Cutlass Solar II
Intersection of Boothline Rd a, Richmond, TX 77469Plant Summary Information
Cutlass Solar II is ranked #56 out of 190 solar farms in Texas in terms of total annual net electricity generation.
Cutlass Solar II generated 97.7 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Cutlass Solar II |
---|---|
Utility Name | Cutlass II Solar LLC |
Location | Fort Bend County, TX |
Initial Operation Date | July 2024 |
Last Update | Apr 2025 |
Annual Generation | 326.5 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,802 out of 12,299 Power Plants Nationwide | |
Ranked #171 out of 6,182 Solar Power Plants Nationwide | |
Ranked #340 out of 792 Texas Power Plants | |
Ranked #56 out of 190 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
CT Cutlass II Solar LLC (2022 to 2022) Cutlass II Solar LLC (2023 to 2024) |
Map of Cutlass Solar II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cutlass Solar II.
Monthly Net Generation for Cutlass Solar II
Cutlass Solar II Details
Summary Information | |
---|---|
Plant Name | Cutlass Solar II (66262) |
Plant Address | Intersection of Boothline Rd a, Richmond, TX 77469 |
Utility | Cutlass II Solar LLC (65361) |
Latitude, Longitude | 29.39, -95.78 |
Generation Dates on File | Jul 2024 to Apr 2025 |
Initial Operation Date | July 2024 |
Annual Generation | 326.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | pending |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells |
Ash Impoundment | |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator SAREN Details Operating July 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 202.8 MW |
Nameplate Power Factor | 0.93 |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 271 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Cutlass Solar II Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#161 | Edwards Sanborn E1A | Mojave, CA | 332.8 GWh |
#162 | Arlington Valley Solar Energy II | Arlington, AZ | 341.2 GWh |
#163 | Upton County Solar | McCamey, TX | 340.7 GWh |
#164 | South Cheyenne Solar | South Greeley, WY | 338.2 GWh |
#165 | Atrisco Solar LLC | Rio Rancho, NM | 336.6 GWh |
#166 | Skipjack Solar Center | Wayside, VA | 336.6 GWh |
#167 | Ganado Solar | Gail, TX | 327.3 GWh |
#168 | American Kings Solar, LLC | Lemoore, CA | 329.6 GWh |
#169 | Arlington Energy Center III | Blythe, CA | 303.4 GWh |
#170 | Midway Solar - TX | Fort Stockton, TX | 328.4 GWh |
#172 | Blythe Solar IV, LLC | Blythe, CA | 317.0 GWh |
#173 | Big River Solar | Norris City, IL | 325.0 GWh |
#174 | Desert Quartzite | Blythe, CA | 315.4 GWh |
#175 | Orion I Solar Project | Burlington, TX | 323.5 GWh |
#176 | Quitman Solar | Quitman, GA | 321.6 GWh |
#177 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 297.9 GWh |
#178 | Sun Streams 2 | Hassayampa, AZ | 320.9 GWh |
#179 | Umbriel Solar | Livington, TX | 320.6 GWh |
#180 | Edwards Sanborn E4 | Mojave, CA | 312.5 GWh |
#181 | Fort Powhatan Solar | Disputanta, VA | 319.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cutlass Solar II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Braes Bayou Plant | Richmond, TX | 347.5 GWh | 11.5 mi |
Brazoria County Solar Project (Danciger) | Damon, TX | 402.8 GWh | 14.7 mi |
Brazoria West | Damon, TX | 410.7 GWh | 15.5 mi |
Bronson | Beasley, TX | 9.6 GWh | 15.3 mi |
Colorado Bend Energy Center | Wharton, TX | 2.1 TWh | 18.7 mi |
Colorado Bend II | Wharton, TX | 6.7 TWh | 18.5 mi |
Cutlass Solar 1 LLC | Richmond, TX | 196.4 GWh | 3.1 mi |
Fighting Jays Solar Project | Needville, TX | 291.9 GWh | 3 mi |
Fort Bend Solar LLC | East Bernard, TX | 453.7 GWh | 16.8 mi |
FTBLID2 | Sugarland, TX | 130.0 MWh | 15.4 mi |
HEB00110 | Missouri City, TX | 179.0 MWh | 17.8 mi |
Jack Fusco Energy Center | Thompsons, TX | 3.4 TWh | 11 mi |
Newgulf Cogen | NewGulf, TX | 12.7 GWh | 11.3 mi |
Old 300 Solar Center, LLC | Needville, TX | 877.4 GWh | 4.8 mi |
Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.8 GWh | 10.6 mi |
Second Division Solar | West Columbia, TX | 60.0 GWh | 15.3 mi |
W A Parish | Thompsons, TX | 14.2 TWh | 11 mi |
Wagyu | Damon, TX | 211.9 GWh | 12.6 mi |
WAL2993 | Sugar Land, TX | 255.0 MWh | 17.5 mi |
WAL546 | Richmond, TX | 178.0 MWh | 11.7 mi |