Taygete II Energy Project
5177 Tipton Rd., Coyanosa, TX 79730Plant Summary Information
Taygete II Energy Project is ranked #55 out of 219 solar farms in Texas in terms of total annual net electricity generation.
Taygete II Energy Project generated 90.2 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Taygete II Energy Project |
|---|---|
| Utility Name | West Texas Solar Project II LLC |
| Location | Pecos County, TX |
| Initial Operation Date | July 2023 |
| Last Update | Mar 2026 |
| Annual Generation | 470.1 GWh |
| Annual Consumption | 1.7 M MMBtu |
| Ranked #1,423 out of 12,332 Power Plants Nationwide | |
| Ranked #136 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #291 out of 814 Texas Power Plants | |
| Ranked #55 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
7X Energy, Inc. (2020 to 2020) West Texas Solar Project II LLC (2021 to 2024) |
Map of Taygete II Energy Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Taygete II Energy Project.
Monthly Net Generation for Taygete II Energy Project
Monthly Plant Fuel Consumption for Taygete II Energy Project
Taygete II Energy Project Details
| Summary Information | |
|---|---|
| Plant Name | Taygete II Energy Project (64075) |
| Plant Address | 5177 Tipton Rd., Coyanosa, TX 79730 |
| Utility | West Texas Solar Project II LLC (64569) |
| Latitude, Longitude | 31.186, -103.128 |
| Generation Dates on File | Jan 2023 to Mar 2026 |
| Initial Operation Date | July 2023 |
| Annual Generation | 470.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator TAYG2 Details Operating July 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | TAYGETE2_ALL |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | NA |
| Nameplate Capacity | 203.8 MW |
| Summer Capacity | 203.8 MW |
| Winter Capacity | 203.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Other Solar Technology | No |
| Azimuth Angle | 180 |
| DC Net Capacity | 258.4 MW |
| Thin Film Other | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Taygete II Energy Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #126 | Ray Ranch Solar | Pettus, TX | 485.9 GWh |
| #127 | Decatur Solar | Climax, GA | 482.6 GWh |
| #128 | Dunns Bridge I Solar | Wheatfield, IN | 482.4 GWh |
| #129 | Scarlet Solar (CA) | Fresno, CA | 473.5 GWh |
| #130 | Sparta Solar | Pawnee, TX | 480.7 GWh |
| #131 | Big Elm Solar | Troy, TX | 480.4 GWh |
| #132 | Long Lake Solar, LLC | West Helena, AR | 476.3 GWh |
| #133 | Townsite Solar Project Hybrid | Boulder City, NV | 461.2 GWh |
| #134 | Horizon Solar | Pearsall, TX | 474.6 GWh |
| #135 | Estonian Solar Project, LLC | Cooper, TX | 463.9 GWh |
| #137 | Golden Triangle | Lowndes, MS | 448.6 GWh |
| #138 | Tres Bahias | Port Lavaca, TX | 454.9 GWh |
| #139 | Fairbanks Solar Project | Fairbanks, IN | 454.5 GWh |
| #140 | Orion I Solar Project | Burlington, TX | 450.5 GWh |
| #141 | Mesquite Solar 3, LLC | Tonopah, AZ | 445.1 GWh |
| #142 | Pike Solar Hybrid | Fountain, CO | 443.7 GWh |
| #143 | Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh |
| #144 | White Wing Solar | Yuma, AZ | 443.3 GWh |
| #145 | Blue Jay Solar I, LLC | Iola, TX | 437.0 GWh |
| #146 | TS Power Plant | Battle Mountain, NV | 1.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Taygete II Energy Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barilla Solar | Fort Stockton, TX | 53.7 GWh | 20.4 mi |
| Castle Gap Solar Hybrid | McCarney, TX | 368.4 GWh | 50.8 mi |
| Crane Solar Project | Crane, TX | 403.8 GWh | 48.5 mi |
| Emerald Grove | Crane, TX | 250.1 GWh | 45.9 mi |
| Greasewood II LLC | Girvin, TX | 857.2 GWh | 31.4 mi |
| Greasewood Solar | Fort Stockton, TX | 433.4 GWh | 39.3 mi |
| Oberon IA | Odessa, TX | 283.8 GWh | 43.7 mi |
| Oberon IB | Odessa, TX | 54.4 GWh | 43.2 mi |
| Permian Basin | Monahans, TX | 464.5 GWh | 29.2 mi |
| Phoebe Solar | Kermit, TX | 529.6 GWh | 47.9 mi |
| RE Roserock | Fort Stockton, TX | 371.7 GWh | 18.8 mi |
| Sherbino II | Ft. Stockton, TX | 570.6 GWh | 46.6 mi |
| Swift Air Solar I | Goldsmith, TX | 402.4 GWh | 47.6 mi |
| Swift Air Solar II | Odessa, TX | 119.3 GWh | 51.6 mi |
| Taygete Energy Project LLC | Coyanosa, TX | 545.8 GWh | 1.4 mi |
| Upton County Solar | McCamey, TX | 283.0 GWh | 49.7 mi |
| WAL897 | Fort Stockton, TX | 103.0 MWh | 23.9 mi |
| West of the Pecos Solar | TBD, TX | 234.1 GWh | 39.3 mi |
| Woodward Mountain I | Girvin, TX | 168.0 GWh | 45.3 mi |
| Woodward Mountain II | Girvin, TX | 168.0 GWh | 45.3 mi |