Orion III Solar Project
664 County Road 116A, Buckholts, TX 76569Plant Summary Information
Orion III Solar Project is ranked #32 out of 215 solar farms in Texas in terms of total annual net electricity generation.
Orion III Solar Project generated 110.0 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Orion III Solar Project |
|---|---|
| Utility Name | Ben Milam Solar 3 LLC |
| Location | Milam County, TX |
| Initial Operation Date | August 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 551.8 GWh |
| Annual Consumption | 2.0 M MMBtu |
| Ranked #1,249 out of 12,613 Power Plants Nationwide | |
| Ranked #88 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #246 out of 816 Texas Power Plants | |
| Ranked #32 out of 215 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Orion III Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Orion III Solar Project.
Monthly Net Generation for Orion III Solar Project
Monthly Plant Fuel Consumption for Orion III Solar Project
Orion III Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Orion III Solar Project (66821) |
| Plant Address | 664 County Road 116A, Buckholts, TX 76569 |
| Utility | Ben Milam Solar 3 LLC (65782) |
| Latitude, Longitude | 30.96022, -97.12452 |
| Generation Dates on File | Aug 2024 to Dec 2025 |
| Initial Operation Date | August 2024 |
| Annual Generation | 551.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator ORN3 Details Operating August 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 250 MW |
| Summer Capacity | 250 MW |
| Winter Capacity | 250 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 325 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Orion III Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #78 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 543.7 GWh |
| #79 | Delilah Solar Energy LLC | Bogota, TX | 557.8 GWh |
| #80 | Phoebe Solar | Kermit, TX | 557.3 GWh |
| #81 | Oxbow Solar 1 | New Roads, LA | 556.4 GWh |
| #82 | True North Solar, LLC | Otto, TX | 556.4 GWh |
| #83 | Porter Solar, LLC (TX) | Krum, TX | 556.3 GWh |
| #84 | Desert Sunlight 250, LLC | Desert Center, CA | 555.7 GWh |
| #85 | Sun Valley Solar Project | Abbott, TX | 555.7 GWh |
| #86 | Orion II Solar Project | Rosebud, TX | 552.1 GWh |
| #87 | Galloway 1 Solar Farm | Paint Rock, TX | 551.9 GWh |
| #89 | Dodge Flat | Reno, NV | 546.0 GWh |
| #90 | McFarland A Solar and Storage | Dateland, AZ | 542.3 GWh |
| #91 | Golden Field Solar III, LLC | Rosamond, CA | 520.9 GWh |
| #92 | Taygete Energy Project LLC | Coyanosa, TX | 547.5 GWh |
| #93 | Stampede Solar Hybrid | Saltillo, TX | 540.8 GWh |
| #94 | Agua Caliente Solar Project | Dateland, AZ | 546.9 GWh |
| #95 | Azure Sky Solar | Haskell, TX | 536.8 GWh |
| #96 | Daggett 2 | Daggett, CA | 518.9 GWh |
| #97 | Sun Streams 3 | Arlington, AZ | 493.5 GWh |
| #98 | Noble Solar | Krum, TX | 528.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Orion III Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Big Elm Solar | Troy, TX | 481.4 GWh | 13.6 mi |
| Blevins Solar & Storage | TX | 24.7 GWh | 17.7 mi |
| BPL Crown Solar LLC | Chilton, TX | 211.8 GWh | 26.8 mi |
| BPL Sol Solar LLC | Chilton, TX | 207.8 GWh | 26.8 mi |
| BT Jungmann | Buckholts, TX | 85.3 GWh | 5.6 mi |
| Eddy II | Eddy, TX | 16.6 GWh | 24.2 mi |
| Five Wells Solar Center - Hybrid | Rogers, TX | 722.6 GWh | 8.4 mi |
| Gransolar Texas One, LLC | Thorndale, TX | 110.6 GWh | 25 mi |
| HEB00182 | Temple, TX | 217.0 MWh | 16.5 mi |
| HEBTEMDistCenter | Temple, TX | 618.0 MWh | 19.3 mi |
| HEBTEMDistCenter1B | Temple, TX | 309.0 MWh | 19.3 mi |
| HEBTEMDistCenter2A | Temple, TX | 309.0 MWh | 19.3 mi |
| Major Oak Power | Bremond, TX | 2.2 TWh | 27 mi |
| Marlin Solar | Marlin, TX | 9.9 GWh | 26.9 mi |
| OCI Stillhouse Solar | Rogers, TX | 53.8 GWh | 2.5 mi |
| Orion I Solar Project | Burlington, TX | 446.1 GWh | 7.7 mi |
| Orion II Solar Project | Rosebud, TX | 552.1 GWh | 12.2 mi |
| Temple Power Station | Temple, TX | 7.6 TWh | 13.2 mi |
| WAL1232 | Belton, TX | 237.0 MWh | 21.4 mi |
| WAL6929 | Temple, TX | 271.0 MWh | 20.2 mi |