Taygete II Energy Project
5177 Tipton Rd., Coyanosa, TX 79730Plant Summary Information
Taygete II Energy Project is ranked #46 out of 201 solar farms in Texas in terms of total annual net electricity generation.
Taygete II Energy Project generated 150.7 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Taygete II Energy Project |
|---|---|
| Utility Name | West Texas Solar Project II LLC |
| Location | Pecos County, TX |
| Initial Operation Date | July 2023 |
| Last Update | Sep 2025 |
| Annual Generation | 456.7 GWh |
| Annual Consumption | 1.7 M MMBtu |
| Ranked #1,438 out of 12,539 Power Plants Nationwide | |
| Ranked #122 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #291 out of 799 Texas Power Plants | |
| Ranked #46 out of 201 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
7X Energy, Inc. (2020 to 2020) West Texas Solar Project II LLC (2021 to 2024) |
Map of Taygete II Energy Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Taygete II Energy Project.
Monthly Net Generation for Taygete II Energy Project
Taygete II Energy Project Details
| Summary Information | |
|---|---|
| Plant Name | Taygete II Energy Project (64075) |
| Plant Address | 5177 Tipton Rd., Coyanosa, TX 79730 |
| Utility | West Texas Solar Project II LLC (64569) |
| Latitude, Longitude | 31.186, -103.128 |
| Generation Dates on File | Jan 2023 to Sep 2025 |
| Initial Operation Date | July 2023 |
| Annual Generation | 456.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator TAYG2 Details Operating July 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | TAYGETE2_ALL |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | NA |
| Nameplate Capacity | 203.8 MW |
| Summer Capacity | 203.8 MW |
| Winter Capacity | 203.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Other Solar Technology | No |
| Azimuth Angle | 180 |
| DC Net Capacity | 258.4 MW |
| Thin Film Other | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Taygete II Energy Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #112 | McFarland B Solar and Storage | Dateland, AZ | 478.9 GWh |
| #113 | Peregrine Solar | Gollad, TX | 478.1 GWh |
| #114 | True North Solar, LLC | Otto, TX | 477.0 GWh |
| #115 | ANSON Solar Center, LLC | Anson, TX | 477.0 GWh |
| #116 | Townsite Solar Project Hybrid | Boulder City, NV | 459.6 GWh |
| #117 | Sparta Solar | Pawnee, TX | 475.3 GWh |
| #118 | Delilah Solar Energy LLC | Bogota, TX | 470.4 GWh |
| #119 | Decatur Solar | Climax, GA | 469.8 GWh |
| #120 | White Wing Solar | Yuma, AZ | 467.0 GWh |
| #121 | Horizon Solar | Pearsall, TX | 459.4 GWh |
| #123 | Orion I Solar Project | Burlington, TX | 452.7 GWh |
| #124 | San Juan Solar I | Kirtland, NM | 434.5 GWh |
| #125 | Pike Solar Hybrid | Fountain, CO | 451.3 GWh |
| #126 | Blue Jay Solar I, LLC | Iola, TX | 445.6 GWh |
| #127 | Mesquite Solar 3, LLC | Tonopah, AZ | 448.5 GWh |
| #128 | Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 448.0 GWh |
| #129 | Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh |
| #130 | Hickory Park Solar Hybrid | Camilla, GA | 434.7 GWh |
| #131 | Tres Bahias | Port Lavaca, TX | 438.7 GWh |
| #132 | Chaparral Springs | Rosamond, CA | 427.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Taygete II Energy Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barilla Solar | Fort Stockton, TX | 53.7 GWh | 20.4 mi |
| Castle Gap Solar Hybrid | McCarney, TX | 389.2 GWh | 50.8 mi |
| Crane Solar Project | Crane, TX | 407.8 GWh | 48.5 mi |
| East Pecos Solar | McCamey, TX | 215.2 GWh | 51.7 mi |
| Emerald Grove | Crane, TX | 258.8 GWh | 45.9 mi |
| Greasewood II LLC | Girvin, TX | 797.6 GWh | 31.4 mi |
| Greasewood Solar | Fort Stockton, TX | 371.1 GWh | 39.3 mi |
| Oberon IA | Odessa, TX | 306.3 GWh | 43.7 mi |
| Oberon IB | Odessa, TX | 61.4 GWh | 43.2 mi |
| Permian Basin | Monahans, TX | 464.5 GWh | 29.2 mi |
| Phoebe Solar | Kermit, TX | 554.5 GWh | 47.9 mi |
| RE Roserock | Fort Stockton, TX | 378.3 GWh | 18.8 mi |
| Sherbino II | Ft. Stockton, TX | 570.6 GWh | 46.6 mi |
| Swift Air Solar I | Goldsmith, TX | 228.1 GWh | 47.6 mi |
| Taygete Energy Project LLC | Coyanosa, TX | 515.9 GWh | 1.4 mi |
| Upton County Solar | McCamey, TX | 305.6 GWh | 49.7 mi |
| WAL897 | Fort Stockton, TX | 103.0 MWh | 23.9 mi |
| West of the Pecos Solar | TBD, TX | 249.8 GWh | 39.3 mi |
| Woodward Mountain I | Girvin, TX | 168.0 GWh | 45.3 mi |
| Woodward Mountain II | Girvin, TX | 168.0 GWh | 45.3 mi |