | 633.9 GWh |
| #247 | Sweetwater Wind 4 LLC | Roscoe, TX | 633.4 GWh |
| #248 | Reading Wind Project | Reading, KS | 632.9 GWh |
| #249 | Castle Gap Wind | Goldthwaite, TX | 632.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Coyote Wind LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amadeus Wind Farm | Rotan, TX | 716.5 GWh | 19.3 mi |
| BayWa r.e Mozart LLC | Jayton, TX | 54.1 GWh | 21.5 mi |
| Brazos Wind Farm | Fluvanna, TX | 658.7 GWh | 17.7 mi |
| Canyon Wind Project, LLC | Scurry, TX | 1.1 TWh | 17.2 mi |
| Dermott Wind | Snyder, TX | 872.6 GWh | 6.4 mi |
| EG178 Facility | Snyder, TX | 713.1 GWh | 8.7 mi |
| Fluvanna | Fluvanna, TX | 528.9 GWh | 17.1 mi |
| Gopher Creek Wind Farm | Fluvanna, TX | 591.7 GWh | 20 mi |
| Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh | 29.5 mi |
| Juno Solar Project | Lamesa, TX | 766.6 GWh | 30.9 mi |
| Loraine Windpark Project LLC | Loraine, TX | 307.8 GWh | 29.3 mi |
| Lumina II Solar Project | Snyder, TX | 700.2 GWh | 7.4 mi |
| Lumina Solar Project | Snyder, TX | 679.9 GWh | 7.7 mi |
| Post Wind Farm LP | Fluvanna, TX | 314.8 GWh | 21.2 mi |
| Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 792.3 GWh | 21.2 mi |
| Roscoe Wind Farm LLC | Roscoe, TX | 364.3 GWh | 28.7 mi |
| Scurry County Wind II | Snyder, TX | 164.9 GWh | 10 mi |
| Scurry County Wind LP | Snyder, TX | 205.4 GWh | 11.6 mi |
| Texas Solar Nova 2 | Spur, TX | 562.7 GWh | 33.3 mi |
| WAL1272 | Snyder, TX | 176.0 MWh | 11.3 mi |