Taygete II Energy Project
5177 Tipton Rd., Coyanosa, TX 79730Plant Summary Information
Taygete II Energy Project is ranked #42 out of 150 solar farms in Texas in terms of total annual net electricity generation.
Taygete II Energy Project generated 118.6 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Taygete II Energy Project |
---|---|
Utility Name | West Texas Solar Project II LLC |
Location | Pecos County, TX |
Initial Operation Date | Not Available |
Last Update | Feb 2024 |
Annual Generation | 311.3 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,861 out of 11,455 Power Plants Nationwide | |
Ranked #131 out of 5,173 Solar Power Plants Nationwide | |
Ranked #326 out of 726 Texas Power Plants | |
Ranked #42 out of 150 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
7X Energy, Inc. (2020 to 2020) West Texas Solar Project II LLC (2021 to 2022) |
Map of Taygete II Energy Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Taygete II Energy Project.
Monthly Net Generation for Taygete II Energy Project
Taygete II Energy Project Details
Summary Information | |
---|---|
Plant Name | Taygete II Energy Project (64075) |
Plant Address | 5177 Tipton Rd. Coyanosa, TX 79730 |
Utility | West Texas Solar Project II LLC (64569) |
Latitude, Longitude | 31.186, -103.128 |
Generation Dates on File | Jul 2023 to Feb 2024 |
Initial Operation Date | Not Available |
Annual Generation | 311.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Taygete II Energy Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#121 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 321.7 GWh |
#122 | Springbok Solar Farm 1 | Cantil, CA | 319.0 GWh |
#123 | Edwards Sanborn E2 | Mojave, CA | 300.5 GWh |
#124 | Arlington Energy Center III | Blythe, CA | 299.2 GWh |
#125 | Maverick Solar, LLC | Desert Center, CA | 317.7 GWh |
#126 | SR DeSoto I, LLC | DeSoto, GA | 317.4 GWh |
#127 | Drew Solar LLC | Calexico, CA | 316.5 GWh |
#128 | Blythe Solar IV, LLC | Blythe, CA | 307.4 GWh |
#129 | Elm Branch Solar 1 | Bardwell, TX | 315.1 GWh |
#130 | Elara Solar | Pearsall, TX | 314.7 GWh |
#132 | Midway Solar - TX | Fort Stockton, TX | 309.2 GWh |
#133 | Blythe Solar 110, LLC | Blythe, CA | 287.2 GWh |
#134 | Harry Allen Solar Energy LLC | Apex, NV | 307.2 GWh |
#135 | Emerald Grove | Crane, TX | 306.0 GWh |
#136 | Montague Solar | Arlington, OR | 304.4 GWh |
#137 | Bluebell Solar II | Sterling, TX | 304.1 GWh |
#138 | Hudson - High Desert Hybrid | Victorville, CA | 295.6 GWh |
#139 | Hardin Solar Energy LLC | Alger, OH | 303.7 GWh |
#140 | Blue Jay Solar I, LLC | Iola, TX | 300.6 GWh |
#141 | Imperial Solar Energy Center South | Calexico, CA | 302.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Taygete II Energy Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 259.1 GWh | 52.4 mi |
Barilla Solar | Fort Stockton, TX | 79.1 GWh | 20.4 mi |
Castle Gap Solar Hybrid | McCarney, TX | 423.2 GWh | 50.8 mi |
CED Crane Solar | Crane, TX | 433.6 GWh | 48.5 mi |
East Pecos Solar | McCamey, TX | 284.8 GWh | 51.7 mi |
Emerald Grove | Crane, TX | 306.0 GWh | 45.9 mi |
Greasewood Solar | Fort Stockton, TX | 219.3 GWh | 39.3 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 612.0 GWh | 52.4 mi |
Oberon IA | Odessa, TX | 345.4 GWh | 43.7 mi |
Oberon IB | Odessa, TX | 68.8 GWh | 43.2 mi |
Permian Basin | Monahans, TX | 131.1 GWh | 29.2 mi |
Phoebe Solar | Kermit, TX | 559.5 GWh | 47.9 mi |
RE Roserock | Fort Stockton, TX | 411.4 GWh | 18.8 mi |
Sherbino II | Ft. Stockton, TX | 613.1 GWh | 46.6 mi |
Taygete Energy Project LLC | Coyanosa, TX | 570.1 GWh | 1.4 mi |
Upton County Solar | McCamey, TX | 302.1 GWh | 49.7 mi |
WAL897 | Fort Stockton, TX | 133.1 MWh | 23.9 mi |
West of the Pecos Solar | TBD, TX | 247.8 GWh | 39.3 mi |
Woodward Mountain I | Girvin, TX | 193.8 GWh | 45.3 mi |
Woodward Mountain II | Girvin, TX | 184.4 GWh | 45.3 mi |